TWiki home | Point 1 | Point 2 | Point 3 | Point 4 | Point 5 | Point 6 | Point 7 | Point 8 | Minutes |
DFBMA | RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Balisage with flashing lights | HCC |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
PC Configuration (test of PC and magnet at minimum current) UP TO 10 A |
AB/PO |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Balisage with flashing lights | HCC |
RCBCH5.L8B1 RCBCV5.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBCH5.L8B1 RCBCV5.L8B2 |
PC Configuration (test of PC and magnet at minimum current) UP TO 10 A |
AB/PO |
DFBMA | RQ4.L8 RD2.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 RD2.L8 |
Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 RD2.L8 |
Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 RD2.L8 |
Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 RD2.L8 |
PC configuration UP TO 100 A |
AB/PO |
DFBMC | RQ4.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 | Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 | Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 | PC configuration UP TO 100 A |
AB/PO |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | |
|
|
|
|
||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
09:30 | Swith on of the Power Converters: RPMBA.UA83.RQT12.L8B1 and RPMBA.UA83.RQT12.L8B2 Beginning of the validation of the sequencer for the procedure of D2. Test on the communication between the PIC and the CRYO signals (CRYO start and CRYO maintain). |
10:00 | Deconsignation of the PCs of the corrector circuits of Q4 and Q5. CRYO control in the FCR is not available, except a viewer. A voltage tap problem in the circuit RCBYHS4.L8B2 has been detected, the problem will be investigated. |
11:30 | Waiting for solving the voltage problem. Consignation of the PCs of the circuits: RPHGA.UA83.RQ9.L8B2 RPHGA.UA83.RQ9.L8B1 RPHGA.UA83.RQ10.L8B2 RPHGA.UA83.RQ10.L8B1 in order to allow AT/MEL to install new heaters. |
14:00 | Consignation of all the circuits of the converters of the Q4 in order to allow Vincent Chareyre to check the problem of the voltage drop in the circuit RCBYHS4.L8B2. |
15:00 | Vincent Chareyre has fixed the problem. 15:20 start with the PC configuration of the circuit RCBCH5.L8B1. |
16:00 | 16:10 CRYO-OK operation lost. 16:20 CRYO-OK operation found again. PC configuration of the circuit RCBCH5.L8B1 is ongoing. |
17:00 | Start with the PC configuration of the RCBCV5.L8B2. 17:10 CRYO-maintain forced LOST and PIC removed all the Power permits. Consequently all the PCs tripped off. 17:30 Cryo Operator reported on the situation: the CRYO OK was lost and the CRYO maintain was going to be lost, consequently they forced the CRYO-MAINTAIN as lost. |
18 :00 | Switch off of the Power Converters: RPMBA.UA83.RQT12.L8B1 and RPMBA.UA83.RQT12.L8B2. |