SCT UA 67 - UJ 67, Jan. 31st.

PDF RAT_20070131.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x31x20x37/RAT_20070131.pdf

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-30 - 12:35

SCT_UA 67- UJ 67, Jan. 30th 2006

PDF RAT_20070130.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x30x12x14/RAT_20070130.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-29 - 12:45

SCT_UA 67- UJ 67, Jan. 29th 2006

PDF RAT_20070129.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x29x12x44/RAT_20070129.pdf

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-01-26 - 18:03

Beam Dumping System_RAT - January, 26

PDF RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x18x01/RAT_20070126.pdf

PDF LSS6_v1.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x18x01/LSS6_v1.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-26 - 16:43

SCT_UA 67- UJ 67, Jan. 26th 2006

PDF RAT_20070126.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x26x16x41/RAT_20070126.pdf

Comments:

  • At 15:00 8hr run of the 13 kA circuits have been STOPPED due to water cooling circuit.
  • TS-CV intervention scheduled for Monday 29.01
  • 8hr run for the 13 kA circuits foreseen for the next Tuesday (30.01) after TS-CV intervention.

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-25 - 17:05

AUG scheduling meeting

PowerPoint Tests_annuels_des_AUG_LHC.ppt:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x25x16x36/Tests_annuels_des_AUG_LHC.ppt

Present :

P. Anderssen, B. Bellesia, C. Castillo Trello, G. Cumer, C. Dehavay, P. Fessia, J.P. Malod Dognin, M. Pojer, R. Saban, E. Barbero Soto, J.Toullieux, S. Weisz


* Presentation of G. Cumer (see attached file) - The procedures adopted during an AUG have been mentioned. - Resume of the affected Surface and Underground Areas during the AUG in Point 6.

* Friday 9 Feb. can be a possible date for a AUG in point 6: Waiting for the “ok” of Installation (S. Weisz/ TS-IC) and Interconnections (P. Fessia/ AT-MCS)

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-25 - 16:31

SCT_UA 67- UJ 67, Jan. 25th 2006

PDF RAT_20070125.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x25x16x30/RAT_20070125.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-24 - 19:21

SCT_UA 67- UJ 67, Jan. 24th 2006

PDF RAT_20070124.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x24x19x21/RAT_20070124.pdf

Comments:

Edit, attach file or add comment


Created by Main.JeanPierreMalodDognin on 2007-01-19 - 16:45

Choses vues avant les tests...

JPEG IMGP9979.JPG:
IMGP9979.JPG

Comments:

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-01-19 - 12:24

RAT for SCT in UA67/UJ67 - Jan, 19

PDF RAT_20070119.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x19x11x25/RAT_20070119.pdf

PDF SCT-Planning-UA67UJ67-v6.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x19x11x25/SCT-Planning-UA67UJ67-v6.pdf

Open Issues

  • 17.01 Broken thermostat on 13 kA EE
  • 10.01 QPS racks connection
  • 08.01 EE fan rotation problem – all ring
  • 21.12 Aluminum panel for the cables ducts/ shipping and install.

Heat Runs and Test Schedule

08.01 DONE 600A and 13 kA EE system IST.
08.01 DONE RB IST. ON GOING
11.01 DONE 120A powering tests.
15.01 DONE 2 kA powering tests.
15.01 DONE 600A powering tests.
17.01 DONE 600A-EE powering tests.
22.01 - PIC-PC-QPS Interface tests.
23.01 - RQD&F powering tests.
24.01 - RB powering tests.
26.01 - 120A-600A-2kA-RQD/F-RB 8h heat run.
05.02 - 24h heat run test.
07.02 - Polarity test.
14.02 - AUG&UPS test.
- Main.MirkoPojer - 19 Jan 2007 - 11:28

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-17 - 11:24

SCT_UA 67- UJ 67, Jan. 17th 2007

PDF RAT_20070117.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x17x11x19/RAT_20070117.pdf

