Created by Main.MariaPazCasasLino on 2007-09-28 - 18:29
To be found together with the Minutes 28.09.2007 in point 2
Comments:
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-16 - 17:02

Planning.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2007x05x16x16x40/Planning.pdf

RAT_planning_20070511_WM5.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2007x05x16x16x40/RAT_planning_20070511_WM5.pdf
Comments:
-- Main.MariaPazCasasLino - 16 May 2007
Edit, attach file or add comment
Created by Main.IvanMoyaMartinez on 2006-12-20 - 10:57
Polarity Check done in RR57-UA56

P1000172.JPG:

P1000173.JPG:

P1000174.JPG:

P1000157.JPG:

P1000154.JPG:

P1000155.JPG:
Comments:
- Updated. Cables labeled following the ECR(EDMS 804188) -- Main.IvanMoyaMartinez - 09 Jan 2007 - 11:00
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-18 - 14:27

RAT_20061218.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x18x14x23/RAT_20061218.pdf
Comments: NEXT MEETING WILL BE HELD AT POINT 6 ON THURSDAY, 21
Open Issues for RR57/UJ56
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
- 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
- 07.12 Access key to electrical distribution room in UJ56
Open Issues for UA67/UJ67
- 18.12 ERD rack powering
- 18.12 EOD rack powering
- 18.12 Connection of cable extremities on DQS
- 18.12 HV test with circulating water
- 18.12 Water-cooled cables supports
- 18.12 PC powering
- 18.12 Water circulation
- 18.12 Elettas calibration
- 18.12 Ventilation station
- 18.12 CYNET01 and CYNET02 powering
- 18.12 WorldFip cabling for PO
- 18.12 Cooling station test by Roese
- 18.12 Electrical protection IP2 on LEMs
- 18.12 Cleaning of the areas
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-12 - 15:21

RAT_20061212.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x12x15x08/RAT_20061212.pdf

UJ56-RR57_IR-Report_2006-12-12_24H-Burnin.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x12x15x08/UJ56-RR57_IR-Report_2006-12-12_24H-Burnin.pdf
Comments: NEXT MEETING WILL BE HELD ON DEC,18 AT POINT 5
Please, find also included the IR analysis rapport, kindly provided by Jeff Thomsen.
Open Issues
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
- 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
- 07.12 Access key to electrical distribution room in UJ56
Heat Runs and Test Schedule
- 01.12 Squeeze test DONE (all the power converters involved have been tested)
- 06.12 8-h heat run DONE
- 07.12 Fire detection test DONE
- 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00 DONE
- 08.12 Afternoon: Polarity Test_1st part TO BE RE-SCHEDULED
- 11.12 10am: 24-h heat run DONE
- 13.12 9.00: UPS test and Electric cut (AUG simulation).
- 13.12 Polarity Test_2nd part TO BE RE-SCHEDULED
- 14.12 13kA energy extraction test
- 15.12 14.00: New sequencer test
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-11 - 13:18

RAT_20061211.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x11x13x11/RAT_20061211.pdf
Comments: Persons on call for assistance during the 24h heat run:
- Hardware commissioning coordination: Mirko Pojer 162482
- Power converters :
- Responsable ABPO: David Nisbet 164223
- (en cas de absence) Hugues Thiesen 164205
- Numéro général ABPO-LHC-SCT-24H: 162333
- Permanences ABPO: Journée 8h a 18 heures 11-12-2006 : Emmanuel Garde (16 4035) / Philippe Marchon Journée 18h a 20 heures 11-12-2006 : David Nisbet (164223) / Jeff Thomsen (165008) Nuit 20h 11-12-2006 a 2h00 12-12-2006 : Okbi Zenasni tel (16 3678) Nuit 2h a 8h 12-12-2006 : Cédric Caffier tel (16 4133) Journée 8h a 17 h 12-12-2006 : Emmanuel Garde (16 4035) / Philippe Marchon
- Energy extraction system: Knud Dahlerup-Petersen 163279
- DC cables: J. Kis (10h-18h), B. Lebeau (18h-00h), S. Cotte (00h-7h), J. Kis (7h-end of test) 164879
Open Issues
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
- 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
- 07.12 Access key to electrical distribution room in UJ56
Heat Runs and Test Schedule
- 01.12 Squeeze test DONE (all the power converters involved have been tested)
- 06.12 8-h heat run DONE
- 07.12 Fire detection test DONE
- 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00 DONE
- 08.12 Afternoon: Polarity Test_1st part TO BE RE-SCHEDULED
- 11.12 10am: 24-h heat run
- 13.12 UPS test and Electric cut (AUG simulation).
- 13.12 Polarity Test_2nd part TO BE RE-SCHEDULED
- 14.12 13kA energy extraction test.
- 15.12 New sequencer test
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-07 - 12:36

RAT_20061207.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x07x12x32/RAT_20061207.pdf
Comments: Next meeting in CCC on Monday Dec,11.
Open Issues
- 22.11 Fire detection – awaiting certification
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
- 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
- 07.12 Cables re-distribution for 600 A
- 07.12 Access key to electrical distribution room in UJ56
Heat Runs and Test Schedule
- 07.12 Fire detection test
- 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00
- 08.12 Afternoon: Polarity Test_1st part
- 11.12 10am: 24-h heat run
- 12.12 UPS test.
- 13.12 Electric cut (AUG simulation).
- 13.12 Polarity Test_2nd part
- 14.12 13kA energy extraction test.
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-06 - 12:47

RAT_20061206.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x06x12x42/RAT_20061206.pdf
Comments: 8-H HEAT RUN ON GOING
Next meeting: Thursday, 7 at 8.30 in CCC.
Open Issues
- 22.11 Fire detection – awaiting certification
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
Heat Runs and Test Schedule
- 07.12 Fire detection test
- 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00
- 11.12 10am: 24-h heat run
- 12.12 UPS test.
- 13.12 Electric cut (AUG simulation).
- 13.12 Polarity Test
- 14.12 13kA energy extraction test.
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-05 - 12:58

RAT_20061205.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x05x12x51/RAT_20061205.pdf

RQ4-RQ10-ECR.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x05x12x51/RQ4-RQ10-ECR.ppt

RR57-UJ56-8H-24H-PC_LIST.xls:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x05x12x51/RR57-UJ56-8H-24H-PC_LIST.xls
Comments:
Please find enclosed the list of PC which will be powered during the 8h heat run and the 24h heat run. The list of steps to be implemented following the ERC (EDMS No.804188) is also included
Open Issues
- 22.11 Fire detection – awaiting certification
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-01 - 11:49

RAT_20061201.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x01x11x42/RAT_20061201.pdf
Comments:
Next meeting oin Wednesday, Dec 6, at 8.30 in CCC
Open Issues
- 23.11 Ripples in RQT12R5B1 power converter.
- 22.11 Full power ventilation test in RR57 – Friday 8th Dec. 8:30-12:00
- 22.11 Fire detection – awaiting certification
Heat Runs and Test Schedule
- 01.12 Squeeze test
- 06.12 8-h heat run
- 07.12 Polarity Test
- 08.12 Full power ventilation tests
- 11.12 10am: 24-h heat run
- 12.12 UPS test.
- 13.12 Electric cut (AUG simulation).
- 14.12 13kA energy extraction test.
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-11-29 - 12:57

RAT_20061129.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x29x12x54/RAT_20061129.pdf
Comments:
Open Issues
- 29.11 WIFI problems
- 29.11 ELETTAS threshold setup
- 23.11 Ripples in RQT12R5B1 power converter.
- 22.11 Full power ventilation test in RR57 – Friday 8th Dec. 8:30-12:00
- 22.11 Fire detection – awaiting certification
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-11-27 - 11:34

RAT_20061127.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x27x11x29/RAT_20061127.pdf
Comments:
Open issues
- 23.11 Ripples in RQT12R5B1 power converter.
- 23.11 Cables inversion on rack RYMCA04.
- 20.11 Problem with water conductivity in DQS: reason known, insulation test still to be performed.
- 13.11 DC cables high voltage test (RR57 done. Waiting UJ56)
- 13.11 Test de circulation ED (waiting UJ56)
- 22.11 Full power ventilation test in RR57 – Friday 8th Dec. 8:30-12:00
- 22.11 Fire detection – awaiting certification
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-11-23 - 11:53

RAT_20061123.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x23x11x08/RAT_20061123.pdf
Comments:
Next RAT on Monday 27
Open Issues
- 20.11 Problem with water conductivity in DQS
- 13.11 DC cables high voltage test (RR57 done. Waiting UJ56)
- 13.11 Ventilation in UJ56.
- 13.11 Test de circulation ED (waiting UJ56)
- 20.11 Water conductivity in DQS – checked tomorrow (23.11)
- 22.11 DQS acousting shielding and cabling – No news
- 22.11 Full power ventilation test in RR57 – Friday 8th Dec. 8:30-12:00
- 22.11 Fire detection – awaiting certification
- 22.11 Wi-Fi damaged cable has to be repaired – no news
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-11-22 - 15:45

RAT_20061122.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x22x15x44/RAT_20061122.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-11-20 - 16:21
Please find enclose the minutes of our last RAT meeting in point 5.
Regards

RAT_20061120.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x20x16x18/RAT_20061120.pdf

Comments:
Edit, attach file or add comment
Created by Main.JeanPierreMalodDognin on 2006-11-20 - 10:33

tests_en_eau_cables_refoid_RR57_.jpg:
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-11-17 - 14:41
Bonjour,
Les visites des installations électriques des ouvrages cités en objet ont été réalisées à ce jour. Aucune non conformité ne s'oppose à ce que les essais en court-circuit soient effectués à partir du 20 novembre 2006. Les rapports de visite parviendront ultérieurement aux responsables de chaque installation.
Cordialement,
Caroline BENOIT-GONIN
Norisko Equipements pour SC/GS Office 57-2-024
caroline.benoit-gonin@cernNOSPAMPLEASE.ch
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-11-15 - 12:00
Please find enclose the last RAT minutes. Meeting held today, Wed Nov 15, in point 5.
Main issue: schedule in UJ56 and RR57.
Regards

RAT_20061115.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x15x11x52/RAT_20061115.pdf
Comments:
Edit, attach file or add comment
Created by Main.JeanPierreMalodDognin on 2006-11-14 - 16:37
lundi 13 , tests des cables refroidis sans eau?...tout est OK....

cable_refroidi_RR57JPG.JPG:
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-11-13 - 16:35
Please find enclose the minutes of the last RAT meeeting held this morning, Nov 13, in point 5.
Main issue: the readiness of the RR57 and UJ56, DC cables, elettas, etc..
Regards

RAT_20061113.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x13x16x33/RAT_20061113.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-11-08 - 16:10
Please find enclose the minutes of the last RAT meeting, held this morning in point 5.
Main issues:
- Preparation of the SCT in RR57 and UJ56
- Last tests in UA63
Reg

RAT_20061108.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x08x16x08/RAT_20061108.pdf
Comments:
Edit, attach file or add comment
Created by Main.JeanPierreMalodDognin on 2006-11-03 - 15:39

Tests_cables_refroidis_RR57.jpg:

IMGP8910.JPG:

Redimensionnement_de_IMGP8903.JPG:

IMGP8938.JPG:

IMGP8950.JPG:

IMGP8944.JPG:
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-06 - 11:48
Enclose the minutes of our last RAT meeting in point 5.
Main subject: 13kA EE switch test.
Also includea a small status of the works in UA63.
Regards

RAT_20061006.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x06x11x46/RAT_20061006.pdf
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-06 - 10:12
Please find Infra Red Analysis of RR53 & USC55 during 24H burnin tests at ultimate current of 2006-10-04.
https://edms.cern.ch/file/781901/1/RR53-USC55_IR-Report_2006-10-04_24H-Burnin.pdf
All raw pictures (IR or not) are located in EDMS doc:
https://edms.cern.ch/document/781901/1
IR Tunnel Tests EDMS doc should be located in a dedicated place under EDMS Tunnel installation structure to compare results if needed between locations measured. Note that UA83 is at following address:
https://edms.cern.ch/document/672600/1
.
Jeff Thomsen & Yves Thurel
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-05 - 10:11
Please find enclose the minutes of the last RAT meeting in point 5.
Main subject: first results of the 24-h heat run oin RR53 and USC55.
Regards

RAT_20061004.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x05x10x09/RAT_20061004.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-03 - 17:48
Please find enclose the last minutes of the RAT meeting concerning the 24-h heat run in RR53 and USC55.

RAT_20061003.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x03x17x46/RAT_20061003.pdf
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-02 - 11:23
Allo Roberto!
Le systeme de detection de defaut de terre interne au convertisseur a encore passe avec succes le TEST DE CONTROLE...
Bonne soiree
Hugues
PS: JC Guillaume est en train de traiter le pb.
Bonjour,
Suite à un défaut "Earth Fault" affiché sur le convertisseur 5kA Inner Triplet HCRPHGC__-KP000003, nous avons investigué le problème.
Il s'est avéré être un court-circuit franc entre le DC Output du convertisseur et le GND (Il n'y avait pas la tension Vearth en mode actif et un test à l'ohmmètre a indiqué 0ohm entre le DC- et le GND).
Après un rapide coup d'oeil, nous nous sommes aperçu que les vis permettant de raccorder le câble à eau sur DC-, touchaient le capot de protection des diodes de roue-libre (voir photos jointes).
Le nécessaire a été fait pour contacter les personnes responsables de ces connections et les modifications seront faites dès demain.
Bonne soirée
Amitiés
Vincent

IMGP2675.JPG:

IMGP2673.JPG:
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-02 - 11:20
And here it is the demin. water plot.
The power is very low (mean power around 200 kW), which is creating some pumping of the regulation (the reg. valve is opening and closing) as the nominal power of the circuit is 1400 kW. We are going to slow the PI to see if we get a smoother plot.

glacee_sect45_29_09_2006.jpg:
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-02 - 11:19
Please find below the plot for RR53, today at 13:21 hours. The system is working according to spec. (high speed since about 10:00 h).
Keep in mind that the nominal values requested by specification are:
Temp (mean) ground floor: 28 (+- 5) C
Temp. (mean) top floor: 30 (+- 5) C
The measured values are (at 14:04 h)
Temp. (mean) GF: 24.2 C
Temp (mean) top : 30 C (vault)
Temp mean regulation: 27.1 C
Water monitoring in UW45 is also underway and according to spec. Plot in the coming minutes.
We are at this moment discussing with J.C. Guillaume (on site) some adjustmemts to try and improve the temperature of his cables.

Outlook.jpg:
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-02 - 10:38
Please find enclose the minutes of the last RAT meeting, held in CCC this morning.
Main subject: last 8-h heat run and cables DC overheating.
Regards

RAT_20061002.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x02x10x37/RAT_20061002.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-09-29 - 11:03
Please find enclose the minutes of the last RAT meeting held this morning in CCC.
Main subject: 8-h heat run launched this morning 8h30. It concerns 120, 600A and ineer triplets.
Regards

RAT_20060929.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x09x29x11x01/RAT_20060929.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-09-26 - 17:10
Minutes from the last RAT meeting in point 5.
Regards

RAT_20060926.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x09x26x17x09/RAT_20060926.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-09-21 - 12:22
Please find enclose the minutes of the last RAT meeting held uin point 5 this morning 8h30.
NB: new schedule for the tests. 8h heat run moved to Friday sept 29.
Regards

RAT_20060921.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x09x21x12x18/RAT_20060921.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-09-19 - 10:57
Last minutes of the RAT meeting held today in point 5.
Main subjects: AC cabling, cooling and preparation of the next 8h run.
Regards

RAT_20060919.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x09x19x10x55/RAT_20060919.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-09-18 - 14:26
Last news from the field.
Minutes of the meeting held today in point 5.
Regards

RAT_20060918.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x09x18x14x24/RAT_20060918.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-09-14 - 18:17
Enclosed the last RAT minutes.

RAT_20060914.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x09x14x18x16/RAT_20060914.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-09-13 - 16:49
Please find enclose the minutes of the RAT meeting, hed today in point 5.
New version of the SCT schedule in this area also included .
Regards

RAT_20060913.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x09x13x16x47/RAT_20060913.pdf

SCT-planning-RR53-USC55_v20060913rp.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x09x13x16x47/SCT-planning-RR53-USC55_v20060913rp.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-09-11 - 15:12
Next RAT meeting will be held in point 5...
The first one in this area.
The SCT will concern RR53 and USC55.
8h30, bld. 3595/R-013.
Comments:
Edit, attach file or add comment