Future Circular Collider (FCC) is a feasibility and design project for a new, particle collider based research infrastructure. Understanding the origins of matter...
Project members should upload their publications on the Zenodo communitites and are responsible for archiving all their technical scientific reports. Zenodo provides...
Resources and Guidelines for Publications On this page you can find useful information for preparing scientific publications in the FCC project including any FCC covered...
BeatrizAriasAlonso 2023 03 01 MS Project integrated plan Below the link to vXXXX (last updated DD MM YYYY) of the integrated project plan in pdf format. trial...
Scientific Advisory Committee The FCC project and the FCCIS EU co funded project feature the same advisory committee. This committee is an evolution of the FCC Study...
Link to PBS. FCC ee Accelerator Subprojects 0. Version Summaryand Test page FCCeeTest 1. Collider 1.1. Parameters 1.1.1. Parameter Tables and Requirements...
General Meeting Schedule Information this page shows a general meeting schedule of the FCC project to permit project participants following easily those meetings...
Abstract (D6.S2) Updated FCC hh layout under the baseline scenario, including the injection lines from the LHC and/or a possible superconducting SPS. The overall layout...
Abstract (D8.S4) Improve the evaluation of the requirements for FCC ee experiments using key physics processes that drive the physics case as benchmarks. This will...
Abstract (D8.S2) FCC ee: The full exploitation of the significantly increased experimental precision in Z pole observables, W boson and top quark masses, b and decays...
Abstract (D8.S1) Consolidation of the physics case and detector concepts for both colliders. In the area of physics, experiments and detectors that are covered by...
Abstract (D7.S1) The deliverable will provide an updated estimate of the cost for the stage 1 project, i.e. the construction of the entire civil engineering infrastructure...
Abstract (D6.S4) Completion of the design of the collider optics with new designs for collimation and extraction/dump insertions. The new layout imposes some in depth...
Abstract (D6.S3) Integration study of the FCC hh injection lines with the FCC tunnel. A new approach to the design of the injection lines for the FCC hh is being implemented...
Abstract (D6.S1) Development of R D plans, schedule and deliverables for Nb3Sn, high temperature superconducting (HTS) and hybrid magnets for FCC hh. The list of the...
Abstract (D5.S6) The RF implications for working point sequences that are non monotonic in energy appear significant; a comparative analysis against the baseline scenario...
Abstract (D5.S4) The comparative analysis of using either the SPS or a dedicated high energy linac as a pre booster for the FCC ee is being pursued by the injector...
Abstract (D5.S2) The overall optimisation of the RF configuration and integration for the FCC ee collider and the full energy booster is given major attention since...
Abstract (D5.S1) The machine optics have been adapted to the new layout with eight surface sites instead of twelve, a circumference of about 91.1 km and a perfect...
Abstract (D4.S2) The report will summarise the external resource requirements (e.g. electricity, water) for each of the eight surface sites for FCC ee and outline...
Abstract (D4.S1) The report will summarise the requirements for and parameters of the main technical infrastructure systems (electrical network, cooling and ventilation...
Abstract (D3.S9) This deliverable will be developed in the framework of the EC co funded H2020 Future Circular Collider Innovation Study (FCCIS). It includes quantitative...
Abstract (D3.S8) This deliverable is based on the outcome of the `Mining the Future` competition, the winner of which will be announced on 27 September 2022 following...
Abstract (D3.S6) The deliverable will outline a preliminary concept for the supply of FCC ee with electrical energy as well as possible ways of adapting the FCC ee...
Abstract (D3.S5) A report will describe the approach and intermediate status of the environmental initial state studies as the legally required pre condition for the...
Abstract (D3.S1) A comprehensive report will describe in detail the methodology and process that led to the choice of preferred layout and placement scenario. The...
Abstract (D2.S3) Identification of the high risk areas in preparation for the related investigations. Once the size and the placement of the ring have been defined...
Abstract (D1.S2) The report will: #x25AA; describe the overall concept for the surface sites for the four experiments and for the four (smaller) technical areas;...
Abstract (D2.S1) The layout and design of the underground structures will be summarised and a high level explanation of the geological environment provided. An assessment...
Abstract (D1.S2) The baseline scenario for the Feasibility Study and the main parameters of the FCC colliders will be described. The technical infrastructure system...