TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Back to overview

YOU ARE VIEWING BlogEntryPoint8x2006x10x23x18x31

Status of LSS8

The final Access system is being installed in P8. We could see the personnel and material SAS in the UA (Angels and Demons' eye recognition !!). The bake-out of the kickers in LSS8R is taking place, and should be at nominal temperature by wednesday ! The TDI is still not in place, though. We show here also the new vacuum valves.

JPEG Kickers-Bake-Out2-P8.JPG:
Kickers-Bake-Out2-P8.JPG
Kickers being baked-out
JPEG SAS-Eye.JPG:
SAS-Eye.JPG
SAS in UA87
JPEG VacuumValves-P8.JPG:
VacuumValves-P8.JPG
Vacuum Valve

Comments:

Topic attachments
I Attachment History Action Size Date Who Comment
JPEGjpg Kickers-Bake-Out2-P8.JPG r1 manage 3138.8 K 2006-10-23 - 18:44 BlancaPereaSolano Kickers being baked-out
JPEGjpg SAS-Eye.JPG r1 manage 2383.1 K 2006-10-23 - 18:43 BlancaPereaSolano SAS in UA87
JPEGjpg VacuumValves-P8.JPG r1 manage 3363.9 K 2006-10-23 - 18:45 BlancaPereaSolano Vacuum Valve
Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2006-10-23 - BlancaPereaSolano
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login