TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes


Created by Main.UnknownUser on 2006-10-16 - 10:58

Long Straight Section in P8

Friday 13th October I visited the Long Straight Section in P8 up to the TI8 injection line. Here I post some photos of the status of the installation and particularly about the bake-out preparation of the MKIs. You can see how TI8 enters at the MSI level (beautiful !!). Details about collimators, and BLM are also shown. The TDI was not down yet !

JPEG IMG_2010.JPG:
IMG_2010.JPG
Bake-out preparation for the Kickers in the LHC ring
JPEG IMG_2008.JPG:
IMG_2008.JPG
TI8 entering the ring at the level of MSIs
JPEG IMG_2009.JPG:
IMG_2009.JPG
BLM
JPEG IMG_2006.JPG:
IMG_2006.JPG
TI8 warm magnets running behind the QRL
JPEG IMG_2007.JPG:
IMG_2007.JPG
TI8 MCIs and MQIs

Comments:

Edit, attach file or add comment

Warning: Can't find topic HCC.RightBaroctAll

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2006-10-02 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login