Abstract (D1.S2)
The baseline scenario for the Feasibility Study and the main parameters of the FCC colliders will be described. The technical infrastructure system requirements and parameters will be summarised for each of the eight surface sites according to the new layout and machine optimisation. The civil engineering layout will also be described