The Powering to Nominal procedure was started fro the following circuits:
|
PNO.1 |
PNO.2 |
RCBCH5.L8B1 |
O |
O |
RCBCv5.L8B1 |
O |
O |
RCBYH4.L8B2 |
O |
O |
RCBYHS4.L8B1 |
O |
O |
Several problems were faced:
- cryogenics instabilities which delayed the CRYO START signal:
- oscillating level on DFBMC
- high temperature on the first 6 kA in DFBMA (54 K)
- delay for PNO.2 step for RCBYH4.L8B2, whose origin was:
- hardware limitation of the PC, which blocked the cycle to 52 A; the PC went on fault and the current drop to zero (intervention of PO to remove the limitation)
- probably due to the problem just mentioned, a very long PM file was produced which was preventing the cycle from being restarted (manual reset of the PC was needed)
- RCBYHS4.L8B2 showed a possible NON-CONFORMITY: while preparing this circuit for PNO.1, a high voltage value was detected on a lead (250 mV); a verification of PO showed that this is probably due to an open voltage tap. The circuit has been removed from the SOC.
PROPOSAL FOR WEDNESDAY 23/05:
- continuation of tests on RCBCH5.L8B1, RCBCv5.L8B1, RCBYH4.L8B2 and RCBYHS4.L8B1;
- Powering to Nominal procedure for circuits RCBYV4.L8B1, RCBYVS4.L8B1 and RCBYVS4.L8B2;
- continuation of tests on Q4 and Q5 if released by MPP;
- continuation of tests on D2.
POSSIBLE SCENARIOS FOR NEXT WEEK
(N.B.: PC, PIC, QPS, EE systems and experts have to be ready for next Tuesday!!!)
RB.A78, RQF.A78 (?), RQD.A78 (?) |
Powered by their own converter |
DFBA, QPS, EE, PC, PIC Preparation (this week) |
ARC @ 1.9K |
ElQA @ 1.9K RB & RQD |
QPS Heater Discharge |
PIC1 RB & RQF |
Connection DC cable - lead |
PC_CONFIG RQ - 350A |
PIC 2 RQ - 350A |
PC_CONFIG RB - 350A |
PIC 2 RB - 350A |
P2N RQ - Max 760A |
P2N RB - Max 760A |
|
Powered by a 120A converter |
DFBA, QPS, EE, PC, PIC Preparation (this week) |
ARC @ 4.5K |
PIC1 RB & RQD - Without Quench Heaters |
Connection DC cable - lead |
PC_CONFIG RQ - 100A |
PC_CONFIG RB - 100A |
|
600A Circuits - Priority 1, 25 Circuits |
ARC @ 4.5K or 1.9K |
DFBA, QPS, EE, PC, PIC Preparation (this week) |
ElQA @ 4.5K-1.9K first Circuits |
QPS Last Conditioning |
PC_CONFIG first circuits |
ARC @ Superfluid Helium |
DFBA, QPS, EE, PC, PIC Preparation (this week) |
ElQA @ 4.5K-1.9K All Circuits |
QPS Last Conditioning |
PIC2 First Circuits |
PCS First Circuits |
PC_Config, PIC2, PCS rest of circuits - Parallel |
Comments: