Complete cycle of Q5 up to nominal current (4310 A) PNO.8d. Test OK. |
Correctors of Q4 and Q5 |
Battery test of six correctors: PNO.3. Test OK. |
Battery test of six correctors: PNO.4 (SPA). Not OK for FGC software problem. | |
Q4 corrector released by MPP after quench analysis. PNO.3. Test OK. | |
|
Powering to nominal cycle of all the matching section ML8 together. Test not OK for quench in D2 and Q4. The quench occurred when all the circuits were at about 80% of the nominal current. Maximum was 5268 A for D2. |
ElQA 13kA | Completed for RQF and RQD. In RB discharged at 1.7 kV (1.9 kV nominal). Cryo instrumentation was disconnected and next discharged was at 300 V. In the evening it was foreseen to repeat it with all the electronic disconnected. |
---|
ElQA | HV tests dipole circuit RQ6.R7 High voltage test to be repeated |
---|---|
RQ6.R7 in DFBMH | Once ElQA finished and insulation plug restored * QPS controller to be reprogrammed * Current leads to be connected * PCC Circuit Config |
Matching Section ML8 | Blocked by MPP till deeper understanding of the quench event. No powering tests till MPP releases it. |
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-31 - 17:54
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-31 - 17:52
EE - IST | ||
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | DONE | 11-05-07 |
8h run 4-8kA | ONGOING | 29-05-07 |
Interlock tests RQD&F | ONGOING | 30-05-07 |
Powering tests RQD&F | ONGOING | 30-05-07 |
Preparation RB.A23 | DONE | 19-04-07 |
Interlock tests RB.A23 | DONE | 25-05-07 |
Powering tests RB.A23 | ONGOING | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | DONE | 08-05-07 |
600A-EE interlock tests | DONE | 03-05-07 |
600A-EE powering tests | DONE | 18-05-07 |
8 hr run PC < 2kA | DONE | 29-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity Check < 8KA | - | 30-05-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-05-30 - 18:52
|
RCBYVS4.L8B1; RCBYVS4.L8B2; RCBYV4.L8B1 went through PNO.1, PNO.2 and partially PNO.3 |
RCBYVS4.L8B2 had a training quench during PNO.2 |
|
RCBCH5.L8B1; RCBCV5.L8B2; RCBYH4.L8B2; RCBYHS4.L8B1 went partially through PNO.3 |
|
|
Unbalanced ramp up to nominal and unbalanced quench (PNO.8c) Third trial for the unbalanced cycle up to nominal: B1 and B2 got to nominal current. In the ramp down of B1, due to a too the fast negative slope the converter tripped. B2 slow power abort commanded by PIC. (Since B2 reached nominal current, there is not need to repeat the quench at nominal current in both apertures, PNO.7a is considered OK) |
Provoked unbalanced quench with (B1 at nominal). PNO.8c OK. | |
Current cycle up to nominal PNO.9 | |
|
Provoked unbalanced quench with (B1 at nominal). Ramp down from nominal this time worked OK. PNO.8c OK. |
|
RCBYVS4.L8B1; RCBYVS4.L8B2; RCBYV4.L8B1; RCBCH5.L8B1; RCBCV5.L8B2; RCBYH4.L8B2; RCBYHS4.L8B1; should go through PNO.3 and PNO.4 |
|
Current cycle up to nominal PNO.9 on Q5. |
As soon as they are released, the squeeze function test will be performed on these 2 circuits. |
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-05-29 - 18:52
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-29 - 17:27
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-29 - 11:12
EE - IST | ||
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | DONE | 11-05-07 |
8h run 4-8kA | ONGOING | 29-05-07 |
Interlock tests RQD&F | ONGOING | 30-05-07 |
Powering tests RQD&F | - | 30-05-07 |
Preparation RB.A23 | DONE | 19-04-07 |
Interlock tests RB.A23 | DONE | 25-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | DONE | 08-05-07 |
600A-EE interlock tests | DONE | 03-05-07 |
600A-EE powering tests | DONE | 18-05-07 |
8 hr run PC < 2kA | ONGOING | 29-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity Check < 8KA | - | 30-05-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.BlancaPereaSolano on 2007-05-29 - 10:57
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-25 - 21:28
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-25 - 21:15
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-25 - 11:33
EE - IST | ||
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | DONE | 11-05-07 |
8h run 4-8kA | - | 29-05-07 |
Interlock tests RQD&F | ONGOING | 02-05-07 |
Powering tests RQD&F | - | 24-05-07 |
Preparation RB.A23 | ON GOING | 19-04-07 |
Interlock tests RB.A23 | DONE | 25-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | DONE | 08-05-07 |
600A-EE interlock tests | DONE | 03-05-07 |
600A-EE powering tests | DONE | 18-05-07 |
8 hr run PC < 2kA | - | 29-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity Check < 8KA | - | 30-05-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-24 - 19:26
