Please find enclosed the list of PC which will be powered during the 8h heat run and the 24h heat run. The list of steps to be implemented following the ERC (EDMS No.804188) is also included
Open Issues
- 22.11 Fire detection – awaiting certification
- 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)