Created by Main.MatteoSolfaroli on 2007-03-30 - 18:47

RAT in Point 4 - Minutes of 30th March 2007

PDF RAT_20070330.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x03x30x18x45/RAT_20070330.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-03-30 - 16:24

RAT meeting, 30/03/2007

PDF RAT_20070330.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x30x16x23/RAT_20070330.pdf

Comments:

Edit, attach file or add comment


Created by Main.JacekSzkutnik on 2007-03-30 - 12:55

SCT in UJ33 - 30th March

PDF RAT_20070330.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x30x12x53/RAT_20070330.pdf

************ 8hr HAET RUN: Monday 02.04 - Tuesday 03.04 ************

HEAT RUNS Schedule:

22.03 ON GOING Polarity Check
30.03 ON GOING CCC tests: preparation for the 8hr run
2.04 - First 8hr HEAT RUN
3.04 - Second 8hr HEAT RUN
11.04 - CCC tests: preparation for the 24hr run
12.04 - 24hr HEAT RUN
12.04 - AUG - UPS test
13.04 - EE 4hr run

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-03-28 - 16:40

RAT meeting, 28/3/2007

PDF RAT_20070328.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x28x16x39/RAT_20070328.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-03-28 - 16:25

Beam Dump System Commissioning - RAT of March 27, 2007.

PDF RAT_20070327.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x28x14x18/RAT_20070327.pdf

PLANNED INTERVENTIONS IN THE AREA

  • The bake-out of the whole MKDs-to-MKDs sector will be completed by w28.
  • Smoothing of the MSD is foreseen for this week (w.12).
  • A cabling campaign (including fire detection system) is foreseen for w16 to w19.
  • A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
  • Test of the MSD foreseen for w.21-22.
  • Cool-down of sector 5-6 for mid August.
  • Cool-down of sector 6-7 for mid October.
Open Issues
  • 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
  • 13.03 Mounting supports for second beam (on drawings) (6R) AB/BT
  • 13.03 BLMs integration AB/BT&ICL
  • 13.03 Grounding of instrumentation/after deconsignation AB/BT
  • 27.02 TCS: installation after dump line
  • 27.02 Vacuum tube between carbon window and TDE AB/ATB
  • 27.02 VMTAB bellows are needed for w18 AB/BT
  • 20.02 VAC: bake-out of 6L by w-13 AT/VAC
  • 20.02 VAC: bake-out of 6R by w-15 AT/VAC
  • 20.02 TDE in UD68 ready for end of June
  • 20.02 BPM installation AB/BI
  • 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
  • 20.02 Safety inspection by Norisko on power distr. Racks for MKDs
  • 20.02 Optical fibers for pulsing K. Loukili-TS/EL
Closed Issues
  • 27.02 Safety inspection by Norisko on power distr.Racks (MKBs) 20.02
  • 27.03 Grounding of instrumentation/before deconsignation 13.03
  • 27.03 Mounting supports for second beam (on drawings) (6L) 13.03
  • 27.03 Place for storing MKDs in UX65 20.03
  • 20.03 Grounding of magnets 13.03
  • 13.03 Intermediate bellows availability 27.02
  • 13.03 Interference between vacuum support and MKD L. Ducimetiere 27.02
  • 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-03-28 - 09:50

RAT in Point 4 - Minutes of 23th March 2007

PDF RAT_20070323.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x03x28x09x49/RAT_20070323.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-27 - 16:16

RAT meeting 27/3/2007

PDF RAT_20070327.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x27x16x14/RAT_20070327.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-26 - 19:51

SCT in UJ33 - 26th March

PDF RAT_20070326.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x26x19x45/RAT_20070326.pdf

HEAT RUNS

22.03 - Polarity Check
30.03 - CCC tests: preparation for the 8hr run
2.04 - First 8hr HEAT RUN
3.04 - Second 8hr HEAT RUN
11.04 - CCC tests: preparation for the 24hr run
10.04 - 24hr HEAT RUN
12.04 - AUG - UPS test
13.04 - EE 4hr run

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-26 - 17:34

RAT meeting 26/3/2007

PDF RAT_20070326.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x26x17x20/RAT_20070326.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-23 - 17:22

