Created by Main.UnknownUser on 2006-03-30 - 08:53
Comments:
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-03-30 - 08:50
Comments:
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-03-30 - 08:49
Comments:
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-03-30 - 08:48
Comments:
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-03-30 - 08:46
Comments:
Edit, attach file or add comment
Created by Main.RobertoSaban on 2006-03-30 - 08:36
At the request of Sebastien Pelletier from TS-MEL/Cabling Section, I asked Pierre Charrue and his team to remove all the computing equipment in UA43. The PCs, monitors and the big screen are now stored by AB-CO. A request to re-install this must be made to them a month in advance of the start of the Short Circuit Tests in UA43 en of July 2006.
Comments:
-- Main.JeanPierreMalodDognin - 05 Apr 2006
Et, hier 4 avril...pour en rajouter une couche(!) dans le demontage(provisoire?) de le SdeC,j ai -apres demande de Rosario- demonte les baches qui en cachait l interieur ...la video surveillance est toujours operationnelle et l acces par code conserve.
-- Main.JeanPierreMalodDognin - 05 Apr 2006
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-03-27 - 12:14
Comme je suis allé faire un’’ tour de chauffe’’ dans la RR77 ce PM, je me permet de vous faire profiter de ces quelques photos (une fois n est pas
coutume) que j ai cru bon de faire, comme une carte postale du bout du monde (faut pas pousser quand même… )
Les choses sont moins ‘’étendues’’ que je ne le pensais a priori.. .
J ai matérialise les emplacements des convertisseurs par des flèches rouges (c est leurs seule position possible, je présume..)
Les ‘’ contacteurs ‘’ sont au premier étage et accessibles seulement par une …échelle (flèche verte)
JP Malod-Dognin
Comments:

RR771.JPG:

RR773bis.jpg:

RR775.JPG:
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-03-22 - 16:16
My experience for accessing ATLAS and the services areas around Point 1.
Getting access to ATLAS means: spending 45 minutes with a web-based security course, pass the exams (in less than three trials unless you want to suffer the shame of being visited by the responsible in order to evaluate your capabilities), ask for permission via the EDH, wait for approval and (IMPORTANT!) wait till next day to access unless you want to spend one useless ride to the ATLAS site since the access grants are renewed at midnight.
If you dont wait till next day (e.g. the author) you will only be allowed to access the tunnel via the corresponding lift and you will not be able to open the door connecting the service area with the ATLAS cavern because since last month they are closed and also ask for identification.
So, if you are in a hurry, take the course at least 3 days before the day you need to go down.
(Nevertheless, some times the identification system of the underground doors is broken, workers put a stone to prevent them from closing, and the impatient author is able to visit the cavern).
Comments:
Bien decide hier , 4 avril, a rallier le point 1 pour demander autographe a la Reine de Norvege et sa cour,en visite dans nos murs....j ai du changer mon ..fusil d epaule, puisque refoule par le service d ordre, desapointe et tres decu, cachant mon chagrin et mon livre d autographes.
J ai donc pris le chemin des profondeurs pour UJ13 et RR13 (et RR17 ) d ou j'ai ramene pour le plus grand bonheur de tous j espere ,ces quelques cliches-temoins de l avancement des travaux.
-- Main.JeanPierreMalodDognin - 05 Apr 2006
Edit, attach file or add comment
Created by Main.RobertoSaban on 2006-03-13 - 13:37
Les tests de validation du cryoplant du Point 8 (stockages helium et azote, refrigerateurs 4.5 K, unites de refrigeration 1.8 K et boite d'interconnection) démarreront ce mercredi 15 mars 2006. La fin des tests est programmee le 30 mai 2006.
En prevision des tests de Hardware Commissioning des secteurs 7-8 et 8-1, ces runs cryoplant P8 permettront de valider les dernieres consolidations mecaniques apportees au systeme cryogenique et ils permettront aussi de valider les differents modes d'operation normaux et degrades de l'ensemble de nos equipements cryogeniques presents au P8.
Pour informer le personnel circulant au P8, le message d'information ci-joint sera affiche sur les differents points d'acces des batiments cryo de surface et des zones cryo en caverne. Tout commentaire de fond et/ou de forme sur la note d'information jointe est le bienvenu.
A votre disposition pour tout complement, meilleures salutations,
Francois Millet
Resp. operation cryo P8
*
Message_P8cryorun_spring2006.ppt: Sign to be posted in Point 8
Comments:
Edit, attach file or add comment