TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Create new blog entry for Point 5


Created by Main.MirkoPojer on 2006-12-06 - 12:47

RAT for Point 5 in CCC, Dec 6

PDF RAT_20061206.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x12x06x12x42/RAT_20061206.pdf

Comments: 8-H HEAT RUN ON GOING

Next meeting: Thursday, 7 at 8.30 in CCC.

Open Issues

  • 22.11 Fire detection – awaiting certification
  • 01.12 Short cables on 13 kA EE to be changed later on (temporary solution in place)

Heat Runs and Test Schedule

  • 07.12 Fire detection test
  • 08.12 Full power ventilation tests in RR57 – from 8:30 till 12:00
  • 11.12 10am: 24-h heat run
  • 12.12 UPS test.
  • 13.12 Electric cut (AUG simulation).
  • 13.12 Polarity Test
  • 14.12 13kA energy extraction test.

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2006-12-11 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login