TWiki> EMI Web>InfrastructureArea (revision 27)EditAttachPDF

Infrastructure Area

DONE

Sub Tasks

ID Sub Task Responsible Due Status Comment
9 Identify list of required monitoring probes Laurence Field M14 DONE ProbeTracker (14/06/2011)
13 Obtain Storage Accounting Record Laurence Field M14 DONE http://cdsweb.cern.ch/record/1352472 (14/06/2011)
22 Infrastructure Area simplification plan Laurence Field M18 DONE Presented at the 3rd EMI all hands meeting

Objectives

The general objectives for EMI are outlined in the Description of Work (DOW). Specific technical objects have been extracted from the DOW and have been augmented with the requirements from EGI. Technical Development Plan gives an overview of these objectives. Detailed descriptions of the objectives relevant to the Infrastructure Area can be found in the Infrastructure Area Work Plan and Status Report. The following table gives the list of objective outline in the Work Plan along with the current status.

ID Objective Due Status Comment
1 Investigate the use of messaging for Accounting M14 DONE Document to be provided by John
2 Investigate the use of messaging for Service Monitoring and Management M14 DONE Survey result
3 EMI Registry implementation M22 DONE Available in EMI 2
4 GLUE 2 information model support M20 DONE All dev tasks complete
5 Messaging guidelines M22 DONE  
6 EMI Cloud and Virtualization architecture M24 DONE Moved To NA3
7 Usage Record publishing via messaging M28   In progress
8 Infrastructure Area simplification plan M18 DONE  
9 Service Management investigation M24 DONE Survey Result
10 Infrastructure Area simplication M? DONE Accounting and ERIS
11 Monitoring interfaces M30 DONE Surevy Result
12 Client tool usability M22 DONE Nothing Todo
13 Operating system standards M18 DONE Al dev tasks complete
14 Platform support M22    
15 Monitoring Probes M18 DONE Available in EMI 2
16 EMI Resource Information Service M24 DONE Available in EMI 2

Product Teams

The following table is the list of PTs in the Infrastructure Area as defined in the Technical Development Plan.

Name Leader Products Main Areas
ARC LDAP-based Infosys Mattias Ellert Classic Infoserver (localLDAP), Classic Infoindex (EGIIS), Grid Monitor, infoproviders Infrastructure
APEL client John Gordon glite-APEL, APEL parsers Infrastructure
gLite Information System Laurence Field BDII, Glue model, Service info provider, site info provider, Infosys test suit, two cli (lcg-info and lcg-infosites) Infrastructure
EMI Registry Shiraz Memon in design & development Infrastructure
EMI Messaging Lionel Cons in design & development Infrastructure
SAGA Antony Wilson SAGA Service Discovery Infrastructure

Task Forces

Task Force: Remote Service Management Task Force: Service Monitoring Task Force: Accounting Task Force: ERIS

Internal Communication

Most of the communication within the Infrastructure Area is conducted via the email list. To subscribe to this list, please go to the subscription page. A bi-weekly phone conference take place using the EVO system to keep everyone informed of the current status and for discussion. The agenda for these meetings, along with the minutes can be found in indico. The announcement for this meeting will be send to the infra email list. Face2Face meetings will also be announced via the email list and the agenda will be also found in indico.

Edit | Attach | Watch | Print version | History: r30 < r29 < r28 < r27 < r26 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r27 - 2012-05-16 - LaurenceField
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    EMI All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback