Production Release Criteria

Note that this twiki contains a draft version of the Production Release Criteria to be approved by PEB.

Latest approved version of this document
DRAFT

Introduction

The Producton Release criteria defines the minimum set of criteria considered to be essential in a component release scheduled for production. The criteria will be checked by QC who will write a QC report informing about the compliance with the criteria. This check takes place once the component release has been certified by the PT as described in the Change Management Policy. The Production release criteria may change throughout the lifetime of the project. Changes will be agreed with PEB and QC, and announced to PTs.

QC Verification Report

The acceptance criteria is checked by QC for every certified component release. The review of the acceptance criteria is reported in the QC report. A template can be found below.

********************
EMI QC report 
********************

- Component: 

- Savannah task:

- EMI Major Release:

- Platform: 

- Author: 

- Date:

*************
Summary 
*************

List of RfCs:
- Available [ yes/no ]

List of packages:
- Available [ yes/no ]

Test Report: 
- Available [ yes/no ]
- Succesful [ yes/no ]
- Remarks

Certification Report: 
- Available [ yes/no ]
- Succesful [ yes/no ]
- Remarks

Release Notes:
- Available [ yes/no ]
- Structure OK [ yes/no ]
- Contents OK [ yes/no ]

Minimum Required Documentation URLs:
- Available [ yes/no ]
- Up to date [ yes/no ]

Change Management Criteria

Every component release must be tracked in a Component Release task created by the release manager in the EMI release tracker. PTs must fill in the remaining fields not provided by the release manager.

All the changes included in the component release must be tracked in an RfC in the PT tracking tool and attached to the Component Release task.

The details of Component Release tasks and RfCs can be found in the Change Management Policy.

Integration and Configuration criteria

TBD

Packaging criteria

TBD

Testing criteria

TBD (Test Report)

Certification criteria

TBD (Certification Report)

Documentation criteria

TBD (Release Notes and Minimum Required Documentation URLs)

-- MariaALANDESPRADILLO - 06-Dec-2010

Edit | Attach | Watch | Print version | History: r23 | r6 < r5 < r4 < r3 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r4 - 2011-03-07 - MariaALANDESPRADILLO
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    EMI All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback