TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Back to overview

YOU ARE VIEWING BlogEntryPoint8x2007x05x04x17x42

Programme for Monday 07.05.2007

Programme for Monday 07.05.2007

DFBAO RQ6.L8B1
RQ6.L8B2
Switch on the flashing lights around the chimneys of RQ6.L8 circuit in the DFBAO HCC
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. AB/PO
Sequencer tests on powering procedures for 6kA magnets with 2 PCs ("Q4Q5" procedure) AB/CO

WHEN CONDITIONS FOR POWERING ARE MET (CRYO, MPP, MEL)

DFBMC RCBCH5.L8B1
RCBCV5.L8B2
Balisage with flashing lights HCC
PC Configuration (test of PC and magnet at minimum current) AB/PO
RQ5.L8 Unlock of the quench heater power supplies (DQHDS) of Q5 and charge. AT/MEL
PC Configuration AB/PO
RCBCH5.L8B1
RCBCV5.L8B2
RQ5.L8
PIC2 HCC
AB/CO
AB/PO
AT/MEL
AT/ACR
P2N HCC
AB/CO
AB/PO
AT/MEL
AT/ACR

WHEN CONDITIONS IN ARC ARE MET
go on with the programme for the 60A converters (orbit correctors) and 120A (Q7 to Q10 correctors) as well as ElQAs in DFBAs

X: previous day - X : last day - O : Proposal

  PC_Config PNO.1 PNO.2 PNO.3  
RCBH11_L8B1 X X X X  
RCBV11_L8B2 X X X X  
RCBH12_L8B2 X X X O  
RCBV12_L8B1 X X X O  
RCBH13_L8B1 X X X O  
RCBV13_L8B2 X X X O  
RCBH14_L8B2 X X X O  
RCBV14_L8B1 X X X O  
RCBH15_L8B1 X X O O  
RCBV15_L8B2 X X O O  
RCBH16_L8B2 X X O O  
RCBV16_L8B1 X X O O  
RCBH17_L8B1 -       PC_Config/crowbar tests to be repeated
RCBV17_L8B2 -       PC_Config/crowbar tests to be repeated
RCBH18_L8B2 -       PC_Config/crowbar tests to be repeated
RCBV18_L8B1 -       PC_Config/crowbar tests to be repeated
RCBH23_L8B1 O        
RCBV23_L8B2 O        
RCBH24_L8B2 O        
RCBV24_L8B1 O        
RCBH25_L8B1          
RCBV25_L8B2          
RCBH27_L8B1          
RCBV27_L8B2          
RCBH28_L8B2          
RCBV28_L8B1          
RCBH29_L8B1          
RCBV29_L8B2          
RCBH31_L8B1          
RCBV31_L8B2          
RCBH32_L8B2          
RCBV32_L8B1          

  PC_Config PIC2 PNO.1 PNO.2 PNO.3 PNO.4  
RCBCH9_L8B1 -           PC_Config/crowbar tests and TFA missing
RCBCV9_L8B2 -           PC_Config/crowbar tests and TFA missing
RCBCH10_L8B2 -           PC_Config/crowbar tests and TFA missing
RCBCV10_L8B1 -           PC_Config/crowbar tests and TFA missing

Done on Friday 04.05.2007

DFBMC RCBCH5.L8B1
RCBCV5.L8B2
Connection of the DC cables to the power converters for these circuits (before 9:00) AB/PO
Verification of the connections at the DFBMC side AT/MEL
DFBAO RQ6.L8B1
RQ6.L8B2
Switch on the flashing lights around the chimneys of RQ6.L8 circuit in the DFBAO HCC
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. AB/PO
Sequencer tests on powering procedures for 6kA magnets with 2 PCs ("Q4Q5" procedure) AB/CO

Comments:

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2007-05-04 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login