RAT_20070212.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x12x17x28/RAT_20070212.pdf
Comments:
Open Issues - UA67/UJ67
- 12.02 PM generated but stacked in local
- 12.02 Few labels missing for cables identification
- 05.02 Little ducts between UA and RA not closed during the 24hr
- 02.02 RSF2.A67B1 and RSF2.A67B2 PIC cables to extend
- 02.02 NC opening on the bad connection on the 6kA racks
- 08.01 EE fan rotation problem – all ring
Open Issues - RR73/UJ76
- 12.02 LEM reversed: cables to be tightened
- 08.02 Fire detection system completed. Reception to be done
- 08.02 Temporary WIFI cable to be replaced by TS/EL
- 08.02 13kA-2000 mm2-water cooled cables reversed in the tunnel