Created by Main.BorisBellesia on 2007-05-15 - 18:59
9:30 | Test start on D2 – QH on. |
9:40 | Up to ~90A apparently without QPS protection – Actually It was not the case. |
15.24 | QH enabled for RD2.L8, QPS interlock problem on D2 understood. Only the displayed ref. voltage was a sum of the voltage picked up from the two apertures instead of a difference. At the level of protection the signal was right. |
15:34 | PCC start on D2 - up to 200A at 16:00 |
---|---|
17:30 | Loss of Cryo-Start and Cryo-Maintain due to a hardware intervention. Physical cryo conditions were stable. Signals recovered after few minutes. |
16:23 | PCC for D2 finished successfully |
17:40 | HQ of RQ4.L8 on – Reiner changed |
17:50 | Still problems on Q4 – Picked voltage exceed 20mV when PC tries to start up – QPS trips the PC. |
19:00 | Tests end |
DFBAO | ElQA continuity test |
DFBAN | ElQA continuity test |
RQ4.L8 | AT-MEL General re-check AB-PO - Special test with a 60A power converter – charatizarion |
DFBMC-A | PIC2 on the 120A corrector circuits. |
DFBMA | RQ4.L8 RD2.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 RD2.L8 |
Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 RD2.L8 |
Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 RD2.L8 |
Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 RD2.L8 |
PC configuration UP TO 100 A |
AB/PO |
DFBMC | RQ5.L8 |
Balisage with flashing lights | HCC |
RQ5.L8 | Warn the QPS team that the main circuit will be powered | HCC | |
RQ5.L8 | Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ5.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ5.L8 | PC configuration UP TO 100 A |
AB/PO |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | |
|
|
|
|
||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-15 - 16:13
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-15 - 14:28
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | ON GOING | 09-05-07 |
8h run 4-8kA | - | 24-05-07 |
Interlock tests RQD&F | - | 16-05-07 |
Powering tests RQD&F | - | 23-05-07 |
Preparation RB.A23 | ON GOING | 19-04-07 |
Interlock tests RB.A23 | - | 29-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Pic interface test | - | 16-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | ON GOING | 08-05-07 |
600A-EE interlock tests | - | 16-05-07 |
600A-EE powering tests | DONE | 08-05-07 |
8 hr run PC < 2kA | - | 24-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity test < 8KA | - | 25-05-07 |
Polarity Check > 8KA | - | 05-06-07 |
AUG- UPS test | - | 08-06-07 |