Created by Main.BorisBellesia on 2007-01-31 - 20:38

RAT_20070131.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x31x20x37/RAT_20070131.pdf
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-30 - 12:35

RAT_20070130.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x30x12x14/RAT_20070130.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-29 - 12:45

RAT_20070129.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x29x12x44/RAT_20070129.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-26 - 18:03

RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x18x01/RAT_20070126.pdf

LSS6_v1.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x18x01/LSS6_v1.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-26 - 16:43

RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x16x41/RAT_20070126.pdf
Comments:
- At 15:00 8hr run of the 13 kA circuits have been STOPPED due to water cooling circuit.
- TS-CV intervention scheduled for Monday 29.01
- 8hr run for the 13 kA circuits foreseen for the next Tuesday (30.01) after TS-CV intervention.
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-25 - 17:05

Tests_annuels_des_AUG_LHC.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x25x16x36/Tests_annuels_des_AUG_LHC.ppt
Present :
P. Anderssen, B. Bellesia, C. Castillo Trello, G. Cumer, C. Dehavay, P. Fessia, J.P. Malod Dognin, M. Pojer, R. Saban, E. Barbero Soto, J.Toullieux, S. Weisz
* Presentation of G. Cumer (see attached file)
- The procedures adopted during an AUG have been mentioned.
- Resume of the affected Surface and Underground Areas during the AUG in Point 6.
* Friday 9 Feb. can be a possible date for a AUG in point 6:
Waiting for the “ok” of Installation (S. Weisz/ TS-IC) and Interconnections (P. Fessia/ AT-MCS)
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-25 - 16:31

RAT_20070125.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x25x16x30/RAT_20070125.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-24 - 19:21

RAT_20070124.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x24x19x21/RAT_20070124.pdf
Comments:
Edit, attach file or add comment
Created by Main.JeanPierreMalodDognin on 2007-01-19 - 16:45

IMGP9979.JPG:
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-19 - 12:24

RAT_20070119.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x19x11x25/RAT_20070119.pdf

SCT-Planning-UA67UJ67-v6.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x19x11x25/SCT-Planning-UA67UJ67-v6.pdf
Open Issues
- 17.01 Broken thermostat on 13 kA EE
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem – all ring
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
Heat Runs and Test Schedule
08.01 |
DONE |
600A and 13 kA EE system IST. |
08.01 |
DONE |
RB IST. ON GOING |
11.01 |
DONE |
120A powering tests. |
15.01 |
DONE |
2 kA powering tests. |
15.01 |
DONE |
600A powering tests. |
17.01 |
DONE |
600A-EE powering tests. |
22.01 |
- |
PIC-PC-QPS Interface tests. |
23.01 |
- |
RQD&F powering tests. |
24.01 |
- |
RB powering tests. |
26.01 |
- |
120A-600A-2kA-RQD/F-RB 8h heat run. |
05.02 |
- |
24h heat run test. |
07.02 |
- |
Polarity test. |
14.02 |
- |
AUG&UPS test. |
- Main.MirkoPojer - 19 Jan 2007 - 11:28
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-17 - 11:24

RAT_20070117.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x17x11x19/RAT_20070117.pdf
Open Issues
- 17.01 Broken thermostat on 13 kA EE
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem – all ring
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule
08.01 |
ON GOING |
600A and 13 kA EE system IST |
08.01 |
ON GOING |
RB IST |
11.01 |
DONE |
120A powering tests. |
15.01 |
DONE |
2 kA powering tests. |
17.01 |
ON GOING |
PIC-PC-QPS Interface tests. |
19.01 |
DONE |
600A powering tests. |
23.01 |
- |
600A-EE powering tests. |
26.01 |
- |
120A-600A-2kA 8h heat run. |
30.01 |
- |
RQD&F powering tests. |
02.02 |
- |
RB powering tests. |
07.02 |
- |
RQ&RB 8h heat run. |
12.02 |
- |
24h heat run test. |
14.02 |
- |
AUG&UPS test. |
14.02 |
- |
Polarity test. |
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-15 - 11:21

RAT_20070115.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x15x11x07/RAT_20070115.pdf
Open Issues:
- 15.01 Loosen bolts on RCBYH4.R6B1 and RCBYV4.R6B2 PCs.
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule:
- 08.01 600A and 13 kA EE system IST. ON GOING
- 08.01 RB IST. ON GOING
- 11.01 120A powering tests. COMPLETED
- 15.01 2 kA powering tests. ON GOING
- 17.01 PIC-PC-QPS Interface tests.
- 19.01 600A powering tests. COMPLETED
- 23.01 600A-EE powering tests.
- 26.01 120A-600A-2kA 8h heat run.
- 30.01 RQD&F powering tests.
- 02.02 RB powering tests.
- 07.02 RQ&RB 8h heat run.
- 12.02 24h heat run test.
- 14.02 AUG&UPS test.
- 14.02 Polarity test.
- Main.MirkoPojer - 15 Jan 2007 - 11:15
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-01-12 - 15:48

RAT_20070112.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x12x15x43/RAT_20070112.pdf
Open Issues:
- 12.01 Power cut in ERD-R13
- 12.01 Cleaning of filters by CV (planned for 17.01)
- 10.01 QPS racks connection
- 08.01 EE fan rotation problem to be fixed for the whole machine
- 21.12 Aluminum panel for the cables ducts/ shipping and install.
- 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule:
- 08.01 600A and 13 kA EE system IST. ON GOING
- 08.01 RB IST.
- 11.01 120A powering tests.
- 15.01 2 kA powering tests.
- 17.01 PIC-PC-QPS Interface tests.
- 19.01 600A powering tests.
- 23.01 600A-EE powering tests.
- 26.01 120A-600A-2kA 8h heat run.
- 30.01 RQD&F powering tests.
- 02.02 RB powering tests.
- 07.02 RQ&RB 8h heat run.
- 12.02 24h heat run test.
- 14.02 AUG&UPS test.
- 14.02 Polarity test.
-- Main.MirkoPojer - 12 Jan 2007 - 15:46
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-10 - 17:47

RAT_20070110.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x10x17x43/RAT_20070110.pdf
Comments:
Edit, attach file or add comment
Created by Main.BorisBellesia on 2007-01-08 - 18:46

RAT_20070108.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x08x18x45/RAT_20070108.pdf
Comments:
Edit, attach file or add comment