Created by Main.RosarioPrincipe on 2006-10-06 - 11:48

Last RAT meeting in point 5

Enclose the minutes of our last RAT meeting in point 5.

Main subject: 13kA EE switch test.

Also includea a small status of the works in UA63.

Regards

PDF RAT_20061006.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x06x11x46/RAT_20061006.pdf

Comments:

Edit, attach file or add comment


Created by Main.AntonioVergara on 2006-10-06 - 11:29

Dry-Run RAT 06-10-06

PDF DR_RAT_060906.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint0x2006x10x06x11x28/DR_RAT_060906.pdf

Comments:

Edit, attach file or add comment


Created by Main.JacekSzkutnik on 2006-10-06 - 10:12

Cable and Power Converter Temperatures during the 24-run in RR53 & USC55

Please find Infra Red Analysis of RR53 & USC55 during 24H burnin tests at ultimate current of 2006-10-04. https://edms.cern.ch/file/781901/1/RR53-USC55_IR-Report_2006-10-04_24H-Burnin.pdf

All raw pictures (IR or not) are located in EDMS doc: https://edms.cern.ch/document/781901/1

IR Tunnel Tests EDMS doc should be located in a dedicated place under EDMS Tunnel installation structure to compare results if needed between locations measured. Note that UA83 is at following address: https://edms.cern.ch/document/672600/1.

Jeff Thomsen & Yves Thurel

Comments:

Edit, attach file or add comment


Created by Main.JacekSzkutnik on 2006-10-06 - 09:32

First visit to point 6: supervision before S/C

First visit to point 6. The reason of the visit was to know the situation of the power converters, the cables in the tunnel side and in the power converter side. Also, the objetive was to make a first inspection of what we'll find in the short circuit test.

JPEG P1000018.JPG:
P1000018.JPG
The air cooled cables was already prepared for the short circuit test
JPEG P1000003.JPG:
P1000003.JPG
The water cooled cables still not conected to power converter
JPEG P1000004.JPG:
P1000004.JPG
The water cooled cables still not conected to power converter
JPEG P1000012.JPG:
P1000012.JPG
The labels of the connection between the power converter and the energy extraction system was made with one single label, the cablotheque id number
JPEG P1000020.JPG:
P1000020.JPG
The air cooled cables was already prepared for the short circuit test
JPEG P1000016.JPG:
P1000016.JPG
In the tunnel side, the blocks of the water cooled cables were put in all the cables, and placed in the DFB situation
JPEG P1000002.JPG:
P1000002.JPG
The water cooled cables still not conected to power converter
JPEG P1000017.JPG:
P1000017.JPG
Example of the identification of the water cooled cables.
JPEG P1000010.JPG:
P1000010.JPG
The air cooled cables was already connected to the power converters
JPEG P1000021.JPG:
P1000021.JPG
The water cooled cables of the DFBMM.4L6 was being hung up in the moment of the visit.

Comments:

Edit, attach file or add comment

Warning: Can't find topic HCC.RightBaroctAll

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2006-10-02 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login