JRA1.1 - EMI Technical Objectives - Cross Area 1

Define the Information Flow architecture (M9)

Responsible : Infrastructure Area Leader (Laurence Field)

Technical Objective Details

  • Full description : Define the Information Flow architecture describing messaging and non-messaging based information exchange of the EMI components (e.g. service registry, information system, accounting, monitoring, and instrumentation). A common information exchange between the EMI components is preferable.
  • Objective Version : 2010-10-31 (DNA1.3.1 - v014)
  • Cross Area - Technical Objective 1
  • Due : M9

The following components are affected in the context of this technical objective :

  • all EMI services

Concrete Results

  • Wiki page or document about the information flow architecture
    • Status : Initial draft created by Laurence
    • Deadline : 01/2011

Open Issues

  • Why has been this objective moved from infrastructure area to cross-area?
  • Does this has an effect on the responsibilities?

Tracking

  • [2010-11-01] Morris : Tech Objective updates from DNA1.3.1; Addressed by various affected components
  • [2010-11-01] Morris : Requested from Laurence a few updates on this related to the update of this technical objective

Next Steps

  • TBD (Morris): Status Check @ 2010-11-08
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2010-11-01 - MorrisRiedelExCern
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    EMI All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback