Created by Main.BorisBellesia on 2007-01-31 - 20:38

RAT_20070131.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x31x20x37/RAT_20070131.pdf
Edit, attach file or add comment
Created by Main.AntonioVergara on 2007-01-30 - 14:19

RAT_20070130.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x30x14x18/RAT_20070130.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-30 - 12:35

RAT_20070130.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x30x12x14/RAT_20070130.pdf
Comments:
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-29 - 17:06

RAT_20070129_withAttachments.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x29x17x02/RAT_20070129_withAttachments.pdf
- The short to ground in Sector 78 disappeared last Saturday
- The cooling capacity was restored to 80% today
- The mobile camera run will be planned tomorrow from Point 7
- Preparation for Powering Tests will take place from tomorrow in UA83
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-29 - 12:45

RAT_20070129.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x29x12x44/RAT_20070129.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-26 - 18:03

RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x18x01/RAT_20070126.pdf

LSS6_v1.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x18x01/LSS6_v1.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-26 - 16:43

RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x16x41/RAT_20070126.pdf
Comments:
- At 15:00 8hr run of the 13 kA circuits have been STOPPED due to water cooling circuit.
- TS-CV intervention scheduled for Monday 29.01
- 8hr run for the 13 kA circuits foreseen for the next Tuesday (30.01) after TS-CV intervention.
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-26 - 12:27

RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x26x12x26/RAT_20070126.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2007-01-25 - 18:49

RAT_78_070124.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x25x18x48/RAT_78_070124.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-25 - 17:05

Tests_annuels_des_AUG_LHC.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x25x16x36/Tests_annuels_des_AUG_LHC.ppt
Present :
P. Anderssen, B. Bellesia, C. Castillo Trello, G. Cumer, C. Dehavay, P. Fessia, J.P. Malod Dognin, M. Pojer, R. Saban, E. Barbero Soto, J.Toullieux, S. Weisz
* Presentation of G. Cumer (see attached file)
- The procedures adopted during an AUG have been mentioned.
- Resume of the affected Surface and Underground Areas during the AUG in Point 6.
* Friday 9 Feb. can be a possible date for a AUG in point 6:
Waiting for the “ok” of Installation (S. Weisz/ TS-IC) and Interconnections (P. Fessia/ AT-MCS)
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-25 - 16:31

RAT_20070125.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x25x16x30/RAT_20070125.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2007-01-25 - 11:47

RAT_20070125_2.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x25x11x45/RAT_20070125_2.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-24 - 19:21

RAT_20070124.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x24x19x21/RAT_20070124.pdf
Comments:
Edit, attach file or add comment
Created by Main.JeanPierreMalodDognin on 2007-01-24 - 16:56
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-23 - 14:31

RAT_20070123.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x23x14x25/RAT_20070123.pdf
Comments:
- NEXT RAT will be on thursday 25th january 2007 at 8:30 -- Main.BorisBellesia - 23 Jan 2007 - 14:31
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-22 - 17:17

RAT_20070122.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x22x17x13/RAT_20070122.pdf
Comments:
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-19 - 19:37

RAT_20070119.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x19x19x35/RAT_20070119.pdf
Edit, attach file or add comment
Created by Main.JeanPierreMalodDognin on 2007-01-19 - 16:45

IMGP9979.JPG:
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-19 - 12:24

RAT_20070119.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x19x11x25/RAT_20070119.pdf

SCT-Planning-UA67UJ67-v6.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x19x11x25/SCT-Planning-UA67UJ67-v6.pdf
Open Issues
- 17.01 Broken thermostat on 13 kA EE
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem – all ring
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
Heat Runs and Test Schedule
08.01 |
DONE |
600A and 13 kA EE system IST. |
08.01 |
DONE |
RB IST. ON GOING |
11.01 |
DONE |
120A powering tests. |
15.01 |
DONE |
2 kA powering tests. |
15.01 |
DONE |
600A powering tests. |
17.01 |
DONE |
600A-EE powering tests. |
22.01 |
- |
PIC-PC-QPS Interface tests. |
23.01 |
- |
RQD&F powering tests. |
24.01 |
- |
RB powering tests. |
26.01 |
- |
120A-600A-2kA-RQD/F-RB 8h heat run. |
05.02 |
- |
24h heat run test. |
07.02 |
- |
Polarity test. |
14.02 |
- |
AUG&UPS test. |
- Main.MirkoPojer - 19 Jan 2007 - 11:28
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-18 - 11:14

ELQA-HVQ_cooldown_2007-01-18.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x18x10x46/ELQA-HVQ_cooldown_2007-01-18.pdf

Cooling_LHC_sector78_18Jan07.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x18x10x46/Cooling_LHC_sector78_18Jan07.pdf
Comments:
- Inlet set temperature = 185K
- Cooling Power = 300kW = 50% of nominal
- Leakage Current Monitoring = ok
MircoCoccoli - 18 Jan 2007 - 10:51
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-17 - 17:24

RAT_20070117_with_NC_Mag_Planning.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x17x17x17/RAT_20070117_with_NC_Mag_Planning.pdf
> ATTENTION: next RAT in point 8 on FRIDAY 19th at 8.30am <
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-17 - 16:43

Minutes_WarmMag_LSS8_15Jan07.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x17x15x56/Minutes_WarmMag_LSS8_15Jan07.pdf
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-17 - 11:24

RAT_20070117.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x17x11x19/RAT_20070117.pdf
Open Issues
- 17.01 Broken thermostat on 13 kA EE
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem – all ring
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule
08.01 |
ON GOING |
600A and 13 kA EE system IST |
08.01 |
ON GOING |
RB IST |
11.01 |
DONE |
120A powering tests. |
15.01 |
DONE |
2 kA powering tests. |
17.01 |
ON GOING |
PIC-PC-QPS Interface tests. |
19.01 |
DONE |
600A powering tests. |
23.01 |
- |
600A-EE powering tests. |
26.01 |
- |
120A-600A-2kA 8h heat run. |
30.01 |
- |
RQD&F powering tests. |
02.02 |
- |
RB powering tests. |
07.02 |
- |
RQ&RB 8h heat run. |
12.02 |
- |
24h heat run test. |
14.02 |
- |
AUG&UPS test. |
14.02 |
- |
Polarity test. |
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-16 - 18:33

RAT_20070116.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x16x18x25/RAT_20070116.pdf
Open Issues:
AC non-conformity
- 13.11.06 Non-conformity of the crates of cryo instrumentation (inrush current) (A.Suraci: ready next year)
- 13.11.06 Non-conformity of the AC cabling of the crates under the magnets. This concerns ACR, MEL & VAC.
DC cabling
- 22.11.06 Pre-connection of 120A cables in LSSR7 (TS/EL) – PC Non conformities (H.Thiesen)
Instrumentation Cabling
- 12.01.07 Cryo-instrumentation cables: 2 LSS8L connectors (A.Suraci-J-C.Guillaume)
- 10.01.07 Continuity error with cable 1813004A and a wrong housing of 1702440 which should be replaced (D.Bozzini)
Cryogenics
- 16.01.07 Vac-Cryo Interlock tests – window of 1 day needed (P.Cruikshank-F.Millet)
- 22.11.06 Instrumentation and remote control not fully stable (P.Gayet - F.Millet)
Safety
General remark: written communication in advance to announce operations!!!
- 23.11.06 Water leak on the tunnel concrete wall to be fixed (C33L8).
Preparation of powering test
- 30.11.06 El_QA performed on C16L8. ICC test showed reversed sequence of V-taps on circuit RCBV16.L8B1 (D.Bozzini)
AOB
- 08.01.07 Re-installation of 3 BLMs interfering with pumping groups (B.Dehning)
- 13.11.06 BPM connection in Q2 (R.Jones) – waiting for Inner Triplet to be repaired
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-01-16 - 10:17
Images obtained from Francois Millet

Cooldown.png:
First cooldown QRL 78

First_cooldown_Q9R7.png:
First cooldown Q9R7
Comments:
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-15 - 18:42

RAT_20070115.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x15x18x38/RAT_20070115.pdf
MircoCoccoli - 15 Jan 2007 - 18:40
Open Issues:
AC non-conformity
- 13.11.06 Non-conformity of the crates of cryo instrumentation (inrush current) (A.Suraci: ready next year)
- 13.11.06 Non-conformity of the AC cabling of the crates under the magnets. This concerns ACR, MEL & VAC.
DC cabling
- 22.11.06 Pre-connection of 120A cables in LSSR7 (TS/EL) – PC Non conformities (H.Thiesen)
Instrumentation Cabling
- 12.01.07 Cryo-instrumentation cables: 2 LSS8L connectors (A.Suraci-J-C.Guillaume)
- 10.01.07 Continuity error with cable 1813004A and a wrong housing of 1702440 which should be replaced (D.Bozzini)
Cryogenics
- 22.11.06 Instrumentation and remote control not fully stable (P.Gayet - F.Millet)
Safety
General remark: written communication in advance to announce operations!!!
- 23.11.06 Water leak on the tunnel concrete wall to be fixed (C33L8).
Preparation of powering test
- 30.11.06 El_QA performed on C16L8. ICC test showed reversed sequence of V-taps on circuit RCBV16.L8B1 (D.Bozzini)
AOB
- 08.01.07 Re-installation of 3 BLMs interfering with pumping groups (B.Dehning)
- 13.11.06 BPM connection in Q2 (R.Jones) – waiting for Inner Triplet to be repaired
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-15 - 11:21

