TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Back to overview

YOU ARE VIEWING BlogEntryPoint8x2007x05x07x22x46

Anti-condensation systems tested on DFBMA and DFBMC.

JPEG DSC03896b.jpg:
DSC03896b.jpg
Status of the DFBMA _ Plastic envelopes on all chimneys plus additional heater on top of the 120A-8leads-assembly and air blower in front of it (maximum power).
JPEG DSC03893b.jpg:
DSC03893b.jpg
Status of the DFBMC _ Plastic envelopes on all chimneys plus additional heater on top of both 120A-assemblies and air blower in front of them (minimum power).

Comments:

Topic attachments
I Attachment History Action Size Date Who Comment
JPEGjpg DSC03893b.jpg r1 manage 226.1 K 2007-05-07 - 22:53 MirkoPojer Status of the DFBMC _ Plastic envelopes on all chimneys plus additional heater on top of both 120A-assemblies and air blower in front of them (minimum power).
JPEGjpg DSC03896b.jpg r1 manage 255.7 K 2007-05-07 - 22:51 MirkoPojer Status of the DFBMA _ Plastic envelopes on all chimneys plus additional heater on top of the 120A-8leads-assembly and air blower in front of it (maximum power).
Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2007-05-07 - MirkoPojer
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login