Edit, attach file or add comment
Created by Main.AntonioVergara on 2007-05-24 - 15:02
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-05-24 - 10:06
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-23 - 19:02
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-23 - 12:26
EE - IST | ||
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | - | 11-05-07 |
8h run 4-8kA | ON GOING | 29-05-07 |
Interlock tests RQD&F | ONGOING | 02-05-07 |
Powering tests RQD&F | - | 24-05-07 |
Preparation RB.A23 | ON GOING | 19-04-07 |
Interlock tests RB.A23 | - | 29-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | ON GOING | 08-05-07 |
600A-EE interlock tests | ON GOING | 03-05-07 |
600A-EE powering tests | DONE | 18-05-07 |
8 hr run PC < 2kA | - | 29-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity Check < 8KA | - | 30-05-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.AntonioVergara on 2007-05-23 - 12:01
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-22 - 22:46
PNO.1 | PNO.2 | |
---|---|---|
RCBCH5.L8B1 | O | O |
RCBCv5.L8B1 | O | O |
RCBYH4.L8B2 | O | O |
RCBYHS4.L8B1 | O | O |
RB.A78, RQF.A78 (?), RQD.A78 (?) | Powered by their own converter | DFBA, QPS, EE, PC, PIC Preparation (this week) |
ARC @ 1.9K | ElQA @ 1.9K RB & RQD | |
QPS Heater Discharge | ||
PIC1 RB & RQF | ||
Connection DC cable - lead | ||
PC_CONFIG RQ - 350A | ||
PIC 2 RQ - 350A | ||
PC_CONFIG RB - 350A | ||
PIC 2 RB - 350A | ||
P2N RQ - Max 760A | ||
P2N RB - Max 760A | ||
Powered by a 120A converter | DFBA, QPS, EE, PC, PIC Preparation (this week) | |
ARC @ 4.5K | PIC1 RB & RQD - Without Quench Heaters | |
Connection DC cable - lead | ||
PC_CONFIG RQ - 100A | ||
PC_CONFIG RB - 100A | ||
600A Circuits - Priority 1, 25 Circuits | ARC @ 4.5K or 1.9K | DFBA, QPS, EE, PC, PIC Preparation (this week) |
ElQA @ 4.5K-1.9K first Circuits | ||
QPS Last Conditioning | ||
PC_CONFIG first circuits | ||
ARC @ Superfluid Helium | DFBA, QPS, EE, PC, PIC Preparation (this week) | |
ElQA @ 4.5K-1.9K All Circuits | ||
QPS Last Conditioning | ||
PIC2 First Circuits | ||
PCS First Circuits | ||
PC_Config, PIC2, PCS rest of circuits - Parallel |
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-22 - 19:44
EE - IST | ||
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | - | 11-05-07 |
8h run 4-8kA | ON GOING | 29-05-07 |
Interlock tests RQD&F | - | 02-05-07 |
Powering tests RQD&F | - | 24-05-07 |
Preparation RB.A23 | ON GOING | 19-04-07 |
Interlock tests RB.A23 | - | 29-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | ON GOING | 08-05-07 |
600A-EE interlock tests | ON GOING | 03-05-07 |
600A-EE powering tests | DONE | 18-05-07 |
8 hr run PC < 2kA | - | 29-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity Check < 8KA | - | 30-05-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-05-22 - 18:34
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-05-22 - 18:33
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-22 - 17:47
WM8 | LHCb | |
23.05 MORNING | Verification signalization in the tunnel. Consignation all TI8 LHC PC. Disconnection of the DC cables to the TI8 LHC PC. WELQA on the MSI magnets |
|
23.05 AFTERNOON | WELQA on the rest of the TI8 LHC magnets. Connection of the DC cables to the TI8 LHC PC. Déconsignation all TI8 PC. |
|
24.05 MORNING | Verification signalization in the tunnel. Repeat the WELQA in the circuits where it could not be completed. Connection of the DC cables to the TI8 LHC PC. Déconsignation all TI8 PC. Polarity check TI8 LHC magnets. From 13:00 to 14 :30 Déconsignation PC compensators 1. RPTN.SR8.RBXWSH.L8 1. RPTN.SR8.RBXWH.L8 Switch on RPTN.SR8.RBXWSH.L8 and verification at the magnet level. Switch off RPTN.SR8.RBXWSH.L8 Switch on RPTN.SR8.RBXWH.L8 and verification at the magnet level. Switch off RPTN.SR8.RBXWH.L8 |
From 13:00 to 14:30 No work around the ANY compensator magnets |
24.05 AFTERNOON | Start 24h Heat Run (TI8 LHC + COMPENSATORS L8) (I ultimate) | No work around the compensator magnets |
25.05 MORNING |
24h Heat Run ongoing Temperatures measurements at the end 24h Heat Run |
No work around the compensator magnets |
25.05 AFTERNOON |
Turn on all TI8 magnets PC, RPTN.SR8.RBXWSH.L8 and RPTN.SR8.RBXWH.L8. Start 1st Interferences Evaluation Start solution on non conformity on power converter of MQIF87800 (3e-4 ripple) |
No work around the compensator magnets |
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-22 - 11:42
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-22 - 00:23
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-05-21 - 10:38
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-20 - 22:20
9:30 | Powering Procedure for RQ5B1(B2).L8 started |
11:30 | PLI1.1-4-7 I_inj: 350A PLI2.1-3-4 I_int_1: 1000A procedures performed manually and NOT using the sequencer |
13:00 | Boil-off test on DFBMA-C |
The current was ramped to 1000 A, and the magnet was quenched by triggering the firing of the quench heaters. |
The different teams performed a preliminary analysis of the data that had been taken, and some observations were reported: |
The |
The balancing of the |
|
At the first glance it appears that all required data after the quench were recorded and written into the PM system. |
The heater discharge worked as expected. It was correctly recorded, but due to one point with the wrong time the start of graph was wrong. This will be corrected (Action: R.Denz and A.Rijllart). |
|
|
Since the procedures were executed without the sequencer, that data that was recorded needs to be put into MTF manually (Action: HCC) |
Continue commissioning of |
Start commissioning of the 120A circuits using the sequencer. This can be done in parallel to Q5 commissioning, although there might be some interference. |
When Q5 is commissioned, Q4 and D2 will follow. Before starting to commission D2,y the QPS team needs to intervene in order to correct a problem that was reported after PIC2. |
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-05-18 - 17:39
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-18 - 15:01
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-17 - 23:49
9:30 | PIC2 on corrector circuits on DFBMA/C |
10:30 | PIC2 on corrector circuits on DFBMA/C completed |
---|---|
11:00 | Problems on RQ4.L8 solved. |
12:00 | PCC on RQ4.L8 completed |
14:30 | Problems on RQ5.L8 solved. |
15:20 | PCC on RQ5.L8 completed |
15:30 | PIC2 on D2-Q4-Q5.L8 |
18:00 | PIC2 on RD2-RQ4-RQ5.L8 completed. |
18:00 | Last test of PIC2 not passed “PIC2.10 Test hardware links” |
18:15 | Tests end |
DFBAO | ElQA continuity test |
DFBAN | ElQA continuity test |
Sub sector ML8 ready for Powering to Nominal | |
---|---|
D2-Q4-Q5.L8 | Powering to nominal up to PLI2 (<1000A) – Manually |
Corrector circuit 120A DFBMC-A | Powering to nominal –Via sequencer |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-16 - 17:38
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | ON GOING | 09-05-07 |
8h run 4-8kA | - | 24-05-07 |
Interlock tests RQD&F | - | 22-05-07 |
Powering tests RQD&F | - | 23-05-07 |
Preparation RB.A23 | ON GOING | 19-04-07 |
Interlock tests RB.A23 | - | 29-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Pic interface test | - | 16-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | ON GOING | 08-05-07 |
600A-EE interlock tests | - | 22-05-07 |
600A-EE powering tests | DONE | 08-05-07 |
8 hr run PC < 2kA | - | 24-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity test < 8KA | - | 25-05-07 |
Polarity Check > 8KA | - | 05-06-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-16 - 17:02
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-16 - 15:50
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-16 - 12:25
14:00 | PCC for Q5 |
15:00 | PIC2 for D2,Q4,Q5: Ivan and Boris from the CCC, the rest in the FCC If things go smoothly |
16:00 | Start P2N, preferably Q5, final decision around 15:00. In the sequence a quench at 1000A will be provoked (if we reach this far) |
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-15 - 18:59
9:30 | Test start on D2 – QH on. |
9:40 | Up to ~90A apparently without QPS protection – Actually It was not the case. |
15.24 | QH enabled for RD2.L8, QPS interlock problem on D2 understood. Only the displayed ref. voltage was a sum of the voltage picked up from the two apertures instead of a difference. At the level of protection the signal was right. |
15:34 | PCC start on D2 - up to 200A at 16:00 |
---|---|
17:30 | Loss of Cryo-Start and Cryo-Maintain due to a hardware intervention. Physical cryo conditions were stable. Signals recovered after few minutes. |
16:23 | PCC for D2 finished successfully |
17:40 | HQ of RQ4.L8 on – Reiner changed |
17:50 | Still problems on Q4 – Picked voltage exceed 20mV when PC tries to start up – QPS trips the PC. |
19:00 | Tests end |
DFBAO | ElQA continuity test |
DFBAN | ElQA continuity test |
RQ4.L8 | AT-MEL General re-check AB-PO - Special test with a 60A power converter – charatizarion |
DFBMC-A | PIC2 on the 120A corrector circuits. |
DFBMA | RQ4.L8 RD2.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 RD2.L8 |
Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 RD2.L8 |
Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 RD2.L8 |
Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 RD2.L8 |
PC configuration UP TO 100 A |
AB/PO |
DFBMC | RQ5.L8 |
Balisage with flashing lights | HCC |
RQ5.L8 | Warn the QPS team that the main circuit will be powered | HCC | |
RQ5.L8 | Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ5.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ5.L8 | PC configuration UP TO 100 A |
AB/PO |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | |
|
|
|
|
||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-15 - 16:13
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-15 - 14:28
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | ON GOING | 09-05-07 |
8h run 4-8kA | - | 24-05-07 |
Interlock tests RQD&F | - | 16-05-07 |
Powering tests RQD&F | - | 23-05-07 |
Preparation RB.A23 | ON GOING | 19-04-07 |
Interlock tests RB.A23 | - | 29-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Pic interface test | - | 16-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | ON GOING | 08-05-07 |
600A-EE interlock tests | - | 16-05-07 |
600A-EE powering tests | DONE | 08-05-07 |
8 hr run PC < 2kA | - | 24-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity test < 8KA | - | 25-05-07 |
Polarity Check > 8KA | - | 05-06-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-15 - 09:54
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-14 - 20:42
9:30 | PCC on 120A correctors of DFBMC/A |
10:30 | Deconsignation of Q5-Q4 PC |
11:00 | Problems with Q5 – Water faults – TS/CV came at 13:30 – they cleaned the filters – Problem recovered. |
14.30 | AB-PO started to tests D2 with a 60A PC connected to the magnet (circuit definition)– DC cable disconnected from PC side. |
14:42 | Logging not working. Need to disactivate and re-activate the SOC from SOC editor to restore it. Monitoring problem RCBCH5 and RCBCV5 stopped transmitting data to the monitoring system. Expects contacted. System restarted. Problem disappeared. Systected 'middleware' problem in the network - problem is known and happens once a week. |
14.50 | Create and activate new SOC named PCC_IPDQ140507 with circuits RQ4.L8 RQ5.L8 and RD2.L8. |
15.30 | Deconsignation of QH for Q5-Q4-D2 |
16.30 | PCC tests for SOC PCC_070510 finished (corrector circuits DFBMA/C) |
---|---|
16:40 | Testing communication between cryo-maintain signal and PIC, DFBMA,DFBMC |
16.45 | End of the RD2.L8 charaterization |
17.30 | RQ4.L8B1 and RQ4.L8B2 ready for PCC |
17.30 | QPS detecting voltages of around ~40-50mV from the magnet protection and trip the PC (not current leads). These trips occur immediately after attempting to ramp the power converters. Note that the QPS trip threshold was reduced from 100mV to 20mV. |
18.30 | Same problem on Q5. |
19:00 | Tests end |
DFBAO | ElQA continuity test |
DFBAN | ElQA continuity test |
DFBMA | RQ4.L8 RD2.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 RD2.L8 |
Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 RD2.L8 |
Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 RD2.L8 |
Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 RD2.L8 |
PC configuration UP TO 100 A |
AB/PO |
DFBMC | RQ5.L8 |
Balisage with flashing lights | HCC |
RQ5.L8 | Warn the QPS team that the main circuit will be powered | HCC | |
RQ5.L8 | Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ5.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ5.L8 | PC configuration UP TO 100 A |
AB/PO |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | |
|
|
|
|
||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-14 - 10:54
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-05-11 - 16:26
DFBAO | ElQA continuity test |
DFBAN | ElQA continuity test |
DFBMA | RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Balisage with flashing lights | HCC |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
PC Configuration (test of PC and magnet at minimum current) UP TO 10 A |
AB/PO |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Balisage with flashing lights | HCC |
RCBCH5.L8B1 RCBCV5.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBCH5.L8B1 RCBCV5.L8B2 |
PC Configuration (test of PC and magnet at minimum current) UP TO 10 A |
AB/PO |
DFBMA | RQ4.L8 RD2.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 RD2.L8 |
Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 RD2.L8 |
Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 RD2.L8 |
Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 RD2.L8 |
PC configuration UP TO 100 A |
AB/PO |
DFBMC | RQ5.L8 |
Balisage with flashing lights | HCC |
RQ5.L8 | Warn the QPS team that the main circuit will be powered | HCC | |
