Created by Main.MirkoPojer on 2007-10-31 - 20:49

RAT__20071030.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x10x31x20x48/RAT__20071030.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-10-30 - 19:39

6-7_october30.jpg:
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-10-30 - 19:38

5-6_october30.jpg:
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-10-17 - 23:15

Sector_5-6_status_161007.jpg:
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-10-09 - 21:28

5-6.jpg:
Feedback of the meeting:
- Problems with the soldering of the flexible of DFBAJ - To be resolded (after meeting: soldered, waiting for radiography)
- ElQA on DFBXF.3R5 not yet done (after meeting: possibly done on Thursday)
- Cool-down could be delayed 1 week (start on w.46)
After meeting:
- Partial coherence test successfully performed
- Leak in 15L6 will be repaired on Wednesday; 3 bars will be put during night to check
- Rail for re-routing of 120 A cables on DFBLE.RR57 is in place; connection on Wednesday
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-10-03 - 15:32
-Thursday 4th morning: Setup ongoing (Bernard Dubois) and pre-test from the CCC before 10:30h
-Thursday 4th,10:30h: Consignation of the converters in order to remove the covers from the magnets (Jacky Mazet)
-Thursday 4th,≈14:00h: Once the covers are removed, the converters will be deconsignée (Jacky Mazet)
-Thursday 4th,after deconsignation of the converters: Start of the 24h heat run from the CCC
-Thursday 4th,≈ 17:00h: General verification on the cables (Baptiste Lebeau)
-Friday 5th, before finishing the 24h heat run: Polarity test (Jacky Mazet)
-Friday 5th, ≈ 13:30h: Magnets and cables temperatures measurements (Jacky Mazet, Baptiste Lebeau)
-Friday 5th, ≈ 14:00h: Stop of the heat run from the CCC
-Friday 5th, just after stopping the heat run, temperatures measurements on the converters (Bernard Dubois)
-Friday 5th , consignation of the converters (Jacky Mazet)
-Friday 5th, after consignations of the converters: the covers will be put in place (Jacky Mazet)
Comments:
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-10-03 - 15:15
Comments:
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-09-28 - 18:30
To be found together with the Minutes 28.09.2007 in point 2
Comments:
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-09-14 - 19:07

RAT__20070913.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x09x14x18x57/RAT__20070913.pdf
Comments:
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-09-07 - 16:26

RAT_20070903_WM6.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x09x07x15x38/RAT_20070903_WM6.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-08-28 - 19:03

RAT_20070828.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x08x28x19x02/RAT_20070828.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-08-06 - 01:03

RAT_20070731.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x08x06x00x59/RAT_20070731.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-06-26 - 19:00

RAT_20070619.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x06x26x18x59/RAT_20070619.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-06-18 - 16:24

RAT_20070605.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x06x18x16x21/RAT_20070605.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-31 - 17:54

RAT_20070522.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x05x31x17x53/RAT_20070522.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-15 - 09:54

RAT_20070508.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x05x15x09x53/RAT_20070508.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-04-19 - 19:12

LSS6_v2.mpp:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x19x18x50/LSS6_v2.mpp

RAT_20070417.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x19x18x50/RAT_20070417.pdf
PLANNED INTERVENTIONS IN THE AREA
- The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
- A cabling campaign (including fire detection system) is foreseen for w16 to w19. No interferences have been pointed out during the inspection visit of AB/BT, TS/EL and TS/HDO.
- A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
- Test of the MSD foreseen for w.29-30.
- Cool-down of sector 5-6 for mid August.
- Cool-down of sector 6-7 for mid October.
Open Issues
- 10.04 Installation of BPMSD AB/BI
- 10.04 Installation of BCTFD AB/BI
- 10.04 Modifications on PDC of MKB-67 requested by Norisko AB/BT
- 10.04 Mounting and alignment of beam dump line in RA63 AT/VAC
- 10.04 Installation of MKD magnets in RA63 AB/BT
- 10.04 Installation of junction modules between MKDs in RA67 AT/VAC
- 03.04 Inspection by Norisko on PDC of UA63
- 03.04 Assembly of PDC for MKDs in UA63 AB/BT
- 03.04 Assembly of PDC for MKDs in UA67 AB/BT
- 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
- 13.03 Grounding of instrumentation/after deconsignation AB/BT
- 27.02 TCS: installation on w.18
- 27.02 Vacuum tube between carbon window and TDE (fabrication on going-ready for the end of June) AB/ATB
- 27.02 VMTAB bellows are needed for w18 AB/BT
- 20.02 VAC: bake-out of MKD-6R AT/VAC
- 20.02 TDE in UD68 ready for end of June
- 20.02 BPM installation AB/BI
- 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
- 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
- 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
- 17.04 VAC: bake-out of MKD-6L 20.02
- 10.04 Beam dump line in TD62 10.04
- 10.04 BLMs integration 13.03
- 10.04 Smoothing of the MSD 10.04
- 03.04 Assembly of PDC for MKBs in UA63 03.04
- 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
- 27.03 Grounding of instrumentation/before deconsignation 13.03
- 10.04 Mounting supports for second beam (on drawings) (6L&R) 13.03
- 27.03 Place for storing MKDs in UX65 20.03
- 20.03 Grounding of magnets 13.03
- 13.03 Intermediate bellows availability 27.02
- 13.03 Interference between vacuum support and MKD 27.02
- 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) - late installation of that part of dump line 20.02
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-04-13 - 15:29
Comments:
PLANNED INTERVENTIONS IN THE AREA
- The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
- A cabling campaign (including fire detection system) is foreseen for w16 to w19.
- A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
- Test of the MSD foreseen for w.21-22.
- Cool-down of sector 5-6 for mid August.
- Cool-down of sector 6-7 for mid October.
Open Issues
- 10.04 Installation of BPMSD AB/BI
- 10.04 Installation of BCTFD AB/BI
- 10.04 Modifications on PDC of MKB-67 requested by Norisko AB/BT
- 10.04 Mounting and alignment of beam dump line in RA63 AT/VAC
- 10.04 Installation of MKD magnets in RA63 AB/BT
- 10.04 Installation of junction modules between MKDs in RA67 AT/VAC
- 03.04 Inspection by Norisko on PDC of UA63
- 03.04 Assembly of PDC for MKDs in UA63 AB/BT
- 03.04 Assembly of PDC for MKDs in UA67 AB/BT
- 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
- 13.03 Grounding of instrumentation/after deconsignation AB/BT
- 27.02 TCS: installation after dump line
- 27.02 Vacuum tube between carbon window and TDE AB/ATB
- 27.02 VMTAB bellows are needed for w18 AB/BT
- 20.02 VAC: bake-out of 6L AT/VAC
- 20.02 VAC: bake-out of 6R AT/VAC
- 20.02 TDE in UD68 ready for end of June
- 20.02 BPM installation AB/BI
- 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
- 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
- 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
- 10.04 Beam dump line in TD62 10.04
- 10.04 BLMs integration 13.03
- 10.04 Smoothing of the MSD 10.04
- 03.04 Assembly of PDC for MKBs in UA63 03.04
- 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
- 27.03 Grounding of instrumentation/before deconsignation 13.03
- 10.04 Mounting supports for second beam (on drawings) (6L&R) 13.03
- 27.03 Place for storing MKDs in UX65 20.03
- 20.03 Grounding of magnets 13.03
- 13.03 Intermediate bellows availability 27.02
- 13.03 Interference between vacuum support and MKD 27.02
- 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02
-- Main.MirkoPojer - 13 Apr 2007
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-04-04 - 14:44

RAT_20070403.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x04x14x34/RAT_20070403.pdf
PLANNED INTERVENTIONS IN THE AREA
- The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
- Smoothing of the MSD is foreseen for this week (w.12).
- A cabling campaign (including fire detection system) is foreseen for w16 to w19.
- A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
- Test of the MSD foreseen for w.21-22.
- Cool-down of sector 5-6 for mid August.
- Cool-down of sector 6-7 for mid October.
Open Issues
- 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
- 13.03 Mounting supports for second beam (on drawings) (6R) AB/BT
- 13.03 BLMs integration AB/BT&ICL
- 13.03 Grounding of instrumentation/after deconsignation AB/BT
- 27.02 TCS: installation after dump line
- 27.02 Vacuum tube between carbon window and TDE AB/ATB
- 27.02 VMTAB bellows are needed for w18 AB/BT
- 20.02 VAC: bake-out of 6L AT/VAC
- 20.02 VAC: bake-out of 6R AT/VAC
- 20.02 TDE in UD68 ready for end of June
- 20.02 BPM installation AB/BI
- 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
- 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
- 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
- 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
- 27.03 Grounding of instrumentation/before deconsignation 13.03
- 27.03 Mounting supports for second beam (on drawings) (6L) 13.03
- 27.03 Place for storing MKDs in UX65 20.03
- 20.03 Grounding of magnets 13.03
- 13.03 Intermediate bellows availability 27.02
- 13.03 Interference between vacuum support and MKD L. Ducimetiere 27.02
- 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-03-28 - 16:25

RAT_20070327.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x28x14x18/RAT_20070327.pdf
PLANNED INTERVENTIONS IN THE AREA
- The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
- Smoothing of the MSD is foreseen for this week (w.12).
- A cabling campaign (including fire detection system) is foreseen for w16 to w19.
- A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
- Test of the MSD foreseen for w.21-22.
- Cool-down of sector 5-6 for mid August.
- Cool-down of sector 6-7 for mid October.
Open Issues
- 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
- 13.03 Mounting supports for second beam (on drawings) (6R) AB/BT
- 13.03 BLMs integration AB/BT&ICL
- 13.03 Grounding of instrumentation/after deconsignation AB/BT
- 27.02 TCS: installation after dump line
- 27.02 Vacuum tube between carbon window and TDE AB/ATB
- 27.02 VMTAB bellows are needed for w18 AB/BT
- 20.02 VAC: bake-out of 6L by w-13 AT/VAC
- 20.02 VAC: bake-out of 6R by w-15 AT/VAC
- 20.02 TDE in UD68 ready for end of June
- 20.02 BPM installation AB/BI
- 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
- 20.02 Safety inspection by Norisko on power distr. Racks for MKDs
- 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
- 27.02 Safety inspection by Norisko on power distr.Racks (MKBs) 20.02
- 27.03 Grounding of instrumentation/before deconsignation 13.03
- 27.03 Mounting supports for second beam (on drawings) (6L) 13.03
- 27.03 Place for storing MKDs in UX65 20.03
- 20.03 Grounding of magnets 13.03
- 13.03 Intermediate bellows availability 27.02
- 13.03 Interference between vacuum support and MKD L. Ducimetiere 27.02
- 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-03-23 - 09:55

RAT_20070320.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x23x09x40/RAT_20070320.pdf
Planned interventions in the area
- Smoothing of the MSD is foreseen for this week (w.12).
- A campaign for fire detection system cabling is foreseen for w14 to w17.
- A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
- Test of the MSD foreseen for w.21-22.
- Cool-down of sector 5-6 for mid August.
- Cool-down of sector 6-7 for mid October.
Open Issues
- 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
- 20.03 Place for storing MKDs in UX65 AB/BT
- 13.03 Mounting supports for second beam (on drawings) AB/BT
- 13.03 BLMs integration AB/BT&ICL
- 13.03 Grounding of instrumentation AB/BT
- 27.02 TCS: installation after dump line
- 27.02 Vacuum tube between carbon window and TDE AB/ATB
- 27.02 VMTAB bellows are needed for w18 AB/BT
- 20.02 VAC: bake-out of 6L by w-13 AT/VAC
- 20.02 VAC: bake-out of 6R by w-15 AT/VAC
- 20.02 TDE in UD68 ready for end of June
- 20.02 BPM installation AB/BI
- 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
- 20.02 Safety inspection by Norisko on power distr. racks
- 20.02 Optical fibers for pulsing (compl. W11) K. Loukili-TS/EL
Closed Issues
- 20.03 Grounding of magnets 13.03
- 13.03 Intermediate bellows availability 27.02
- 13.03 Interference between vacuum support and MKD L. Ducimetiere 27.02
- 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-03-15 - 18:34

RAT_20070313.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x15x18x18/RAT_20070313.pdf

MTF_STEPS.txt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x15x18x18/MTF_STEPS.txt
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-03-08 - 18:07

RAT_20070306.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x08x18x06/RAT_20070306.pdf

LSS6_v2.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x08x18x06/LSS6_v2.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-02-21 - 18:18

RAT_20070220.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x21x18x16/RAT_20070220.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-02-14 - 18:23
Comments:
Open Issues SCT in UA67 and UJ67
- 13.02 Report on the AUG
- 12.02 PM generated but stacked in local
- 12.02 Few labels missing for cables identification
- 05.02 Little ducts between UA and RA not closed during the 24hr
- 02.02 RSF2.A67B1 and RSF2.A67B2 PIC cables to extend
- 02.02 NC opening on the bad connection on the 6kA racks
- 08.01 EE fan rotation problem – all ring
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-02-12 - 17:32

RAT_20070212.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x12x17x28/RAT_20070212.pdf
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-02-08 - 20:19

SCT-planning-RR73-UJ76_v02.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x08x20x17/SCT-planning-RR73-UJ76_v02.pdf

RAT_20070208.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x08x20x17/RAT_20070208.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-02-06 - 19:38

RAT_20070206.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x06x19x37/RAT_20070206.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-02-05 - 15:30

RAT_20070205.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x05x15x20/RAT_20070205.pdf
- 24h PC heat run ON GOING.
Phone numbers for operators:
Hardware commissioning coordination:
Power converters :
- Responsable AB/PO: David Nisbet 164223
- (en cas de absence) Hugues Thiesen 164205
- Numéro général AB/PO-LHC-SCT-24H: 162333
For AB/PO – in the tunnel:
- Journée 8:00-18:00 heures: Emmanuel Garde 164035
- Journée 17:00 -20:00 heures: Vincent Barbet 165148
- Nuit 20:00–02:00 heures: Halil Oruc 165193
- Nuit 02:00-8:00 heures: Okbi Zenasni 163678
Energy extraction system:
DC cables:
- Journée jusqu’a 12:00 heures: D.Camus 164903
- Journée 12:00-20:00 heures: B.Lebeau 160913
- Nuit 20:00-02:00 heures: S.Boutte 163390
- Nuit 02.00-08.00 heures: D.Camus 164903
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-02-02 - 21:01

RAT_20070202.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x02x20x50/RAT_20070202.pdf
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-31 - 20:38

RAT_20070131.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x31x20x37/RAT_20070131.pdf
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-30 - 12:35

RAT_20070130.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x30x12x14/RAT_20070130.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-29 - 12:45

RAT_20070129.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x29x12x44/RAT_20070129.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-26 - 18:03

RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x18x01/RAT_20070126.pdf

LSS6_v1.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x18x01/LSS6_v1.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-26 - 16:43

RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x16x41/RAT_20070126.pdf
Comments:
- At 15:00 8hr run of the 13 kA circuits have been STOPPED due to water cooling circuit.
- TS-CV intervention scheduled for Monday 29.01
- 8hr run for the 13 kA circuits foreseen for the next Tuesday (30.01) after TS-CV intervention.
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-25 - 17:05

Tests_annuels_des_AUG_LHC.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x25x16x36/Tests_annuels_des_AUG_LHC.ppt
Present :
P. Anderssen, B. Bellesia, C. Castillo Trello, G. Cumer, C. Dehavay, P. Fessia, J.P. Malod Dognin, M. Pojer, R. Saban, E. Barbero Soto, J.Toullieux, S. Weisz
* Presentation of G. Cumer (see attached file)
- The procedures adopted during an AUG have been mentioned.
- Resume of the affected Surface and Underground Areas during the AUG in Point 6.
* Friday 9 Feb. can be a possible date for a AUG in point 6:
Waiting for the “ok” of Installation (S. Weisz/ TS-IC) and Interconnections (P. Fessia/ AT-MCS)
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-25 - 16:31

RAT_20070125.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x25x16x30/RAT_20070125.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-24 - 19:21

RAT_20070124.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x24x19x21/RAT_20070124.pdf
Comments:
Edit, attach file or add comment
Created by Main.JeanPierreMalodDognin on 2007-01-19 - 16:45

IMGP9979.JPG:
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-19 - 12:24

RAT_20070119.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x19x11x25/RAT_20070119.pdf

SCT-Planning-UA67UJ67-v6.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x19x11x25/SCT-Planning-UA67UJ67-v6.pdf
Open Issues
- 17.01 Broken thermostat on 13 kA EE
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem – all ring
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
Heat Runs and Test Schedule
08.01 |
DONE |
600A and 13 kA EE system IST. |
08.01 |
DONE |
RB IST. ON GOING |
11.01 |
DONE |
120A powering tests. |
15.01 |
DONE |
2 kA powering tests. |
15.01 |
DONE |
600A powering tests. |
17.01 |
DONE |
600A-EE powering tests. |
22.01 |
- |
PIC-PC-QPS Interface tests. |
23.01 |
- |
RQD&F powering tests. |
24.01 |
- |
RB powering tests. |
26.01 |
- |
120A-600A-2kA-RQD/F-RB 8h heat run. |
05.02 |
- |
24h heat run test. |
07.02 |
- |
Polarity test. |
14.02 |
- |
AUG&UPS test. |
- Main.MirkoPojer - 19 Jan 2007 - 11:28
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-17 - 11:24

RAT_20070117.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x17x11x19/RAT_20070117.pdf
Open Issues
- 17.01 Broken thermostat on 13 kA EE
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem – all ring
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule
08.01 |
ON GOING |
600A and 13 kA EE system IST |
08.01 |
ON GOING |
RB IST |
11.01 |
DONE |
120A powering tests. |
15.01 |
DONE |
2 kA powering tests. |
17.01 |
ON GOING |
PIC-PC-QPS Interface tests. |
19.01 |
DONE |
600A powering tests. |
23.01 |
- |
600A-EE powering tests. |
26.01 |
- |
120A-600A-2kA 8h heat run. |
30.01 |
- |
RQD&F powering tests. |
02.02 |
- |
RB powering tests. |
07.02 |
- |
RQ&RB 8h heat run. |
12.02 |
- |
24h heat run test. |
14.02 |
- |
AUG&UPS test. |
14.02 |
- |
Polarity test. |
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-15 - 11:21

RAT_20070115.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x15x11x07/RAT_20070115.pdf
Open Issues:
- 15.01 Loosen bolts on RCBYH4.R6B1 and RCBYV4.R6B2 PCs.
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule:
- 08.01 600A and 13 kA EE system IST. ON GOING
- 08.01 RB IST. ON GOING
- 11.01 120A powering tests. COMPLETED
- 15.01 2 kA powering tests. ON GOING
- 17.01 PIC-PC-QPS Interface tests.
- 19.01 600A powering tests. COMPLETED
- 23.01 600A-EE powering tests.
- 26.01 120A-600A-2kA 8h heat run.
- 30.01 RQD&F powering tests.
- 02.02 RB powering tests.
- 07.02 RQ&RB 8h heat run.
- 12.02 24h heat run test.
- 14.02 AUG&UPS test.
- 14.02 Polarity test.
- Main.MirkoPojer - 15 Jan 2007 - 11:15
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-12 - 15:48

