Created by Main.RosarioPrincipe on 2006-10-31 - 16:58
Please find enclose the minutes of our last RAT meeting, held this morning in SX6.
Main issue: the 24-h heat run scheduled from Wed 01.11 to Thu 02.11.
Regards

RAT_20061031.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x31x16x55/RAT_20061031.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-30 - 17:06

RAT_061030.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2006x10x30x17x05/RAT_061030.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-27 - 15:06

RAT_061027.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2006x10x27x14x28/RAT_061027.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-25 - 18:35

RAT_061025.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x25x18x32/RAT_061025.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-24 - 13:10

RAT_061024.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint0x2006x10x24x13x10/RAT_061024.pdf
Comments:
Edit, attach file or add comment
Created by Main.BlancaPereaSolano on 2006-10-23 - 18:45
The final Access system is being installed in P8. We could see the personnel and material SAS in the UA (Angels and Demons' eye recognition !!). The bake-out of the kickers in LSS8R is taking place, and should be at nominal temperature by wednesday ! The TDI is still not in place, though. We show here also the new vacuum valves.

Kickers-Bake-Out2-P8.JPG:
Kickers being baked-out

SAS-Eye.JPG:
SAS in UA87

VacuumValves-P8.JPG:
Vacuum Valve
Comments:
Edit, attach file or add comment
Created by Main.BlancaPereaSolano on 2006-10-23 - 18:18
During the visit today to P6, we took a look at the Beam Dumping System (some collimator, kickers and the TDE line and dump) and the situation in UA63, where we found Giges sorting out the problem with the filters and the Elettas !

TDE-DumpLine-P6.JPG:
TDE line tunnel

Collimators2-P6.JPG:
Beam Dumping System Collimators

TDE-P6.JPG:
TDE

Giges-ElettasRegulation-P6.JPG:
Giges fine-tuning of the Elettas in UA63

Kickers-P6.JPG:
Beam Dumping System Kickers
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-23 - 17:41

RAT_061023_2.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint0x2006x10x23x17x38/RAT_061023_2.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-20 - 10:07
Enclose you can find the minutes of our last RAT meeting held in point 6 on Thursday OCt 19.
Main issue: new schedule for the 8-h and 24-h heat runs.
Regards

RAT_20061019.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x20x10x04/RAT_20061019.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-18 - 16:34
Please find enclose the minutes of the last RAT meeting held in point 6 on Tuesday Oct 17.

RAT_20061017.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x18x16x32/RAT_20061017.pdf
Comments:
Edit, attach file or add comment
Created by Main.UnknownUser on 2006-10-16 - 10:58
Friday 13th October I visited the Long Straight Section in P8 up to the TI8 injection line. Here I post some photos of the status of the installation and particularly about the bake-out preparation of the MKIs. You can see how TI8 enters at the MSI level (beautiful !!). Details about collimators, and BLM are also shown. The TDI was not down yet !

IMG_2010.JPG:
Bake-out preparation for the Kickers in the LHC ring

IMG_2008.JPG:
TI8 entering the ring at the level of MSIs

IMG_2009.JPG:
BLM

IMG_2006.JPG:
TI8 warm magnets running behind the QRL

IMG_2007.JPG:
TI8 MCIs and MQIs
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-13 - 11:32
Please find enclose the minutes of the RAT meeting held today in point 6.
NB: TSIC proposes to start the next endurance test (RR53) on Dec 04. Please comment.

RAT_20061013.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x13x11x29/RAT_20061013.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-11 - 15:35
Please find enclose your RAT minutes of the day...
Main issue: mise en tension of the PCs in UA63.
Regards

RAT_20061011.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x11x15x34/RAT_20061011.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-09 - 10:52

SCT-planning-UA63-UJ63-v0.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x09x10x51/SCT-planning-UA63-UJ63-v0.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-09 - 10:51
First RAT meeting in Point 6 this morning for the preparation of the SCT in UA63.
Enclose the minutes.
Regards

RAT_20061009.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x09x10x49/RAT_20061009.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-06 - 11:48
Enclose the minutes of our last RAT meeting in point 5.
Main subject: 13kA EE switch test.
Also includea a small status of the works in UA63.
Regards

RAT_20061006.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x06x11x46/RAT_20061006.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-06 - 11:29

DR_RAT_060906.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint0x2006x10x06x11x28/DR_RAT_060906.pdf
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-06 - 10:12
Please find Infra Red Analysis of RR53 & USC55 during 24H burnin tests at ultimate current of 2006-10-04.
https://edms.cern.ch/file/781901/1/RR53-USC55_IR-Report_2006-10-04_24H-Burnin.pdf
All raw pictures (IR or not) are located in EDMS doc:
https://edms.cern.ch/document/781901/1
IR Tunnel Tests EDMS doc should be located in a dedicated place under EDMS Tunnel installation structure to compare results if needed between locations measured. Note that UA83 is at following address:
https://edms.cern.ch/document/672600/1
.
Jeff Thomsen & Yves Thurel
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-06 - 09:32
First visit to point 6. The reason of the visit was to know the situation of the power converters, the cables in the tunnel side and in the power converter side. Also, the objetive was to make a first inspection of what we'll find in the short circuit test.

P1000018.JPG:
The air cooled cables was already prepared for the short circuit test

P1000003.JPG:
The water cooled cables still not conected to power converter

P1000004.JPG:
The water cooled cables still not conected to power converter

P1000012.JPG:
The labels of the connection between the power converter and the energy extraction system was made with one single label, the cablotheque id number

P1000020.JPG:
The air cooled cables was already prepared for the short circuit test

P1000016.JPG:
In the tunnel side, the blocks of the water cooled cables were put in all the cables, and placed in the DFB situation

P1000002.JPG:
The water cooled cables still not conected to power converter

P1000017.JPG:
Example of the identification of the water cooled cables.

P1000010.JPG:
The air cooled cables was already connected to the power converters

P1000021.JPG:
The water cooled cables of the DFBMM.4L6 was being hung up in the moment of the visit.
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-05 - 10:11
Please find enclose the minutes of the last RAT meeting in point 5.
Main subject: first results of the 24-h heat run oin RR53 and USC55.
Regards

RAT_20061004.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x05x10x09/RAT_20061004.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-04 - 15:57

DR_RAT_061004.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint0x2006x10x04x15x56/DR_RAT_061004.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-03 - 17:48
Please find enclose the last minutes of the RAT meeting concerning the 24-h heat run in RR53 and USC55.

RAT_20061003.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x03x17x46/RAT_20061003.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-03 - 10:52

DR_RAT_061003.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint0x2006x10x03x10x45/DR_RAT_061003.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-02 - 12:17

DR_RAT_061002.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint0x2006x10x02x12x11/DR_RAT_061002.pdf
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-02 - 11:23
Allo Roberto!
Le systeme de detection de defaut de terre interne au convertisseur a encore passe avec succes le TEST DE CONTROLE...
Bonne soiree
Hugues
PS: JC Guillaume est en train de traiter le pb.
Bonjour,
Suite à un défaut "Earth Fault" affiché sur le convertisseur 5kA Inner Triplet HCRPHGC__-KP000003, nous avons investigué le problème.
Il s'est avéré être un court-circuit franc entre le DC Output du convertisseur et le GND (Il n'y avait pas la tension Vearth en mode actif et un test à l'ohmmètre a indiqué 0ohm entre le DC- et le GND).
Après un rapide coup d'oeil, nous nous sommes aperçu que les vis permettant de raccorder le câble à eau sur DC-, touchaient le capot de protection des diodes de roue-libre (voir photos jointes).
Le nécessaire a été fait pour contacter les personnes responsables de ces connections et les modifications seront faites dès demain.
Bonne soirée
Amitiés
Vincent

IMGP2675.JPG:

IMGP2673.JPG:
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-02 - 11:20
And here it is the demin. water plot.
The power is very low (mean power around 200 kW), which is creating some pumping of the regulation (the reg. valve is opening and closing) as the nominal power of the circuit is 1400 kW. We are going to slow the PI to see if we get a smoother plot.

glacee_sect45_29_09_2006.jpg:
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-02 - 11:19
Please find below the plot for RR53, today at 13:21 hours. The system is working according to spec. (high speed since about 10:00 h).
Keep in mind that the nominal values requested by specification are:
Temp (mean) ground floor: 28 (+- 5) C
Temp. (mean) top floor: 30 (+- 5) C
The measured values are (at 14:04 h)
Temp. (mean) GF: 24.2 C
Temp (mean) top : 30 C (vault)
Temp mean regulation: 27.1 C
Water monitoring in UW45 is also underway and according to spec. Plot in the coming minutes.
We are at this moment discussing with J.C. Guillaume (on site) some adjustmemts to try and improve the temperature of his cables.

Outlook.jpg:
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-02 - 10:38
Please find enclose the minutes of the last RAT meeting, held in CCC this morning.
Main subject: last 8-h heat run and cables DC overheating.