RQ5.L8 | Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ5.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ5.L8 | PC configuration UP TO 100 A |
AB/PO |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | |
|
|
|
|
||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
9:30 | Swith the Power Converters on: RPMBA.UA83.RQT12.L8B1 and RPMBA.UA83.RQT12.L8B2 Beginning of the validation of the sequencer for the procedure of Q2. Test on the communication between the PIC and the CRYO signals (CRYO start and CRYO maintain). |
10:00 | Deconsignation of the PCs of the corrector circuits of Q4 and Q5. CRYO control in the FCR is not available, except a viewer. A voltage tap in the circuit RCBYHS4.L8B2 has been detected, the problem will be investigated. |
11:30 | Waiting for solving the voltage problem. Consignation of the PCs of the circuits: RPHGA.UA83.RQ9.L8B2 RPHGA.UA83.RQ9.L8B1 RPHGA.UA83.RQ10.L8B2 RPHGA.UA83.RQ10.L8B1 in order to allow AT/MEL to install new heaters. |
14:00 | Consignation of all the circuits of the converters of the Q4 in order to allow Vincent Chareyre to check the problem of the voltage drop in the circuit RCBYHS4.L8B2. |
15:00 | Vincent Chareyre has fixed the problem. 15:20 start with the PC configuration of the circuit RCBCH5.L8B1. |
16:00 | 16:10 CRYO-OK lost. 16:20 CRYO-OK found again. PC configuration of the circuit RCBCH5.L8B1 is ongoing. |
17:00 | Start with the PC configuration of the RCBCV5.L8B2. 17:10 CRYO-maintain forced LOST and PIC removed all the Power permits. Consequently all the PCs tripped off. 17:30 Cryo Operator reported on the situation: the CRYO OK was lost and the CRYO maintain was going to be lost, consequently they forced the CRYO-MAINTAIN as lost. |
18 :00 | Switch the Power Converters off: RPMBA.UA83.RQT12.L8B1 and RPMBA.UA83.RQT12.L8B2. |
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-05-11 - 11:27
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-05-10 - 18:50
DFBMA | RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Balisage with flashing lights | HCC |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
PC Configuration (test of PC and magnet at minimum current) UP TO 10 A |
AB/PO |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Balisage with flashing lights | HCC |
RCBCH5.L8B1 RCBCV5.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBCH5.L8B1 RCBCV5.L8B2 |
PC Configuration (test of PC and magnet at minimum current) UP TO 10 A |
AB/PO |
DFBMA | RQ4.L8 RD2.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 RD2.L8 |
Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 RD2.L8 |
Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 RD2.L8 |
Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 RD2.L8 |
PC configuration UP TO 100 A |
AB/PO |
DFBMC | RQ4.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 | Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 | Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 | PC configuration UP TO 100 A |
AB/PO |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | |
|
|
|
|
||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
09:30 | Swith on of the Power Converters: RPMBA.UA83.RQT12.L8B1 and RPMBA.UA83.RQT12.L8B2 Beginning of the validation of the sequencer for the procedure of D2. Test on the communication between the PIC and the CRYO signals (CRYO start and CRYO maintain). |
10:00 | Deconsignation of the PCs of the corrector circuits of Q4 and Q5. CRYO control in the FCR is not available, except a viewer. A voltage tap problem in the circuit RCBYHS4.L8B2 has been detected, the problem will be investigated. |
11:30 | Waiting for solving the voltage problem. Consignation of the PCs of the circuits: RPHGA.UA83.RQ9.L8B2 RPHGA.UA83.RQ9.L8B1 RPHGA.UA83.RQ10.L8B2 RPHGA.UA83.RQ10.L8B1 in order to allow AT/MEL to install new heaters. |
14:00 | Consignation of all the circuits of the converters of the Q4 in order to allow Vincent Chareyre to check the problem of the voltage drop in the circuit RCBYHS4.L8B2. |
15:00 | Vincent Chareyre has fixed the problem. 15:20 start with the PC configuration of the circuit RCBCH5.L8B1. |
16:00 | 16:10 CRYO-OK operation lost. 16:20 CRYO-OK operation found again. PC configuration of the circuit RCBCH5.L8B1 is ongoing. |
17:00 | Start with the PC configuration of the RCBCV5.L8B2. 17:10 CRYO-maintain forced LOST and PIC removed all the Power permits. Consequently all the PCs tripped off. 17:30 Cryo Operator reported on the situation: the CRYO OK was lost and the CRYO maintain was going to be lost, consequently they forced the CRYO-MAINTAIN as lost. |
18 :00 | Switch off of the Power Converters: RPMBA.UA83.RQT12.L8B1 and RPMBA.UA83.RQT12.L8B2. |
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-05-10 - 18:26
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-05-10 - 08:37
DFBMA | RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Balisage with flashing lights | HCC |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
PC Configuration (test of PC and magnet at minimum current) UP TO 10 A |
AB/PO |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Balisage with flashing lights | HCC |
RCBCH5.L8B1 RCBCV5.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBCH5.L8B1 RCBCV5.L8B2 |
PC Configuration (test of PC and magnet at minimum current) UP TO 10 A |
AB/PO |
DFBMA | RQ4.L8 RD2.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 RD2.L8 |
Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 RD2.L8 |
Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 RD2.L8 |
Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 RD2.L8 |
PC configuration UP TO 100 A |
AB/PO |
DFBMC | RQ4.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 | Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 | Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 | PC configuration UP TO 100 A |
AB/PO |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | |
|
|
|
|
||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
DFBAO | RQ6.L8B1 RQ6.L8B2 |
Balisage around the chimneys | HCC |
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. Check of the short-circuit and the insulation. | AB/PO |
||
Sequencer tests on powering procedures for 6kA magnets with two power converters ("Q4Q5" procedure) | AB/CO |
||
Lock and switch off the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters | AB/PO |
DFBAO | RQ6.L8B1 RQ6.L8B2 |
Balisage around the chimneys | HCC |
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. Check of the short-circuit and the insulation. | AB/PO |
||
Sequencer tests on powering procedures for 6kA magnets with two power converters ("Q4Q5" procedure) | AB/CO |
||
Lock and switch off the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters | AB/PO |
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-09 - 10:48
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-05-08 - 17:36
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-07 - 22:54
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-07 - 22:44
Position | T [°C] | T_meteo [°C] | RH_meteo [%] | T_portable [°C] | RH_portable [%] | Condensation | Dew Point [°C] | Time |
---|---|---|---|---|---|---|---|---|
DFBMC | 20.6 | 48.0 | 20.4 | 50.8 | 20.45 | |||
Q6_L8 (120A) | 9 | 19.4 | 52.2 | Yes | 9.3 | |||
Q8_L8 (120A) | 9 | 19.4 | 53.1 | Yes | 9.7 | 19.45 | ||
Q9_L8 (120A) | 9.5 | 19.5 | 52.7 | Yes | 9.5 | |||
Q10_L8 (120A) | 9 | 19.0 | 53.7 | Yes | 9.4 | |||
Q11_L8 (60A) | 9.5 | 19.0 | 53.9 | Yes | 9.4 | |||
Q12_L8 (60A) | 9.5 | 18.6 | 51.4 | 18.3 | 55.5 | Low | 9.2 | 20.00 |
Q13_L8 (60A) | 10 | 18.5 | 55.0 | Yes | 9.3 | |||
Q14_L8 (60A) | 9.5 | 18.4 | 55.4 | Yes | 9.3 | |||
Q15_L8 (60A) | 8.5 | 18.2 | 56.0 | Yes | 9.2 | 20.15 |
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-05-07 - 19:34
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-05-07 - 19:12
DFBAO | RQ6.L8B1 RQ6.L8B2 |
Switch on the flashing lights around the chimneys of RQ6.L8 circuit in the DFBAO | HCC |
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. | AB/PO |
||
Sequencer tests on powering procedures for 6kA magnets with 2 PCs ("Q4Q5" procedure) | AB/CO |
DFBMA | RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 RQ4.L8B1 |
Balisage with flashing lights | HCC |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 |
PC Configuration (test of PC and magnet at minimum current) | AB/PO | |
RQ4.L8 | Warn the QPS team that RQ4 will be powered | HCC | |
RQ4.L8 | Unlock the quench heaters power supplies of Q5 and charge | AT/MEL | |
RQ4.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 | PC configuration | AB/PO | |
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 RQ4.L8B1 |
PIC2 | HCC AB/CO AB/PO AT/MEL AT/ACR |
|
RCBYVS4.L8B1 RCBYVS4.L8B2 RCBYHS4.L8B1 RCBYHS4.L8B2 RCBYV4.L8B1 RCBYH4.L8B2 RQ4.L8B1 |
P2N (Up to PL1.31B) |
HCC AB/CO AB/PO AT/MEL AT/ACR |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 RQ5.L8 |
Balisage with flashing lights | HCC |
RCBCH5.L8B1 RCBCV5.L8B2 |
Unlock and switch on the corresponding power converters | AB/PO | |
RCBCH5.L8B1 RCBCV5.L8B2 |
PC Configuration (test of PC and magnet at minimum current) | AB/PO | |
RQ5.L8 | Warn the QPS team that RQ5 will be powered | HCC | |
RQ5.L8 | Unlock the quench heaters power supplies of Q5 and charge | AT/MEL | |
RQ5.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ5.L8 | PC configuration | AB/PO | |
