Created by Main.MikeKoratzinos on 2007-04-30 - 18:25

RAT_20070430.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x30x18x20/RAT_20070430.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-27 - 19:39

RAT_20070427.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x27x19x39/RAT_20070427.pdf
Comments:
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-04-27 - 17:47

RAT_20070427.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x04x27x17x39/RAT_20070427.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-04-26 - 23:08
X: previous day -
X : last day -
O : Proposal
|
PC_Config |
PNO.1 |
PNO.2 |
PNO.3 |
|
RCBH11_L8B1 |
X |
X |
X |
X |
|
RCBV11_L8B2 |
X |
X |
X |
X |
|
RCBH12_L8B2 |
X |
X |
X |
O |
|
RCBV12_L8B1 |
X |
X |
X |
O |
|
RCBH13_L8B1 |
X |
X |
X |
O |
|
RCBV13_L8B2 |
X |
X |
X |
O |
|
RCBH14_L8B2 |
X |
X |
X |
O |
|
RCBV14_L8B1 |
X |
X |
X |
O |
|
RCBH15_L8B1 |
X |
X |
O |
O |
|
RCBV15_L8B2 |
X |
X |
O |
O |
|
RCBH16_L8B2 |
X |
X |
O |
O |
|
RCBV16_L8B1 |
X |
X |
O |
O |
|
RCBH17_L8B1 |
- |
|
|
|
PC_Config/crowbar tests to be repeated |
RCBV17_L8B2 |
- |
|
|
|
PC_Config/crowbar tests to be repeated |
RCBH18_L8B2 |
- |
|
|
|
PC_Config/crowbar tests to be repeated |
RCBV18_L8B1 |
- |
|
|
|
PC_Config/crowbar tests to be repeated |
RCBH23_L8B1 |
O |
|
|
|
|
RCBV23_L8B2 |
O |
|
|
|
|
RCBH24_L8B2 |
O |
|
|
|
|
RCBV24_L8B1 |
O |
|
|
|
|
RCBH25_L8B1 |
|
|
|
|
|
RCBV25_L8B2 |
|
|
|
|
|
RCBH27_L8B1 |
|
|
|
|
|
RCBV27_L8B2 |
|
|
|
|
|
RCBH28_L8B2 |
|
|
|
|
|
RCBV28_L8B1 |
|
|
|
|
|
RCBH29_L8B1 |
|
|
|
|
|
RCBV29_L8B2 |
|
|
|
|
|
RCBH31_L8B1 |
|
|
|
|
|
RCBV31_L8B2 |
|
|
|
|
|
RCBH32_L8B2 |
|
|
|
|
|
RCBV32_L8B1 |
|
|
|
|
|
|
PC_Config |
PIC2 |
PNO.1 |
PNO.2 |
PNO.3 |
PNO.4 |
|
RCBCH9_L8B1 |
- |
|
|
|
|
|
PC_Config/crowbar tests and TFA missing |
RCBCV9_L8B2 |
- |
|
|
|
|
|
PC_Config/crowbar tests and TFA missing |
RCBCH10_L8B2 |
- |
|
|
|
|
|
PC_Config/crowbar tests and TFA missing |
RCBCV10_L8B1 |
- |
|
|
|
|
|
PC_Config/crowbar tests and TFA missing |
Other activities:
- PNO3 60A on cells RCBH12_L8B2/RCBV12_L8B1 (manual) – executed by A.Cantone 12:15
- ELQA 60 A cells 20 and 22 (10:00) & DFBAO
- Transfer function Measurement at Nominal current on RCBH11_L8B1 (local test in the tunnel 10:00)
- Calibration of the Cryo-valves (A.Bouillot)
- Condensation appears on Q6/Q7/Q8 120 A Current leads
- Connection of the 120 A PC cell 8. Tests not performed due to condensation.
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-26 - 12:27

RAT_20070426.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x26x12x25/RAT_20070426.pdf
Comments:
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-04-25 - 19:00

25th-26th_April_2007.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x25x18x38/25th-26th_April_2007.pdf
Comments:
Attached file contains the tasks completed on 25th April 2007 and Proposed Programme for 26th April 2007
Mirko Pojer and Blanca Perea for the HCC- 25 Apr 2007
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-25 - 18:14

RAT_20070425.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x25x18x13/RAT_20070425.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-04-25 - 15:43

sct_UA27_v001.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x04x25x15x42/sct_UA27_v001.pdf

RAT_20070425.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x04x25x15x42/RAT_20070425.pdf
Comments:
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-04-25 - 10:11
Morning
PCC Tests (AB/PO) - 10A
RCBH13.L8B1
RCBV13.L8B2
RCBV14.L8B1
RCBH14.L8B2
RCBH15.L8B1
RCBH16.L8B2
RCBV15.L8B2
RCBV16.L8B1
PNO.1
RCBH13.L8B1
RCBV13.L8B2
RCBV14.L8B1
RCBH14.L8B2
Afternoon
PCC Tests (AB/PO) - 10A
RCBCH9.L8B1
RCBCV9.L8B2
RCBCH10.L8B2
RCBCV10.L8B1
PNO.2
RCBH11.L8B1
RCBV11.L8B2
RCBV12.L8B1
RCBH12.L8B2
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-24 - 17:06

RAT_20070424.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x24x17x05/RAT_20070424.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-23 - 17:38

RAT_20070423.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x23x17x37/RAT_20070423.pdf
Comments:
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-04-20 - 18:36

RAT_20070420.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x04x20x18x26/RAT_20070420.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-04-20 - 14:18

planning_sct_UA27_v001.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x04x20x14x10/planning_sct_UA27_v001.pdf

RAT_20070317.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x04x20x14x10/RAT_20070317.pdf
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-20 - 12:49

RAT_20070420.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x20x12x49/RAT_20070420.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-04-19 - 19:12

LSS6_v2.mpp:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x19x18x50/LSS6_v2.mpp

RAT_20070417.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x19x18x50/RAT_20070417.pdf
PLANNED INTERVENTIONS IN THE AREA
- The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
- A cabling campaign (including fire detection system) is foreseen for w16 to w19. No interferences have been pointed out during the inspection visit of AB/BT, TS/EL and TS/HDO.
- A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
- Test of the MSD foreseen for w.29-30.
- Cool-down of sector 5-6 for mid August.
- Cool-down of sector 6-7 for mid October.
Open Issues
- 10.04 Installation of BPMSD AB/BI
- 10.04 Installation of BCTFD AB/BI
- 10.04 Modifications on PDC of MKB-67 requested by Norisko AB/BT
- 10.04 Mounting and alignment of beam dump line in RA63 AT/VAC
- 10.04 Installation of MKD magnets in RA63 AB/BT
- 10.04 Installation of junction modules between MKDs in RA67 AT/VAC
- 03.04 Inspection by Norisko on PDC of UA63
- 03.04 Assembly of PDC for MKDs in UA63 AB/BT
- 03.04 Assembly of PDC for MKDs in UA67 AB/BT
- 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
- 13.03 Grounding of instrumentation/after deconsignation AB/BT
- 27.02 TCS: installation on w.18
- 27.02 Vacuum tube between carbon window and TDE (fabrication on going-ready for the end of June) AB/ATB
- 27.02 VMTAB bellows are needed for w18 AB/BT
- 20.02 VAC: bake-out of MKD-6R AT/VAC
- 20.02 TDE in UD68 ready for end of June
- 20.02 BPM installation AB/BI
- 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
- 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
- 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
- 17.04 VAC: bake-out of MKD-6L 20.02
- 10.04 Beam dump line in TD62 10.04
- 10.04 BLMs integration 13.03
- 10.04 Smoothing of the MSD 10.04
- 03.04 Assembly of PDC for MKBs in UA63 03.04
- 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
- 27.03 Grounding of instrumentation/before deconsignation 13.03
- 10.04 Mounting supports for second beam (on drawings) (6L&R) 13.03
- 27.03 Place for storing MKDs in UX65 20.03
- 20.03 Grounding of magnets 13.03
- 13.03 Intermediate bellows availability 27.02
- 13.03 Interference between vacuum support and MKD 27.02
- 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) - late installation of that part of dump line 20.02
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-18 - 19:10

RAT_20070418.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x18x19x08/RAT_20070418.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-04-18 - 13:19

RAT_20071704.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x18x13x15/RAT_20071704.pdf
**********************************
**********************************
In the Minutes:
* Resume of the two 8hr heat runs
* List of the contact people of the concerned system during the 24hr heat run
**********************************
**********************************
Schedule:
22.03 |
DONE |
Polarity Check |
30.03 |
DONE |
CCC tests: preparation for the 8hr run |
16.04 |
DONE |
First 8hr HEAT RUN ; re-scheduled |
17.04 |
DONE |
Second 8hr HEAT RUN |
18.04 |
- |
CCC tests: preparation for the 24hr run |
19.04 |
- |
24hr HEAT RUN |
20.04 |
- |
AUG - UPS test |
21.05 |
- |
EE 4hr run |
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-04-17 - 18:52

RAT_20070413.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x04x17x18x51/RAT_20070413.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-16 - 17:35

RAT_20070416.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x16x17x33/RAT_20070416.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-13 - 16:15

ICC_070413.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x13x16x11/ICC_070413.ppt

RAT_20070413.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x13x16x11/RAT_20070413.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-04-13 - 15:29
Comments:
PLANNED INTERVENTIONS IN THE AREA
- The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
- A cabling campaign (including fire detection system) is foreseen for w16 to w19.
- A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
- Test of the MSD foreseen for w.21-22.
- Cool-down of sector 5-6 for mid August.
- Cool-down of sector 6-7 for mid October.
Open Issues
- 10.04 Installation of BPMSD AB/BI
- 10.04 Installation of BCTFD AB/BI
- 10.04 Modifications on PDC of MKB-67 requested by Norisko AB/BT
- 10.04 Mounting and alignment of beam dump line in RA63 AT/VAC
- 10.04 Installation of MKD magnets in RA63 AB/BT
- 10.04 Installation of junction modules between MKDs in RA67 AT/VAC
- 03.04 Inspection by Norisko on PDC of UA63
- 03.04 Assembly of PDC for MKDs in UA63 AB/BT
- 03.04 Assembly of PDC for MKDs in UA67 AB/BT
- 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
- 13.03 Grounding of instrumentation/after deconsignation AB/BT
- 27.02 TCS: installation after dump line
- 27.02 Vacuum tube between carbon window and TDE AB/ATB
- 27.02 VMTAB bellows are needed for w18 AB/BT
- 20.02 VAC: bake-out of 6L AT/VAC
- 20.02 VAC: bake-out of 6R AT/VAC
- 20.02 TDE in UD68 ready for end of June
- 20.02 BPM installation AB/BI
- 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
- 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
- 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
- 10.04 Beam dump line in TD62 10.04
- 10.04 BLMs integration 13.03
- 10.04 Smoothing of the MSD 10.04
- 03.04 Assembly of PDC for MKBs in UA63 03.04
- 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
- 27.03 Grounding of instrumentation/before deconsignation 13.03
- 10.04 Mounting supports for second beam (on drawings) (6L&R) 13.03
- 27.03 Place for storing MKDs in UX65 20.03
- 20.03 Grounding of magnets 13.03
- 13.03 Intermediate bellows availability 27.02
- 13.03 Interference between vacuum support and MKD 27.02
- 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02
-- Main.MirkoPojer - 13 Apr 2007
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-04-13 - 15:28

RAT_20071204.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x13x15x22/RAT_20071204.pdf

SOC_settings_8hrun_UJ33.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x13x15x22/SOC_settings_8hrun_UJ33.pdf
**********************************
**********************************
1 - TS-CV confirmed that the ED circuit of the sector 2-3 will be normally operated the 16th-17th and the 19th.
**********************************
**********************************
2 - In attachment: the current of each PC in UJ33 in the 4 steps of the 8hr run.
* HEAT RUNS Schedule:
22.03 |
DONE |
Polarity Check |
30.03 |
DONE |
CCC tests: preparation for the 8hr run |
16.04 |
- |
First 8hr HEAT RUN ; re-scheduled |
17.04 |
- |
Second 8hr HEAT RUN |
18.04 |
- |
CCC tests: preparation for the 24hr run |
19.04 |
- |
24hr HEAT RUN |
20.04 |
- |
AUG - UPS test |
21.05 |
- |
EE 4hr run |
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-12 - 15:05

RAT_20070412.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x12x15x04/RAT_20070412.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-11 - 17:34

RAT_20070411.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x11x17x34/RAT_20070411.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-10 - 12:13

RAT_20070410.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x10x12x11/RAT_20070410.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-05 - 12:42

RAT_20070405.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x05x12x42/RAT_20070405.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-04 - 16:32

RAT_20070404.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x04x16x31/RAT_20070404.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-04-04 - 14:44

RAT_20070403.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x04x04x14x34/RAT_20070403.pdf
PLANNED INTERVENTIONS IN THE AREA
- The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
- Smoothing of the MSD is foreseen for this week (w.12).
- A cabling campaign (including fire detection system) is foreseen for w16 to w19.
- A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
- Test of the MSD foreseen for w.21-22.
- Cool-down of sector 5-6 for mid August.
- Cool-down of sector 6-7 for mid October.
Open Issues
- 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
- 13.03 Mounting supports for second beam (on drawings) (6R) AB/BT
- 13.03 BLMs integration AB/BT&ICL
- 13.03 Grounding of instrumentation/after deconsignation AB/BT
- 27.02 TCS: installation after dump line
- 27.02 Vacuum tube between carbon window and TDE AB/ATB
- 27.02 VMTAB bellows are needed for w18 AB/BT
- 20.02 VAC: bake-out of 6L AT/VAC
- 20.02 VAC: bake-out of 6R AT/VAC
- 20.02 TDE in UD68 ready for end of June
- 20.02 BPM installation AB/BI
- 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
- 20.02 Safety inspection by Norisko on PDC for MKD63 and MKB63
- 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
- 27.03 Safety inspection by Norisko on power distr.rack (MKB67) 20.02
- 27.03 Grounding of instrumentation/before deconsignation 13.03
- 27.03 Mounting supports for second beam (on drawings) (6L) 13.03
- 27.03 Place for storing MKDs in UX65 20.03
- 20.03 Grounding of magnets 13.03
- 13.03 Intermediate bellows availability 27.02
- 13.03 Interference between vacuum support and MKD L. Ducimetiere 27.02
- 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-04-04 - 12:31

RAT_20070404.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x04x12x30/RAT_20070404.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-03 - 16:33

RAT_20070403.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x03x16x29/RAT_20070403.pdf
Comments:
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-04-02 - 19:02

RAT_20070402.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x04x02x19x02/RAT_20070402.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-04-02 - 19:02

RAT_20070402.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x04x02x18x56/RAT_20070402.pdf
Comments: HEAT RUN CANCELLED
- Maintenance of the water-cooling circuits coming form Point 2 providing water also to the cooling circuits of the power converters in UJ33 was planned to be performed between 02.04 (today) and the 20.04. This manipulation was not taken into account during the planning of the SCT in UJ33.
- The maintenance caused the stop of the tests and was irreversible: it will be not possible recuperate the cooling power until the end of the intervention.
- The tests has been rescheduled in agreement with TS-CV. The priority will be given to the work in SX2 (the primary circuit) in order that the water in UJ33 will be available the 16.04.
HEAT RUNS Schedule:
22.03 |
DONE |
Polarity Check |
30.03 |
DONE |
CCC tests: preparation for the 8hr run |
2.04 |
CANCELLED |
First 8hr HEAT RUN |
16.04 |
- |
First 8hr HEAT RUN ; re-scheduled |
17.04 |
- |
Second 8hr HEAT RUN |
18.04 |
- |
CCC tests: preparation for the 24hr run |
19.04 |
- |
24hr HEAT RUN |
20.04 |
- |
AUG - UPS test |
23.04 |
- |
EE 4hr run |
Edit, attach file or add comment