TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Back to overview

YOU ARE VIEWING BlogEntryPoint3x2007x04x13x15x22

SCT in UJ33 - 12th April

PDF RAT_20071204.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x13x15x22/RAT_20071204.pdf

PDF SOC_settings_8hrun_UJ33.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x13x15x22/SOC_settings_8hrun_UJ33.pdf

********************************** **********************************

1 - TS-CV confirmed that the ED circuit of the sector 2-3 will be normally operated the 16th-17th and the 19th.

********************************** **********************************

2 - In attachment: the current of each PC in UJ33 in the 4 steps of the 8hr run.

* HEAT RUNS Schedule:

22.03 DONE Polarity Check
30.03 DONE CCC tests: preparation for the 8hr run
16.04 - First 8hr HEAT RUN ; re-scheduled
17.04 - Second 8hr HEAT RUN
18.04 - CCC tests: preparation for the 24hr run
19.04 - 24hr HEAT RUN
20.04 - AUG - UPS test
21.05 - EE 4hr run

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf RAT_20071204.pdf r1 manage 44.9 K 2007-04-13 - 15:23 BorisBellesia  
PDFpdf SOC_settings_8hrun_UJ33.pdf r1 manage 28.3 K 2007-04-13 - 15:23 BorisBellesia  

This topic: HCC > WebHome > BlogEntryPoint3x2007x04x13x15x22
Topic revision: r2 - 2007-04-16 - BorisBellesia