RCBCH5.L8B1 RCBCV5.L8B2 RQ5.L8 |
PIC2 | HCC AB/CO AB/PO AT/MEL AT/ACR |
|
RCBCH5.L8B1 RCBCV5.L8B2 RQ5.L8 |
P2N (Up to PL1.31B) |
HCC AB/CO AB/PO AT/MEL AT/ACR |
PC_Config | PNO.1 | PNO.2 | PNO.3 | ||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | PIC2 | PNO.1 | PNO.2 | PNO.3 | PNO.4 | ||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
DFBAO | RQ6.L8B1 RQ6.L8B2 |
Balisage around the chimneys | HCC |
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. Check of the short-circuit and the insulation. | AB/PO |
||
Sequencer tests on powering procedures for 6kA magnets with two power converters ("Q4Q5" procedure) | AB/CO |
||
Lock and switch off the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters | AB/PO |
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-07 - 18:54
EE - IST | ||
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | - | 11-05-07 |
8h run 4-8kA | - | 29-05-07 |
Interlock tests RQD&F | - | 02-05-07 |
Powering tests RQD&F | - | 24-05-07 |
Preparation RB.A23 | ON GOING | 19-04-07 |
Interlock tests RB.A23 | - | 29-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Circuits < 2kA | ||
120A powering tests | DONE | 03-05-07 |
600ANOEE powering tests | ON GOING | 08-05-07 |
600A-EE interlock tests | ON GOING | 03-05-07 |
600A-EE powering tests | ON GOING | 18-05-07 |
8 hr run PC < 2kA | - | 29-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity Check < 8KA | - | 30-05-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.MatteoSolfaroli on 2007-05-07 - 18:38
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-04 - 23:08
Position | T [°C] | T_meteo [°C] | RH_meteo [%] | T_portable [°C] | RH_portable [%] | Condensation | Dew Point [°C] | Air Speed [m/s] | Time |
---|---|---|---|---|---|---|---|---|---|
DFBMC | 20.4 | 48.1 | 0.3-0.8 | 17.30 | |||||
20.4 | 48.3 | 20.1 | 51.1 | 19.30 | |||||
Q6_L8 (120A) | 8.5 | 19.7 | 53.1 | Low | 9.9 | ||||
Q8_L8 (120A) | 9 | 19.8 | 53.2 | Low | 10.0 | ||||
Q9_L8 (120A) | 10 | 19.3 | 54.4 | No | 10.0 | 1.1-1.4 | |||
Q10_L8 (120A) | 9 | 19.0 | 54.2 | Low | 9.5 | 18.50 | |||
Q11_L8 (60A) | 9 | 19.0 | 54.6 | No | 9.5 | ||||
Q12_L8 (60A) | 9 | 18.5 | 52 | 18.6 | 54.5 | Yes | 9.2 | 1.0-1.3 | |
Q13_L8 (60A) | 10 | 18.4 | 55.2 | No | 9.2 | ||||
Q14_L8 (60A) | 9 | 18.5 | 55.1 | Yes | 9.3 | ||||
Q15_L8 (60A) | 8.5 | 18.2 | 55.9 | Yes | 9.2 | 19.15 |
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-04 - 19:27
EE - IST | ||
13kA EE | DONE | 16-04-07 |
600A EE | DONE | 23-04-07 |
Circuits >2kA | ||
Powering tests PC 4-8kA | - | 11-05-07 |
8h run 4-8kA | - | 29-05-07 |
Interlock tests RQD&F | - | 02-05-07 |
Powering tests RQD&F | - | 24-05-07 |
Preparation RB.A23 | ON GOING | 19-04-07 |
Interlock tests RB.A23 | - | 29-05-07 |
Powering tests RB.A23 | - | 30-05-07 |
8h run >= 8kA | - | 04-06-07 |
Circuits < 2kA | ||
120A powering tests | ON GOING | 03-05-07 |
600ANOEE powering tests | - | 08-05-07 |
600A-EE interlock tests | ON GOING | 03-05-07 |
600A-EE powering tests | - | 18-05-07 |
8 hr run PC < 2kA | - | 29-05-07 |
24hr heat run test | - | 07-06-07 |
Polarity Check < 8KA | - | 30-05-07 |
AUG- UPS test | - | 08-06-07 |
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-05-04 - 18:55
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-05-04 - 18:35
DFBAO | RQ6.L8B1 RQ6.L8B2 |
Switch on the flashing lights around the chimneys of RQ6.L8 circuit in the DFBAO | HCC |
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. | AB/PO |
||
Sequencer tests on powering procedures for 6kA magnets with 2 PCs ("Q4Q5" procedure) | AB/CO |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Balisage with flashing lights | HCC |
PC Configuration (test of PC and magnet at minimum current) | AB/PO | ||
RQ5.L8 | Unlock of the quench heater power supplies (DQHDS) of Q5 and charge. | AT/MEL | |
PC Configuration | AB/PO | ||
RCBCH5.L8B1 RCBCV5.L8B2 RQ5.L8 |
PIC2 | HCC AB/CO AB/PO AT/MEL AT/ACR |
|
P2N | HCC AB/CO AB/PO AT/MEL AT/ACR |
PC_Config | PNO.1 | PNO.2 | PNO.3 | ||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | PIC2 | PNO.1 | PNO.2 | PNO.3 | PNO.4 | ||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Connection of the DC cables to the power converters for these circuits (before 9:00) | AB/PO |
Verification of the connections at the DFBMC side | AT/MEL | ||
DFBAO | RQ6.L8B1 RQ6.L8B2 |
Switch on the flashing lights around the chimneys of RQ6.L8 circuit in the DFBAO | HCC |
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. | AB/PO |
||
Sequencer tests on powering procedures for 6kA magnets with 2 PCs ("Q4Q5" procedure) | AB/CO |
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-05-04 - 16:35
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2007-05-04 - 16:03
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-03 - 23:46
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-03 - 22:55
Position | T [°C]![]() |
T_meteo [°C] | RH_meteo [%] | Condensation | Comments |
---|---|---|---|---|---|
Q10_L8 (60A) | 10 | Yes | |||
Q13_L8 (60A) | 10 | No | |||
Q25_L8 (60A) | 10 | No | |||
Q30_L8 (60A) | 10 | No | |||
Q20_R7 (60A) | 10 | No | |||
Q25_R7 (60A) | 10.5 | No | |||
Q9_L8 (60A) | 13 | No | |||
Q7_R7 (60A) | 7 | Yes | |||
Q6_L8 (120A) | 9 | Yes | |||
Q12_L8 (60A) | 9 | 18.5 | 41.4 | Yes | |
Q14_L8 (60A) | 9 | No | |||
Q15_L8 (60A) | 9 | Yes | |||
Q20_L8 (60A) | 9 | No | |||
Q15_R7 (60A) | 9 | Yes | |||
Q14_R7 (60A) | 9 | Yes | |||
Q11_R7 (60A) | 9 | Yes | |||
Q10_R7 (60A) | 9 | Yes | |||
Q8_R7 (60A) | 9 | Yes | |||
Q8_L8 (60A) | 9.5 | No | |||
Q11_L8 (60A) | 9.5 | No | |||
Q30_R7 (60A) | 9.5 | Yes | |||
Q13_R7 (60A) | 9.5 | Yes | |||
Q12_R7 (60A) | 9.5 | 17.3 | 49 | Yes | |
Q9_R7 (60A) | 9.5 | Yes | |||
DFBMC | 20.7 | 38.8 | |||
DFBAN | 18 | 45.9 |
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-03 - 18:03
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Connection of the DC cables to the power converters for these circuits (before 9:00) | AB/PO |
Verification of the connections at the DFBMC side | AT/MEL | ||
DFBAO | RQ6.L8B1 RQ6.L8B2 |
Switch on the flashing lights around the chimneys of RQ6.L8 circuit in the DFBAO | HCC |
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. | AB/PO |
||
Sequencer tests on powering procedures for 6kA magnets with 2 PCs ("Q4Q5" procedure) | AB/CO |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Balisage with flashing lights | HCC |
PC Configuration (test of PC and magnet at minimum current) | AB/PO | ||
RQ5.L8 | Unlock of the quench heater power supplies (DQHDS) of Q5 and charge. | AT/MEL | |
PC Configuration | AB/PO | ||
RCBCH5.L8B1 RCBCV5.L8B2 RQ5.L8 |
PIC2 | HCC AB/CO AB/PO AT/MEL AT/ACR |
|
P2N | HCC AB/CO AB/PO AT/MEL AT/ACR |
DFBMC | RCBCH5.L8B1 RCBCV5.L8B2 |
Connection of the DC cables to the DFBMC leads of the two 120A circuits which passed the ElQA tests | AT/MEL |
DFBAO | RQ6.L8B1 RQ6.L8B2 |
Balisage around the chimneys | HCC |
Unlock and switch on the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters. Check of the short-circuit and the insulation. | AB/PO |
||
Sequencer tests on powering procedures for 6kA magnets with two power converters ("Q4Q5" procedure) | AB/CO |
||
Lock and switch off the RPHGB.UA83.RQ6.L8B1 and RPHGB.UA83.RQ6.L8B2 converters | AB/PO |
|
Unlock and switch on the RPLB.UA83.RCBCVS5.L8B1 converter for sequencer Tests 80-120 A | AB/PO | |
|
Sequencer tests 80-120A AB/CO | AB/CO |
DFBAO | Installation of dry-air bags on the DFBMA chimneys | AT/ACR |
DFBMC | Installation of two heaters in two 120 A chimneys and of the air blowers for the 6kA leads | AT/ACR |
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-03 - 13:41
Edit, attach file or add comment
Created by Main.MikeKoratzinos on 2007-05-03 - 12:59
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-03 - 12:52
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-03 - 02:01
Position | T [°C] | T_meteo [°C] | RH_meteo [%] | Condensation | Comments |
---|---|---|---|---|---|
DFBMA | |||||
120A-4 | 14 | No | Setpoint 40K - additional heaters | ||
120A-8 | 13 | No | Setpoint 50K - additional heaters | ||
6kA | 8 (on top of G11) | Yes | No condensation on chimneys - Setpoint 50K | ||
DFBMC | 20.5 | 44.2 | |||
6kA | 8 (on G11) | No | Setpoint 70K | ||
120A-8 | 11 | No | Setpoint 50K - additional heaters not working | ||
120A-4 | 11 | No | Setpoint 40K - additional heaters not working | ||
DFBAO_LCM | |||||
Q6_L8 (120A) | 8 | Yes | |||
DFBAO_HCM | |||||
Q9_L8 (60A) | 12 | No | |||
Q10_L8 (60A) | 11 | No | |||
Q11_L8 (60A) | 10 | No | |||
Q12_L8 (60A) | 9 | 18.3 | 49.5 | Yes | |
Q13_L8 (60A) | 11 | No | |||
Q14_L8 (60A) | 9 | Yes | |||
Q15_L8 (60A) | 10 | Yes | |||
Q20_L8 (60A) | 9 | Yes | |||
Q25_L8 (60A) | 11 | Yes | |||
Q30_L8 (60A) | 11 | Yes | |||
Q30_R7 (60A) | 10 | - | |||
Q25_R7 (60A) | 11 | - | |||
Q20_R7 (60A) | 10 | No | |||
Q15_R7 (60A) | 9 | Yes | |||
Q14_R7 (60A) | 9 | Yes | |||
Q13_R7 (60A) | 15? | No | |||
Q12_R7 (60A) | 10 | 17.3 | 53.4 | Yes | |
Q11_R7 (60A) | 9 | Yes | |||
Q10_R7 (60A) | 9 | Yes | |||
Q9_R7 (60A) | 10 | No | |||
Q8_R7 (60A) | 9 | Yes | |||
Q7_R7 (60A) | 9 | Yes | |||
DFBAN | 18 | 49.9 | Yes | ||
600A | 10 | Yes | Setpoint 150K | ||
13kA | 10 | Yes | Setpoint 110K | ||
DFBMH | No | ||||
600A | 11 | No | Setpoint 120K |