Created by Main.MariaPazCasasLino on 2007-05-16 - 17:38

Short Circuit Test UA27 - 16th May

PDF RAT_20070516.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x05x16x16x53/RAT_20070516.pdf

PDF sct_UA27_v004.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint2x2007x05x16x16x53/sct_UA27_v004.pdf

Comments: Note that next 18th May, the intervention of the geometers in the UA27 will go on along the day and a WiFi intervention will take place in the morning. During this intervention a lost of the signal is foreseen during about 15 minutes.

     
13kA EE DONE 16-04-07
600A EE DONE 23-04-07
     
Circuits >2kA    
Powering tests PC 4-8kA ON GOING 09-05-07
8h run 4-8kA - 24-05-07
Interlock tests RQD&F - 22-05-07
Powering tests RQD&F - 23-05-07
Preparation RB.A23 ON GOING 19-04-07
Interlock tests RB.A23 - 29-05-07
Powering tests RB.A23 - 30-05-07
8h run >= 8kA - 04-06-07
Pic interface test - 16-06-07
Circuits < 2kA    
120A powering tests DONE 03-05-07
600ANOEE powering tests ON GOING 08-05-07
600A-EE interlock tests - 22-05-07
600A-EE powering tests DONE 08-05-07
8 hr run PC < 2kA - 24-05-07
     
24hr heat run test - 07-06-07
Polarity test < 8KA - 25-05-07
Polarity Check > 8KA - 05-06-07
AUG- UPS test - 08-06-07

Edit, attach file or add comment


Created by Main.MariaPazCasasLino on 2007-05-16 - 17:02

Warm Magnets Commissioning at point 5 - Minutes 11-05-2007

PDF Planning.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2007x05x16x16x40/Planning.pdf

PDF RAT_planning_20070511_WM5.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2007x05x16x16x40/RAT_planning_20070511_WM5.pdf

Comments:

-- Main.MariaPazCasasLino - 16 May 2007

Edit, attach file or add comment


Created by Main.MariaPazCasasLino on 2007-05-16 - 15:50

Powering Tests Sector 7-8 - Minutes 16/05/2007

PDF RAT_20070516.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x05x16x15x44/RAT_20070516.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-05-16 - 12:25

Powering Tests: 16 May 2007

Program for 16.05.2007 - afternoon

14:00 PCC for Q5
15:00 PIC2 for D2,Q4,Q5: Ivan and Boris from the CCC, the rest in the FCC If things go smoothly
16:00 Start P2N, preferably Q5, final decision around 15:00. In the sequence a quench at 1000A will be provoked (if we reach this far)

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2007-05-02 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login