RAT_20070112.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x12x15x43/RAT_20070112.pdf
Open Issues:
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem to be fixed for the whole machine
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule:
- 08.01 600A and 13 kA EE system IST. ON GOING
- 08.01 RB IST.
- 11.01 120A powering tests.
- 15.01 2 kA powering tests.
- 17.01 PIC-PC-QPS Interface tests.
- 19.01 600A powering tests.
- 23.01 600A-EE powering tests.
- 26.01 120A-600A-2kA 8h heat run.
- 30.01 RQD&F powering tests.
- 02.02 RB powering tests.
- 07.02 RQ&RB 8h heat run.
- 12.02 24h heat run test.
- 14.02 AUG&UPS test.
- 14.02 Polarity test.
-- Main.MirkoPojer - 12 Jan 2007 - 15:46
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-10 - 17:47

RAT_20070110.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x10x17x43/RAT_20070110.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-08 - 18:46

RAT_20070108.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x08x18x45/RAT_20070108.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2006-12-21 - 19:11

RAT_20061221.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x12x21x19x03/RAT_20061221.pdf
Open Issues:
- 21.12 EE Fan rotation to be verified
- 21.12 Aluminum panel for the cables ducts
- 21.12 HV Insulation test of the DQS poles
- 18.12 ERD rack powering
- 18.12 EOD rack powering
- 18.12 PC powering
- 18.12 Elettas calibration
- 18.12 Ventilation station
- 18.12 Cooling station test by Roese
-- Main.BorisBellesia - 21 Dec 2006 - 19:10
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-11-01 - 09:22
Please find enclose the minutes of our last RAT meeting, held this morning in SX6.
Main issue: the 24-h heat run scheduled from Wed 01.11 to Thu 02.11.
Regards

RAT_20061031.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x11x1x09x21/RAT_20061031.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-11-17 - 12:09
Please find enclose a small report of the tests held in UA63 concerning the 13kA switch DQSQD.
Regards

RAT_20061117.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x11x17x12x07/RAT_20061117.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-11-16 - 14:27
Please find enclose a short description of the events related to the behavior of the DQSQD 13kA switch during the AUG simulation on Friday Nov 3.
Regards
Rosario

MinutesFailureEE_20061117.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x11x16x14x16/MinutesFailureEE_20061117.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-11-03 - 16:18
Please find enclose the RAT meeting minutes of our last meeting in point 6.
Main issues:
a) results of the 24-h heat run
b) UPS test
c) AUG simulation
Regards

RAT_20061103.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x11x03x16x16/RAT_20061103.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-11-02 - 18:02

RAT_061102.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x11x02x18x01/RAT_061102.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-11-01 - 10:11
Please find enclose the minutes of the last RAT meeting held today in the CCC.
Remember 24-h heat run today in UA6.
Regards.

RAT_20061101.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x11x01x10x09/RAT_20061101.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-31 - 16:58
Please find enclose the minutes of our last RAT meeting, held this morning in SX6.
Main issue: the 24-h heat run scheduled from Wed 01.11 to Thu 02.11.
Regards

RAT_20061031.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x31x16x55/RAT_20061031.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-25 - 18:35

RAT_061025.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x25x18x32/RAT_061025.pdf
Comments:
Edit, attach file or add comment
Created by Main.BlancaPereaSolano on 2006-10-23 - 18:18
During the visit today to P6, we took a look at the Beam Dumping System (some collimator, kickers and the TDE line and dump) and the situation in UA63, where we found Giges sorting out the problem with the filters and the Elettas !

TDE-DumpLine-P6.JPG:
TDE line tunnel

Collimators2-P6.JPG:
Beam Dumping System Collimators

TDE-P6.JPG:
TDE

Giges-ElettasRegulation-P6.JPG:
Giges fine-tuning of the Elettas in UA63

Kickers-P6.JPG:
Beam Dumping System Kickers
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-20 - 10:07
Enclose you can find the minutes of our last RAT meeting held in point 6 on Thursday OCt 19.
Main issue: new schedule for the 8-h and 24-h heat runs.
Regards

RAT_20061019.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x20x10x04/RAT_20061019.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-18 - 16:34
Please find enclose the minutes of the last RAT meeting held in point 6 on Tuesday Oct 17.

RAT_20061017.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x18x16x32/RAT_20061017.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-13 - 11:32
Please find enclose the minutes of the RAT meeting held today in point 6.
NB: TSIC proposes to start the next endurance test (RR53) on Dec 04. Please comment.

RAT_20061013.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x13x11x29/RAT_20061013.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-11 - 15:35
Please find enclose your RAT minutes of the day...
Main issue: mise en tension of the PCs in UA63.
Regards

RAT_20061011.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x11x15x34/RAT_20061011.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-09 - 10:52

SCT-planning-UA63-UJ63-v0.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x09x10x51/SCT-planning-UA63-UJ63-v0.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-09 - 10:51
First RAT meeting in Point 6 this morning for the preparation of the SCT in UA63.
Enclose the minutes.
Regards

RAT_20061009.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x09x10x49/RAT_20061009.pdf
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-06 - 09:32
First visit to point 6. The reason of the visit was to know the situation of the power converters, the cables in the tunnel side and in the power converter side. Also, the objetive was to make a first inspection of what we'll find in the short circuit test.

P1000018.JPG:
The air cooled cables was already prepared for the short circuit test

P1000003.JPG:
The water cooled cables still not conected to power converter

P1000004.JPG:
The water cooled cables still not conected to power converter

P1000012.JPG:
The labels of the connection between the power converter and the energy extraction system was made with one single label, the cablotheque id number

P1000020.JPG:
The air cooled cables was already prepared for the short circuit test

P1000016.JPG:
In the tunnel side, the blocks of the water cooled cables were put in all the cables, and placed in the DFB situation

P1000002.JPG:
The water cooled cables still not conected to power converter

P1000017.JPG:
Example of the identification of the water cooled cables.

P1000010.JPG:
The air cooled cables was already connected to the power converters

P1000021.JPG:
The water cooled cables of the DFBMM.4L6 was being hung up in the moment of the visit.
Comments:
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-06-06 - 16:40

espaceursdecablesDCfourreaux.JPG:

IMGP5835.JPG:

IMGP5830.JPG:

IMGP5821.JPG:

UA63060606.jpg:

IMGP5833.JPG:

IMGP5837.JPG:

UA67.jpg:

IMGP5827.JPG:
Comments:
instantanes ramenes des profondeurs.
-- Main.JeanPierreMalodDognin - 06 Jun 2006
les transfos de RB a decouvert...
-- Main.JeanPierreMalodDognin - 06 Jun 2006
-- Main.JeanPierreMalodDognin - 06 Jun 2006
la derniere photo est faite en UA43,ou on installe "l habillage" de RB...
-- Main.JeanPierreMalodDognin - 06 Jun 2006
les futures connection d eRQD RQF s' impatientent
-- Main.JeanPierreMalodDognin - 06 Jun 2006
espaceurs de cable en fourreaux recherchent travail a temps plein, faire offre sous chiffre UA67
-- Main.JeanPierreMalodDognin - 06 Jun 2006
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-04-03 - 17:12
Content d'etre le premier a fouler l'espace vierge de ce blog !
Monde non interdit des 2 UA du point 6... ces photos du 3 avril montrent l avancement (?) des travaux...en UA 63..UA67 et UJ63(noter la presence du bel escalier en colimacon en UA 63...)
- UJ63030406.JPG:
- RQDUA67.jpg:
- RQDavenirUA67.JPG:
- UA67.JPG:
- UA630304.JPG:
Comments:
Edit, attach file or add comment