FCC Home   FCCIS Home      

Abstract (D1.S2)

The baseline scenario for the Feasibility Study and the main parameters of the FCC colliders will be described. The technical infrastructure system requirements and parameters will be summarised for each of the eight surface sites according to the new layout and machine optimisation. The civil engineering layout will also be described

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2023-02-14 - PanagiotisCharitos
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    FCC All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback