RAT meeting 30/4/2007

PDF RAT_20070430.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x30x18x20/RAT_20070430.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-27 - 19:39

RAT meeting 27/4/2007

PDF RAT_20070427.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x27x19x39/RAT_20070427.pdf

Comments:

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-04-27 - 17:47

RAT in Point 4 - Minutes of 27th April 2007

PDF RAT_20070427.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x04x27x17x39/RAT_20070427.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-04-26 - 23:08

Powering Tests - Completed Activities on 26/04/07 and Circuits ready for next steps

X: previous day - X : last day - O : Proposal

  PC_Config PNO.1 PNO.2 PNO.3  
RCBH11_L8B1 X X X X  
RCBV11_L8B2 X X X X  
RCBH12_L8B2 X X X O  
RCBV12_L8B1 X X X O  
RCBH13_L8B1 X X X O  
RCBV13_L8B2 X X X O  
RCBH14_L8B2 X X X O  
RCBV14_L8B1 X X X O  
RCBH15_L8B1 X X O O  
RCBV15_L8B2 X X O O  
RCBH16_L8B2 X X O O  
RCBV16_L8B1 X X O O  
RCBH17_L8B1 -       PC_Config/crowbar tests to be repeated
RCBV17_L8B2 -       PC_Config/crowbar tests to be repeated
RCBH18_L8B2 -       PC_Config/crowbar tests to be repeated
RCBV18_L8B1 -       PC_Config/crowbar tests to be repeated
RCBH23_L8B1 O        
RCBV23_L8B2 O        
RCBH24_L8B2 O        
RCBV24_L8B1 O        
RCBH25_L8B1          
RCBV25_L8B2          
RCBH27_L8B1          
RCBV27_L8B2          
RCBH28_L8B2          
RCBV28_L8B1          
RCBH29_L8B1          
RCBV29_L8B2          
RCBH31_L8B1          
RCBV31_L8B2          
RCBH32_L8B2          
RCBV32_L8B1          

  PC_Config PIC2 PNO.1 PNO.2 PNO.3 PNO.4  
RCBCH9_L8B1 -           PC_Config/crowbar tests and TFA missing
RCBCV9_L8B2 -           PC_Config/crowbar tests and TFA missing
RCBCH10_L8B2 -           PC_Config/crowbar tests and TFA missing
RCBCV10_L8B1 -           PC_Config/crowbar tests and TFA missing

Other activities:

  • PNO3 60A on cells RCBH12_L8B2/RCBV12_L8B1 (manual) – executed by A.Cantone 12:15
  • ELQA 60 A cells 20 and 22 (10:00) & DFBAO
  • Transfer function Measurement at Nominal current on RCBH11_L8B1 (local test in the tunnel 10:00)
  • Calibration of the Cryo-valves (A.Bouillot)
  • Condensation appears on Q6/Q7/Q8 120 A Current leads
  • Connection of the 120 A PC cell 8. Tests not performed due to condensation.

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-26 - 12:27

RAT meeting 26/4/2007

PDF RAT_20070426.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x26x12x25/RAT_20070426.pdf

Comments:

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-04-25 - 19:00

Powering Tests-Completed Activities in 25/04/07 and Program for 26/04/07

PDF 25th-26th_April_2007.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x25x18x38/25th-26th_April_2007.pdf

Comments:

Attached file contains the tasks completed on 25th April 2007 and Proposed Programme for 26th April 2007

Mirko Pojer and Blanca Perea for the HCC- 25 Apr 2007

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-25 - 18:14

RAT meeting 25/4/2007

PDF RAT_20070425.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x25x18x13/RAT_20070425.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-04-25 - 15:43

Short Circuit Test in UA27 - 25th April

PDF sct_UA27_v001.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x04x25x15x42/sct_UA27_v001.pdf

PDF RAT_20070425.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x04x25x15x42/RAT_20070425.pdf

Comments:

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-04-25 - 10:11

Sets of Circuits for 25/04/07

Morning

PCC Tests (AB/PO) - 10A

  RCBH13.L8B1
  RCBV13.L8B2
  RCBV14.L8B1
  RCBH14.L8B2
  RCBH15.L8B1
  RCBH16.L8B2
  RCBV15.L8B2
  RCBV16.L8B1

PNO.1

  RCBH13.L8B1
  RCBV13.L8B2
  RCBV14.L8B1
  RCBH14.L8B2

Afternoon
PCC Tests (AB/PO) - 10A

  RCBCH9.L8B1
  RCBCV9.L8B2
  RCBCH10.L8B2
  RCBCV10.L8B1
  
PNO.2

  RCBH11.L8B1
  RCBV11.L8B2 
  RCBV12.L8B1 
  RCBH12.L8B2

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-24 - 17:06

RAT meeting 24/4/2007

PDF RAT_20070424.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x24x17x05/RAT_20070424.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-23 - 17:38

RAT meeting 23/4/2007

PDF RAT_20070423.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x23x17x37/RAT_20070423.pdf

Comments:

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-04-20 - 18:36

RAT in Point 4 - Minutes of 20th April 2007

PDF RAT_20070420.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x04x20x18x26/RAT_20070420.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-04-20 - 14:18

Short Circuit Test UA27 18/04/2007

PDF planning_sct_UA27_v001.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x04x20x14x10/planning_sct_UA27_v001.pdf

PDF RAT_20070317.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x04x20x14x10/RAT_20070317.pdf

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-20 - 12:49

RAT meeting 20/4/2007

PDF RAT_20070420.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x20x12x49/RAT_20070420.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-04-19 - 19:12

Beam Dump System Commissioning - RAT of April 17, 2007.

Mpp LSS6_v2.mpp:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x19x18x50/LSS6_v2.mpp

PDF RAT_20070417.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x19x18x50/RAT_20070417.pdf

PLANNED INTERVENTIONS IN THE AREA

  • The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
  • A cabling campaign (including fire detection system) is foreseen for w16 to w19. No interferences have been pointed out during the inspection visit of AB/BT, TS/EL and TS/HDO.
  • A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
  • Test of the MSD foreseen for w.29-30.
  • Cool-down of sector 5-6 for mid August.
  • Cool-down of sector 6-7 for mid October.
Open Issues
  • 10.04 Installation of BPMSD AB/BI
  • 10.04 Installation of BCTFD AB/BI
  • 10.04 Modifications on PDC of MKB-67 requested by Norisko AB/BT
  • 10.04 Mounting and alignment of beam dump line in RA63 AT/VAC
  • 10.04 Installation of MKD magnets in RA63 AB/BT
  • 10.04 Installation of junction modules between MKDs in RA67 AT/VAC
  • 03.04 Inspection by Norisko on PDC of UA63
  • 03.04 Assembly of PDC for MKDs in UA63 AB/BT
  • 03.04 Assembly of PDC for MKDs in UA67 AB/BT
  • 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
  • 13.03 Grounding of instrumentation/after deconsignation AB/BT
  • 27.02 TCS: installation on w.18
  • 27.02 Vacuum tube between carbon window and TDE (fabrication on going-ready for the end of June) AB/ATB
  • 27.02 VMTAB bellows are needed for w18 AB/BT
  • 20.02 VAC: bake-out of MKD-6R AT/VAC
  • 20.02 TDE in UD68 ready for end of June
  • 20.02 BPM installation AB/BI
  • 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
  • 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
  • 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
  • 17.04 VAC: bake-out of MKD-6L 20.02
  • 10.04 Beam dump line in TD62 10.04
  • 10.04 BLMs integration 13.03
  • 10.04 Smoothing of the MSD 10.04
  • 03.04 Assembly of PDC for MKBs in UA63 03.04
  • 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
  • 27.03 Grounding of instrumentation/before deconsignation 13.03
  • 10.04 Mounting supports for second beam (on drawings) (6L&R) 13.03
  • 27.03 Place for storing MKDs in UX65 20.03
  • 20.03 Grounding of magnets 13.03
  • 13.03 Intermediate bellows availability 27.02
  • 13.03 Interference between vacuum support and MKD 27.02
  • 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) - late installation of that part of dump line 20.02

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-18 - 19:10

RAT meeting 18/4/2007

PDF RAT_20070418.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x18x19x08/RAT_20070418.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-04-18 - 13:19

SCT in UJ33 - 18th April

PDF RAT_20071704.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x18x13x15/RAT_20071704.pdf

********************************** **********************************

In the Minutes:

* Resume of the two 8hr heat runs

* List of the contact people of the concerned system during the 24hr heat run

********************************** **********************************

Schedule:

22.03 DONE Polarity Check
30.03 DONE CCC tests: preparation for the 8hr run
16.04 DONE First 8hr HEAT RUN ; re-scheduled
17.04 DONE Second 8hr HEAT RUN
18.04 - CCC tests: preparation for the 24hr run
19.04 - 24hr HEAT RUN
20.04 - AUG - UPS test
21.05 - EE 4hr run

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-04-17 - 18:52

RAT in Point 4 - Minutes of 13th April 2007

PDF RAT_20070413.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x04x17x18x51/RAT_20070413.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-16 - 17:35

RAT meeting 16/4/2007

PDF RAT_20070416.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x16x17x33/RAT_20070416.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-13 - 16:15

RAT meeting 13/4/2007

PowerPoint ICC_070413.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x13x16x11/ICC_070413.ppt

PDF RAT_20070413.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x13x16x11/RAT_20070413.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-04-13 - 15:29

Beam Dump System Commissioning - RAT of April 10, 2007.

Comments: PLANNED INTERVENTIONS IN THE AREA

  • The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
  • A cabling campaign (including fire detection system) is foreseen for w16 to w19.
  • A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
  • Test of the MSD foreseen for w.21-22.
  • Cool-down of sector 5-6 for mid August.
  • Cool-down of sector 6-7 for mid October.
Open Issues
  • 10.04 Installation of BPMSD AB/BI
  • 10.04 Installation of BCTFD AB/BI
  • 10.04 Modifications on PDC of MKB-67 requested by Norisko AB/BT
  • 10.04 Mounting and alignment of beam dump line in RA63 AT/VAC
  • 10.04 Installation of MKD magnets in RA63 AB/BT
  • 10.04 Installation of junction modules between MKDs in RA67 AT/VAC
  • 03.04 Inspection by Norisko on PDC of UA63
  • 03.04 Assembly of PDC for MKDs in UA63 AB/BT
  • 03.04 Assembly of PDC for MKDs in UA67 AB/BT
  • 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
  • 13.03 Grounding of instrumentation/after deconsignation AB/BT
  • 27.02 TCS: installation after dump line
  • 27.02 Vacuum tube between carbon window and TDE AB/ATB
  • 27.02 VMTAB bellows are needed for w18 AB/BT
  • 20.02 VAC: bake-out of 6L AT/VAC
  • 20.02 VAC: bake-out of 6R AT/VAC
  • 20.02 TDE in UD68 ready for end of June
  • 20.02 BPM installation AB/BI
  • 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
  • 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
  • 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
  • 10.04 Beam dump line in TD62 10.04
  • 10.04 BLMs integration 13.03
  • 10.04 Smoothing of the MSD 10.04
  • 03.04 Assembly of PDC for MKBs in UA63 03.04
  • 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
  • 27.03 Grounding of instrumentation/before deconsignation 13.03
  • 10.04 Mounting supports for second beam (on drawings) (6L&R) 13.03
  • 27.03 Place for storing MKDs in UX65 20.03
  • 20.03 Grounding of magnets 13.03
  • 13.03 Intermediate bellows availability 27.02
  • 13.03 Interference between vacuum support and MKD 27.02
  • 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02

-- Main.MirkoPojer - 13 Apr 2007

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-04-13 - 15:28

SCT in UJ33 - 12th April

PDF RAT_20071204.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x13x15x22/RAT_20071204.pdf

PDF SOC_settings_8hrun_UJ33.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x13x15x22/SOC_settings_8hrun_UJ33.pdf

********************************** **********************************

1 - TS-CV confirmed that the ED circuit of the sector 2-3 will be normally operated the 16th-17th and the 19th.

********************************** **********************************

2 - In attachment: the current of each PC in UJ33 in the 4 steps of the 8hr run.

* HEAT RUNS Schedule:

22.03 DONE Polarity Check
30.03 DONE CCC tests: preparation for the 8hr run
16.04 - First 8hr HEAT RUN ; re-scheduled
17.04 - Second 8hr HEAT RUN
18.04 - CCC tests: preparation for the 24hr run
19.04 - 24hr HEAT RUN
20.04 - AUG - UPS test
21.05 - EE 4hr run

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-12 - 15:05

RAT meeting 12/4/2007

PDF RAT_20070412.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x12x15x04/RAT_20070412.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-11 - 17:34

RAT meeting 11/4/2007

PDF RAT_20070411.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x11x17x34/RAT_20070411.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-10 - 12:13

RAT meeting 10/4/2007

PDF RAT_20070410.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x10x12x11/RAT_20070410.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-05 - 12:42

RAT meeting 5/4/2007

PDF RAT_20070405.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x05x12x42/RAT_20070405.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-04 - 16:32

RAT meeting 4/4/2007

PDF RAT_20070404.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x04x16x31/RAT_20070404.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-04-04 - 14:44

Beam Dump System Commissioning - RAT of April 3, 2007.

PDF RAT_20070403.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x04x14x34/RAT_20070403.pdf

PLANNED INTERVENTIONS IN THE AREA

  • The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
  • Smoothing of the MSD is foreseen for this week (w.12).
  • A cabling campaign (including fire detection system) is foreseen for w16 to w19.
  • A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
  • Test of the MSD foreseen for w.21-22.
  • Cool-down of sector 5-6 for mid August.
  • Cool-down of sector 6-7 for mid October.
Open Issues
  • 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
  • 13.03 Mounting supports for second beam (on drawings) (6R) AB/BT
  • 13.03 BLMs integration AB/BT&ICL
  • 13.03 Grounding of instrumentation/after deconsignation AB/BT
  • 27.02 TCS: installation after dump line
  • 27.02 Vacuum tube between carbon window and TDE AB/ATB
  • 27.02 VMTAB bellows are needed for w18 AB/BT
  • 20.02 VAC: bake-out of 6L AT/VAC
  • 20.02 VAC: bake-out of 6R AT/VAC
  • 20.02 TDE in UD68 ready for end of June
  • 20.02 BPM installation AB/BI
  • 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
  • 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
  • 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
  • 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
  • 27.03 Grounding of instrumentation/before deconsignation 13.03
  • 27.03 Mounting supports for second beam (on drawings) (6L) 13.03
  • 27.03 Place for storing MKDs in UX65 20.03
  • 20.03 Grounding of magnets 13.03
  • 13.03 Intermediate bellows availability 27.02
  • 13.03 Interference between vacuum support and MKD L. Ducimetiere 27.02
  • 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-04-04 - 12:31

SCT in UJ33 - 4th April

PDF RAT_20070404.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x04x12x30/RAT_20070404.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-03 - 16:33

RAT meeting 3/4/2007

PDF RAT_20070403.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x03x16x29/RAT_20070403.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-04-02 - 19:02

RAT meeting 2/4/2007

PDF RAT_20070402.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x02x19x02/RAT_20070402.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-04-02 - 19:02

SCT in UJ33 - 2nd April

PDF RAT_20070402.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x02x18x56/RAT_20070402.pdf

Comments: HEAT RUN CANCELLED

  • Maintenance of the water-cooling circuits coming form Point 2 providing water also to the cooling circuits of the power converters in UJ33 was planned to be performed between 02.04 (today) and the 20.04. This manipulation was not taken into account during the planning of the SCT in UJ33.

  • The maintenance caused the stop of the tests and was irreversible: it will be not possible recuperate the cooling power until the end of the intervention.

  • The tests has been rescheduled in agreement with TS-CV. The priority will be given to the work in SX2 (the primary circuit) in order that the water in UJ33 will be available the 16.04.

HEAT RUNS Schedule:

22.03 DONE Polarity Check
30.03 DONE CCC tests: preparation for the 8hr run
2.04 CANCELLED First 8hr HEAT RUN
16.04 - First 8hr HEAT RUN ; re-scheduled
17.04 - Second 8hr HEAT RUN
18.04 - CCC tests: preparation for the 24hr run
19.04 - 24hr HEAT RUN
20.04 - AUG - UPS test
23.04 - EE 4hr run

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2007-04-02 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login