Open Issues

  • 17.01 Broken thermostat on 13 kA EE
  • 12.01 Power cut in ERD-R13
  • 12.01 Cleaning of filters by CV (planned for 17.01)
  • 10.01 QPS racks connection
  • 08.01 EE fan rotation problem – all ring
  • 21.12 Aluminum panel for the cables ducts/ shipping and install.
  • 21.12 HV Insulation test of the DQS poles

Heat Runs and Test Schedule

08.01 ON GOING 600A and 13 kA EE system IST
08.01 ON GOING RB IST
11.01 DONE 120A powering tests.
15.01 DONE 2 kA powering tests.
17.01 ON GOING PIC-PC-QPS Interface tests.
19.01 DONE 600A powering tests.
23.01 - 600A-EE powering tests.
26.01 - 120A-600A-2kA 8h heat run.
30.01 - RQD&F powering tests.
02.02 - RB powering tests.
07.02 - RQ&RB 8h heat run.
12.02 - 24h heat run test.
14.02 - AUG&UPS test.
14.02 - Polarity test.

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-01-15 - 11:21

RAT for SCT in UA67/UJ67 - Jan, 15

PDF RAT_20070115.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x15x11x07/RAT_20070115.pdf

Open Issues:

  • 15.01 Loosen bolts on RCBYH4.R6B1 and RCBYV4.R6B2 PCs.
  • 12.01 Power cut in ERD-R13
  • 12.01 Cleaning of filters by CV (planned for 17.01)
  • 10.01 QPS racks connection
  • 21.12 Aluminum panel for the cables ducts/ shipping and install.
  • 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule:
  • 08.01 600A and 13 kA EE system IST. ON GOING
  • 08.01 RB IST. ON GOING
  • 11.01 120A powering tests. COMPLETED
  • 15.01 2 kA powering tests. ON GOING
  • 17.01 PIC-PC-QPS Interface tests.
  • 19.01 600A powering tests. COMPLETED
  • 23.01 600A-EE powering tests.
  • 26.01 120A-600A-2kA 8h heat run.
  • 30.01 RQD&F powering tests.
  • 02.02 RB powering tests.
  • 07.02 RQ&RB 8h heat run.
  • 12.02 24h heat run test.
  • 14.02 AUG&UPS test.
  • 14.02 Polarity test.

- Main.MirkoPojer - 15 Jan 2007 - 11:15

Edit, attach file or add comment


Created by Main.MirkoPojer on 2007-01-12 - 15:48

RAT for SCT in UA67/UJ67 - Jan, 12

PDF RAT_20070112.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x12x15x43/RAT_20070112.pdf

Open Issues:

  • 12.01 Power cut in ERD-R13
  • 12.01 Cleaning of filters by CV (planned for 17.01)
  • 10.01 QPS racks connection
  • 08.01 EE fan rotation problem to be fixed for the whole machine
  • 21.12 Aluminum panel for the cables ducts/ shipping and install.
  • 21.12 HV Insulation test of the DQS poles
Heat Runs and Test Schedule:
  • 08.01 600A and 13 kA EE system IST. ON GOING
  • 08.01 RB IST.
  • 11.01 120A powering tests.
  • 15.01 2 kA powering tests.
  • 17.01 PIC-PC-QPS Interface tests.
  • 19.01 600A powering tests.
  • 23.01 600A-EE powering tests.
  • 26.01 120A-600A-2kA 8h heat run.
  • 30.01 RQD&F powering tests.
  • 02.02 RB powering tests.
  • 07.02 RQ&RB 8h heat run.
  • 12.02 24h heat run test.
  • 14.02 AUG&UPS test.
  • 14.02 Polarity test.

-- Main.MirkoPojer - 12 Jan 2007 - 15:46

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-10 - 17:47

SCT_UA 67- UJ 67, Jan. 10th 2007

PDF RAT_20070110.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x10x17x43/RAT_20070110.pdf

Comments:

Edit, attach file or add comment


Created by Main.BorisBellesia on 2007-01-08 - 18:46

SCT_UA 67- UJ 67, Jan. 8th 2007

PDF RAT_20070108.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2007x01x08x18x45/RAT_20070108.pdf

Comments:

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2007-01-08 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login