TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Back to overview

YOU ARE VIEWING BlogEntryPoint5x2006x12x18x14x23

RAT for Point 5, Dec 18

PDF RAT_20061218.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x18x14x23/RAT_20061218.pdf

Comments: NEXT MEETING WILL BE HELD AT POINT 6 ON THURSDAY, 21

Open Issues for RR57/UJ56

  • 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
  • 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
  • 07.12 Access key to electrical distribution room in UJ56

Open Issues for UA67/UJ67

  • 18.12 ERD rack powering
  • 18.12 EOD rack powering
  • 18.12 Connection of cable extremities on DQS
  • 18.12 HV test with circulating water
  • 18.12 Water-cooled cables supports
  • 18.12 PC powering
  • 18.12 Water circulation
  • 18.12 Elettas calibration
  • 18.12 Ventilation station
  • 18.12 CYNET01 and CYNET02 powering
  • 18.12 WorldFip cabling for PO
  • 18.12 Cooling station test by Roese
  • 18.12 Electrical protection IP2 on LEMs
  • 18.12 Cleaning of the areas

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf RAT_20061218.pdf r1 manage 46.9 K 2006-12-18 - 14:24 MirkoPojer  
Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2006-12-18 - MirkoPojer
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login