SCT in UJ33 - 23th March

PDF RAT_20070323.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x23x17x16/RAT_20070323.pdf

PDF Etude-sect-cablesDC-UJ33-tot.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x23x17x16/Etude-sect-cablesDC-UJ33-tot.pdf

ATTACHED: Machine Profile for the 8hr run in UJ33: Power Converters Utilization Factors

EE sys IST

6.03 DONE 600A EE systems IST - DFBLC
12.03 DONE 600A EE systems IST - DFBAE
16.03 DONE 600A EE systems IST - DFBM
6.03 DONE 13kA EE systems IST - L7
13.03 DONE 13kA EE systems IST - R7
DFBLC
14.03 DONE 600A no EE PC – IST
15.03 DONE 600A-EE interlock tests
15.03 DONE 600A-EE PC - IST
DFBAE+120A UJ33L
20.03 DONE 600A no EE PC; IST
23.03 DONE 600A-EE Interlock tests
23.03 DONE 600A-EE powering
28.03 DONE 120A; powering
DFBMD - L&R
29.03 DONE 120A - DFBM - powering
29.03 DONE 600A-EE interlock tests
29.03 DONE 600A-EE powering
WARM-MAGN. PC+120A UJ33R
2.04 DONE 600A - Warm magnets
4.04 DONE 120A 1; powering
HEAT RUNS
5.04 - 8hr HEAT RUN
6.04 - CCC tests
10.04 - 24hr heat run test
2.04 - Polarity Check
12.04 - EE 4hr run
13.04 - AUG- UPS test

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-23 - 15:46

RAT meeting 23/3/2007

PDF RAT_20070323.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x23x15x45/RAT_20070323.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-03-23 - 09:55

Beam Dump System Commissioning - RAT of March 20, 2007.

PDF RAT_20070320.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x23x09x40/RAT_20070320.pdf

Planned interventions in the area

  • Smoothing of the MSD is foreseen for this week (w.12).
  • A campaign for fire detection system cabling is foreseen for w14 to w17.
  • A water maintenance intervention has been scheduled for the w18 to w20 (demineralised water, cryogenic services and iced water will be affected).
  • Test of the MSD foreseen for w.21-22.
  • Cool-down of sector 5-6 for mid August.
  • Cool-down of sector 6-7 for mid October.
Open Issues
  • 20.03 Mismatch between TCDS and MSD AT/VAC&AB/BT
  • 20.03 Place for storing MKDs in UX65 AB/BT
  • 13.03 Mounting supports for second beam (on drawings) AB/BT
  • 13.03 BLMs integration AB/BT&ICL
  • 13.03 Grounding of instrumentation AB/BT
  • 27.02 TCS: installation after dump line
  • 27.02 Vacuum tube between carbon window and TDE AB/ATB
  • 27.02 VMTAB bellows are needed for w18 AB/BT
  • 20.02 VAC: bake-out of 6L by w-13 AT/VAC
  • 20.02 VAC: bake-out of 6R by w-15 AT/VAC
  • 20.02 TDE in UD68 ready for end of June
  • 20.02 BPM installation AB/BI
  • 20.02 Vacuum pipe on Q4 AT/VAC-AB/BT
  • 20.02 Safety inspection by Norisko on power distr. racks
  • 20.02 Optical fibers for pulsing (compl. W11) K. Loukili-TS/EL
Closed Issues
  • 20.03 Grounding of magnets 13.03
  • 13.03 Intermediate bellows availability 27.02
  • 13.03 Interference between vacuum support and MKD L. Ducimetiere 27.02
  • 27.02 Space in UJ62 and UJ67 for installation of spare TDE (and transport equipment) – late installation of that part of dump line 20.02

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-22 - 18:21

RAT meeting 22/3/2007

PDF RAT_20070322.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x22x18x07/RAT_20070322.pdf

PowerPoint ELQA_RAT_22-03-2007.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x22x18x07/ELQA_RAT_22-03-2007.ppt

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-21 - 18:43

RAT meeting 21/3/2007

PDF RAT_20070321.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x21x18x41/RAT_20070321.pdf

Comments:

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-03-21 - 14:25

SCT in UJ33 - 21st March

PDF RAT_20070321.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x21x14x20/RAT_20070321.pdf

Comments: EE sys IST

6.03 DONE 600A EE systems IST - DFBLC
12.03 DONE 600A EE systems IST - DFBAE
16.03 DONE 600A EE systems IST - DFBM
6.03 DONE 13kA EE systems IST - L7
13.03 DONE 13kA EE systems IST - R7
DFBLC
14.03 DONE 600A no EE PC – IST
15.03 DONE 600A-EE interlock tests
15.03 DONE 600A-EE PC - IST
DFBAE+120A UJ33L
20.03 ON GOING 600A no EE PC – IST
23.03 DONE 600A-EE Interlock tests
23.03 DONE 600A-EE powering
28.03 DONE 120A – powering
DFBMD - L&R
29.03 - 120A - DFBM - powering
29.03 - 600A-EE interlock tests
29.03 - 600A-EE powering
WARM-MAGN. PC+120A UJ33R
2.04 ONGOING 600A - Warm magnets
4.04 - 120A – powering
HEAT RUNS
5.04 - 8hr HEAT RUN
6.04 - CCC tests
10.04 - 24hr heat run test
2.04 - Polarity Check
12.04 - EE 4hr run
13.04 - AUG- UPS test

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-03-21 - 10:56

RAT in point 4 - Minutes of 16th March

PDF RAT_20070316.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x03x21x10x54/RAT_20070316.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-19 - 17:55

RAT meeting 19/3/2007

PDF RAT_20070319.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x19x17x48/RAT_20070319.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-19 - 11:36

SCT in UJ33 - 19th March

PDF RAT_20070319.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x19x11x30/RAT_20070319.pdf

EE sys IST

6.03 DONE 600A EE systems IST - DFBLC
12.03 DONE 600A EE systems IST - DFBAE
16.03 DONE 600A EE systems IST - DFBM
6.03 DONE 13kA EE systems IST - L7
13.03 DONE 13kA EE systems IST - R7
DFBLC
14.03 DONE 600A no EE PC – IST
15.03 DONE 600A-EE interlock tests
15.03 DONE 600A-EE PC - IST
DFBAE+120A UJ33L
20.03 ON GOING 600A no EE PC – IST
23.03 DONE 600A-EE Interlock tests
23.03 ON GOING 600A-EE powering
28.03 - 120A – powering
DFBMD - L&R
29.03 - 120A - DFBM - powering
29.03 - 600A-EE interlock tests
29.03 - 600A-EE powering
WARM-MAGN. PC+120A UJ33R
2.04 - 600A - Warm magnets
4.04 - 120A – powering
HEAT RUNS
5.04 - 8hr HEAT RUN
6.04 - CCC tests
10.04 - 24hr heat run test
2.04 - Polarity Check
12.04 - EE 4hr run
13.04 - AUG- UPS test

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-16 - 17:14

RAT meeting 16/3/2007

PDF RAT_20070316.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x16x17x14/RAT_20070316.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-15 - 19:18

SCT in UJ33 - 15th Mar.

PDF RAT_20070315.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x15x18x46/RAT_20070315.pdf

EE sys IST

6.03 DONE 600A EE systems IST - DFBLC
12.03 DONE 600A EE systems IST - DFBAE
16.03 DONE 600A EE systems IST - DFBM
6.03 ON GOING 13kA EE systems IST - L7
13.03 DONE 13kA EE systems IST - R7
DFBLC
14.03 ON GOING 600A no EE PC – IST
15.03 ON GOING 600A-EE interlock tests
15.03 ON GOING 600A-EE PC - IST
DFBAE+120A UJ33L
20.03 - 600A no EE PC – IST
23.03 - 600A-EE Interlock tests
23.03 - 600A-EE powering
28.03 - 120A – powering
DFBMD - L&R
29.03 - 120A - DFBM - powering
29.03 - 600A-EE interlock tests
29.03 - 600A-EE powering
WARM-MAGN. PC+120A UJ33R
2.04 - 600A - Warm magnets
4.04 - 120A – powering
HEAT RUNS
5.04 - 8hr HEAT RUN
6.04 - CCC tests
10.04 - 24hr heat run test
2.04 - Polarity Check
12.04 - EE 4hr run
13.04 - AUG- UPS test

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-03-15 - 18:34

Beam Dump System Commissioning - RAT of Tuesday, 13.

PDF RAT_20070313.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x15x18x18/RAT_20070313.pdf

Text MTF_STEPS.txt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x15x18x18/MTF_STEPS.txt

Comments:

Edit, attach file or add comment


Created by Main.JacekSzkutnik on 2007-03-15 - 10:13

Electrical problem on dipole 1055 installed in sector 7-8 and recommendations on powering

EDMS document nr. 828962

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-14 - 19:32

RAT meeting 14/3/2007

PDF RAT_20070314.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x14x19x30/RAT_20070314.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-13 - 20:25

SCT in UJ33 - 13th Mar.

PDF RAT_20070313.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x13x20x24/RAT_20070313.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-12 - 18:57

RAT in Point 4 - Minutes of 9th March 2007

PDF RAT_20070309.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint4x2007x03x12x18x56/RAT_20070309.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-12 - 18:07

RAT meeting 12/3/2007

PDF RAT_20070312.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x12x18x06/RAT_20070312.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-09 - 18:54

RAT meeting 9/3/2007

PDF RAT_20070309.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x09x18x53/RAT_20070309.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-03-08 - 18:07

Beam Dump System Commissioning - RAT of Tuesday, 6.

PDF RAT_20070306.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x08x18x06/RAT_20070306.pdf

PDF LSS6_v2.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x03x08x18x06/LSS6_v2.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-08 - 17:18

RAT minutes 8/3/2007

PDF RAT_20070308.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x08x17x17/RAT_20070308.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-08 - 11:47

SCT in UJ33 - 8th Mar.

PDF RAT_20070308.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x08x11x39/RAT_20070308.pdf

PDF Rapport_de_visite_du_7_mars_2007_point_3.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x08x11x39/Rapport_de_visite_du_7_mars_2007_point_3.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-07 - 15:47

RAT meeting 7/3/2007

PDF RAT_20070307.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x07x15x46/RAT_20070307.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-06 - 17:21

SCT in UJ33 - 6th Mar.

PDF UJ33.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint3x2007x03x06x17x18/UJ33.pdf

Attached file contains:

  • Short Circuit Test Schedule

  • UJ33 Area divided with respect to the concerned circuits

  • Circuits names

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-05 - 18:42

RAT meeting 5/3/2007

PDF RAT_20070305.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x05x18x41/RAT_20070305.pdf

Comments:

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-02 - 17:45

RAT meeting point 8 - 2/3/2007

PDF RAT_20070302.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x02x17x44/RAT_20070302.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-03-01 - 15:49

SCT in RR73 and UJ76 - Mar. 1st

PDF RAT_20070301.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint7x2007x03x01x15x39/RAT_20070301.pdf

********************************************

* All converters in RR73 and UJ76 VALIDATED during 24hr heat run

********************************************

07.02 DONE Water circuit filters cleaning in RR73
12.02 DONE ERD1 powering, FGCs configuration and first tests in RR73
13.02 DONE 120A (RR73) powering tests
14.02 DONE 600A (RR73) powering tests
14.02 DONE Full power ventilation test
15.02 DONE 600A-EE interlock and powering tests
15.02 DONE 600A-EE interlock tests
20.02 DONE 600A (UJ76) powering tests
21.02 DONE Water circuit filters cleaning in UJ76
22.02 DONE Polarity test
23.02 DONE 8h heat run in RR73 and UJ76
26.02 DONE Water circuit filters cleaning in RR73/UJ76
27.02 DONE CCC test for 24h run
28.02 DONE 24h heat run test
01.03 DONE Electrical services-Inom-Imax
01.03 DONE EE-QPS test at Imax
02.03 - 13kA EE tests
02.03 - AUG&UPS

Edit, attach file or add comment


Created by Main.MikeKoratzinos on 2007-03-01 - 10:01

RAT minutes 28/2/2007

PowerPoint sector78-vacinterlock26-2-07.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x01x09x59/sector78-vacinterlock26-2-07.ppt

PDF RAT_20070228.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x03x01x09x59/RAT_20070228.pdf

Comments:

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions