TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Create new blog entry for Point 6


Created by Main.MirkoPojer on 2007-02-21 - 18:18

Beam Dumping System Commissioning RAT, Feb. 20

PDF RAT_20070220.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x21x18x16/RAT_20070220.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-02-14 - 18:23

SCT - UA67 UJ67 - OPEN ISSUES

Comments: Open Issues SCT in UA67 and UJ67

  • 13.02 Report on the AUG
  • 12.02 PM generated but stacked in local
  • 12.02 Few labels missing for cables identification
  • 05.02 Little ducts between UA and RA not closed during the 24hr
  • 02.02 RSF2.A67B1 and RSF2.A67B2 PIC cables to extend
  • 02.02 NC opening on the bad connection on the 6kA racks
  • 08.01 EE fan rotation problem – all ring

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-02-12 - 17:32

SCT in UA67/UJ67 and Preparation for SCT in RR73/UJ76, Feb 12

PDF RAT_20070212.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x12x17x28/RAT_20070212.pdf

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-02-08 - 20:19

SCT in UA67/UJ67 - Feb, 8

PDF SCT-planning-RR73-UJ76_v02.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x08x20x17/SCT-planning-RR73-UJ76_v02.pdf

PDF RAT_20070208.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x08x20x17/RAT_20070208.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-02-06 - 19:38

SCT UA67-UJ67 Feb. 6th

PDF RAT_20070206.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x06x19x37/RAT_20070206.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-02-05 - 15:30

SCT UA67-UJ67 Feb. 5th

PDF RAT_20070205.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x05x15x20/RAT_20070205.pdf

  • 24h PC heat run ON GOING.

Phone numbers for operators:

Hardware commissioning coordination:

  • Boris Bellesia 162483

Power converters :

  • Responsable AB/PO: David Nisbet 164223
  • (en cas de absence) Hugues Thiesen 164205
  • Numéro général AB/PO-LHC-SCT-24H: 162333

For AB/PO – in the tunnel:

  • Journée 8:00-18:00 heures: Emmanuel Garde 164035
  • Journée 17:00 -20:00 heures: Vincent Barbet 165148
  • Nuit 20:00–02:00 heures: Halil Oruc 165193
  • Nuit 02:00-8:00 heures: Okbi Zenasni 163678

Energy extraction system:

  • Reiner Denz 165289

DC cables:

  • Journée jusqu’a 12:00 heures: D.Camus 164903
  • Journée 12:00-20:00 heures: B.Lebeau 160913
  • Nuit 20:00-02:00 heures: S.Boutte 163390
  • Nuit 02.00-08.00 heures: D.Camus 164903

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-02-02 - 21:01

SCT UA67 - UJ67, Feb. 2nd

PDF RAT_20070202.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x02x02x20x50/RAT_20070202.pdf

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2007-02-01 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login