Heat run in UJ33
The 24hr heat run has been successfully performed. The re-routing of the cables was successful. The temperatures measured in the UJ33 are now in line with the ones recorded in the other LHC short circuit test zones and the so the temperature inside the FGC and 600A EE racks.
The detailed summary of the heat run will be presented at the HCC meeting on the 2nd of August.