Created by Main.IvanMoyaMartinez on 2006-12-20 - 10:57
Polarity Check done in RR57-UA56

P1000172.JPG:

P1000173.JPG:

P1000174.JPG:

P1000157.JPG:

P1000154.JPG:

P1000155.JPG:
Comments:
- Updated. Cables labeled following the ECR(EDMS 804188) -- Main.IvanMoyaMartinez - 09 Jan 2007 - 11:00
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-18 - 14:27

RAT_20061218.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x18x14x23/RAT_20061218.pdf
Comments: NEXT MEETING WILL BE HELD AT POINT 6 ON THURSDAY, 21
Open Issues for RR57/UJ56
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
- 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
- 07.12 Access key to electrical distribution room in UJ56
Open Issues for UA67/UJ67
- 18.12 ERD rack powering
- 18.12 EOD rack powering
- 18.12 Connection of cable extremities on DQS
- 18.12 HV test with circulating water
- 18.12 Water-cooled cables supports
- 18.12 PC powering
- 18.12 Water circulation
- 18.12 Elettas calibration
- 18.12 Ventilation station
- 18.12 CYNET01 and CYNET02 powering
- 18.12 WorldFip cabling for PO
- 18.12 Cooling station test by Roese
- 18.12 Electrical protection IP2 on LEMs
- 18.12 Cleaning of the areas
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-12 - 15:21

RAT_20061212.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x12x15x08/RAT_20061212.pdf

UJ56-RR57_IR-Report_2006-12-12_24H-Burnin.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x12x15x08/UJ56-RR57_IR-Report_2006-12-12_24H-Burnin.pdf
Comments: NEXT MEETING WILL BE HELD ON DEC,18 AT POINT 5
Please, find also included the IR analysis rapport, kindly provided by Jeff Thomsen.
Open Issues
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
- 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
- 07.12 Access key to electrical distribution room in UJ56
Heat Runs and Test Schedule
- 01.12 Squeeze test DONE (all the power converters involved have been tested)
- 06.12 8-h heat run DONE
- 07.12 Fire detection test DONE
- 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00 DONE
- 08.12 Afternoon: Polarity Test_1st part TO BE RE-SCHEDULED
- 11.12 10am: 24-h heat run DONE
- 13.12 9.00: UPS test and Electric cut (AUG simulation).
- 13.12 Polarity Test_2nd part TO BE RE-SCHEDULED
- 14.12 13kA energy extraction test
- 15.12 14.00: New sequencer test
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-11 - 13:18

RAT_20061211.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x11x13x11/RAT_20061211.pdf
Comments: Persons on call for assistance during the 24h heat run:
- Hardware commissioning coordination: Mirko Pojer 162482
- Power converters :
- Responsable ABPO: David Nisbet 164223
- (en cas de absence) Hugues Thiesen 164205
- Numéro général ABPO-LHC-SCT-24H: 162333
- Permanences ABPO: Journée 8h a 18 heures 11-12-2006 : Emmanuel Garde (16 4035) / Philippe Marchon Journée 18h a 20 heures 11-12-2006 : David Nisbet (164223) / Jeff Thomsen (165008) Nuit 20h 11-12-2006 a 2h00 12-12-2006 : Okbi Zenasni tel (16 3678) Nuit 2h a 8h 12-12-2006 : Cédric Caffier tel (16 4133) Journée 8h a 17 h 12-12-2006 : Emmanuel Garde (16 4035) / Philippe Marchon
- Energy extraction system: Knud Dahlerup-Petersen 163279
- DC cables: J. Kis (10h-18h), B. Lebeau (18h-00h), S. Cotte (00h-7h), J. Kis (7h-end of test) 164879
Open Issues
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
- 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
- 07.12 Access key to electrical distribution room in UJ56
Heat Runs and Test Schedule
- 01.12 Squeeze test DONE (all the power converters involved have been tested)
- 06.12 8-h heat run DONE
- 07.12 Fire detection test DONE
- 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00 DONE
- 08.12 Afternoon: Polarity Test_1st part TO BE RE-SCHEDULED
- 11.12 10am: 24-h heat run
- 13.12 UPS test and Electric cut (AUG simulation).
- 13.12 Polarity Test_2nd part TO BE RE-SCHEDULED
- 14.12 13kA energy extraction test.
- 15.12 New sequencer test
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-07 - 12:36

RAT_20061207.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x07x12x32/RAT_20061207.pdf
Comments: Next meeting in CCC on Monday Dec,11.
Open Issues
- 22.11 Fire detection – awaiting certification
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
- 06.12 Permanent labels for RQ converters in RR57 (according to ECR)
- 07.12 Cables re-distribution for 600 A
- 07.12 Access key to electrical distribution room in UJ56
Heat Runs and Test Schedule
- 07.12 Fire detection test
- 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00
- 08.12 Afternoon: Polarity Test_1st part
- 11.12 10am: 24-h heat run
- 12.12 UPS test.
- 13.12 Electric cut (AUG simulation).
- 13.12 Polarity Test_2nd part
- 14.12 13kA energy extraction test.
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-06 - 12:47

RAT_20061206.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x06x12x42/RAT_20061206.pdf
Comments: 8-H HEAT RUN ON GOING
Next meeting: Thursday, 7 at 8.30 in CCC.
Open Issues
- 22.11 Fire detection – awaiting certification
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
Heat Runs and Test Schedule
- 07.12 Fire detection test
- 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00
- 11.12 10am: 24-h heat run
- 12.12 UPS test.
- 13.12 Electric cut (AUG simulation).
- 13.12 Polarity Test
- 14.12 13kA energy extraction test.
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-05 - 12:58

RAT_20061205.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x05x12x51/RAT_20061205.pdf

RQ4-RQ10-ECR.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x05x12x51/RQ4-RQ10-ECR.ppt

RR57-UJ56-8H-24H-PC_LIST.xls:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x05x12x51/RR57-UJ56-8H-24H-PC_LIST.xls
Comments:
Please find enclosed the list of PC which will be powered during the 8h heat run and the 24h heat run. The list of steps to be implemented following the ERC (EDMS No.804188) is also included
Open Issues
- 22.11 Fire detection – awaiting certification
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)
Edit, attach file or add comment
Created by Main.MirkoPojer on 2006-12-01 - 11:49

RAT_20061201.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x01x11x42/RAT_20061201.pdf
Comments:
Next meeting oin Wednesday, Dec 6, at 8.30 in CCC
Open Issues
- 23.11 Ripples in RQT12R5B1 power converter.
- 22.11 Full power ventilation test in RR57 – Friday 8th Dec. 8:30-12:00
- 22.11 Fire detection – awaiting certification
Heat Runs and Test Schedule
- 01.12 Squeeze test
- 06.12 8-h heat run
- 07.12 Polarity Test
- 08.12 Full power ventilation tests
- 11.12 10am: 24-h heat run
- 12.12 UPS test.
- 13.12 Electric cut (AUG simulation).
- 14.12 13kA energy extraction test.
Edit, attach file or add comment