RAT_20070115.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x15x11x07/RAT_20070115.pdf
Open Issues:
- 15.01 Loosen bolts on RCBYH4.R6B1 and RCBYV4.R6B2 PCs.
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule:
- 08.01 600A and 13 kA EE system IST. ON GOING
- 08.01 RB IST. ON GOING
- 11.01 120A powering tests. COMPLETED
- 15.01 2 kA powering tests. ON GOING
- 17.01 PIC-PC-QPS Interface tests.
- 19.01 600A powering tests. COMPLETED
- 23.01 600A-EE powering tests.
- 26.01 120A-600A-2kA 8h heat run.
- 30.01 RQD&F powering tests.
- 02.02 RB powering tests.
- 07.02 RQ&RB 8h heat run.
- 12.02 24h heat run test.
- 14.02 AUG&UPS test.
- 14.02 Polarity test.
- Main.MirkoPojer - 15 Jan 2007 - 11:15
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-12 - 18:46

RAT_20070112.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x12x18x43/RAT_20070112.pdf
MircoCoccoli - 12 Jan 2007 - 18:45
Open Issues (Sect 78):
AC non-conformity
- 13.11.06 Non-conformity of the crates of cryo instrumentation (inrush current) (A.Suraci: ready next year)
- 13.11.06 Non-conformity of the AC cabling of the crates under the magnets. This concerns ACR, MEL & VAC.
DC cabling
- 10.01.07 Connection of the NC Magnets in LSS8R (J-C.Guillaume)
- 22.11.06 Pre-connection of 120A cables in LSSR7 (TS/EL) – PC Non conformities (H.Thiesen)
Instrumentation Cabling
- 12.01.07 Cryo-instrumentation cables: 2 LSS8L connectors (A.Suraci-J-C.Guillaume)
- 10.01.07 Continuity error with cable 1813004A and a wrong housing of 1702440 which should be replaced (D.Bozzini)
Cryogenics
- 22.11.06 Instrumentation and remote control not fully stable (P.Gayet - F.Millet)
DFB Commissioning
- 29.11.06 DFBX Pumping of Current Leads insulation vacuum (S.Feher)
Safety
General remark: written communication in advance to announce operations!!!
- 23.11.06 Water leak on the tunnel concrete wall to be fixed (C33L8).
Preparation of powering test
- 30.11.06 El_QA performed on C16L8. ICC test showed reversed sequence of V-taps on circuit RCBV16.L8B1 (D.Bozzini)
AOB
- 08.01.07 Re-installation of 3 BLMs interfering with pumping groups (B.Dehning)
- 13.11.06 BPM connection in Q2 (R.Jones) – waiting for Inner Triplet to be repaired
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-12 - 15:48

RAT_20070112.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x12x15x43/RAT_20070112.pdf
Open Issues:
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem to be fixed for the whole machine
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule:
- 08.01 600A and 13 kA EE system IST. ON GOING
- 08.01 RB IST.
- 11.01 120A powering tests.
- 15.01 2 kA powering tests.
- 17.01 PIC-PC-QPS Interface tests.
- 19.01 600A powering tests.
- 23.01 600A-EE powering tests.
- 26.01 120A-600A-2kA 8h heat run.
- 30.01 RQD&F powering tests.
- 02.02 RB powering tests.
- 07.02 RQ&RB 8h heat run.
- 12.02 24h heat run test.
- 14.02 AUG&UPS test.
- 14.02 Polarity test.
-- Main.MirkoPojer - 12 Jan 2007 - 15:46
Edit, attach file or add comment
Created by Main.BlancaPereaSolano on 2007-01-11 - 18:27

RAT_20070111.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x11x18x26/RAT_20070111.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-10 - 17:47

RAT_20070110.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x10x17x43/RAT_20070110.pdf
Comments:
Edit, attach file or add comment
Created by Main.BlancaPereaSolano on 2007-01-10 - 15:13

RAT_20070110.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x10x15x12/RAT_20070110.pdf
Comments:
Edit, attach file or add comment
Created by Main.IvanMoyaMartinez on 2007-01-09 - 11:05
Some pictures of the water-cooled cables with the labels showing they are following the ECR- EDMS 804188, when it's necessary

P1000209.JPG:

P1000206.JPG:

P1000207.JPG:

P1000208.JPG:
Comments:
Edit, attach file or add comment
Created by Main.MircoCoccoli on 2007-01-08 - 20:35

RAT_20070108.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x01x08x20x33/RAT_20070108.pdf
RAT regarding Cool Down of Sect 78 and preparation for Cool Down of sectors 45 and 81
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-08 - 18:46

RAT_20070108.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x08x18x45/RAT_20070108.pdf
Comments:
Edit, attach file or add comment