FCC Home   FCCIS Home      

FCC-ee Accelerator Subprojects

1. Collider

1.1. Optics and Layout

1.2. Polarisation and energy calibration

1.3. Final Focus

1.4. Machine Detector Interface

2. Normal conducting magnets

3. Superconducting magnets

4. Superconducting Radiofrequency Systems

  • Cavities
  • Cryomodules
  • Fundamental Power Couplers (FPC) and Higher Order Mode (HOM) couplers
  • Low-Level RF
  • RF power sources
    • Klystrons
    • Solid state amplifiers

5. Magnet and RF powering

6. Cryogenics

7. Collimation and absorbers

8. Vacuum system

9. Beam Diagnostics and Instrumentation

10. Alignment

11. Controls

2. Booster

3. Injector

3.1. Positron Source

3.2. Linac

3.3. Damping ring

4.5. Transfer lines

12. Technical Infrastructures

12.1. Accelerator technical infrastructures

12.2. Operation

  • Global operation concept and integration with CERN operation
  • Injector operation
  • Collider operation
  • Infrastructure operation
  • Availability and reliability
  • Energy management and saving
  • Radiation effects management and control

-- JohannesGutleber - 2020-06-12

Edit | Attach | Watch | Print version | History: r8 < r7 < r6 < r5 < r4 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r8 - 2020-12-04 - JohannesGutleber
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    FCC All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback