Test Report of Monday 25.06.2007
- RB.A78
- Provisional correction of the detection threshold of the bus-bar quench detector.
- TF measurement - Test OK after some corrections done in one QPS crate
- RB converter connected to the circuit
- Circuit ramped up to 350A with the bus-bar quench detection threshold increased. Loop properly closed!
- Some modifications needed in the QPS bus-bar quench detector - Circuit ramped up again to 350A with QPS in operational conditions!!
- PCC Circuit Config - TEST OK!
- RQF.A78 (6500A)
- PLI3.2 - Energy extraction discharge - Test OK
- PLI3.3 - Quench heater discharge on 12L8 SSS - Test OK
- 600A Correctors
- PCS tests on the circuits: RQT12.L8B1, RQS.L8B1, RCO.A78B1 - Going on
- DFBMA refilled and cooled down in a couple of hours
- 60A Closed Orbit Correctors: PCC in 16 converters
Test Plan for Tuesday 26.06.2007
- RB.A78
- PIC2
- PLI1 (760A)
- PLI1.1 - Current cycle
- PLI1.2 - Energy extraction discharge (quench to a current lead)
- PLI1.3 - Powering Failure from PC
- PLI1.4 - FPA from PIC
- PLI1.5 - Quench heater discharge on LBBRG.10L8 (magnet 1030)
- PLI2 (2000A)
- PLI2.1 - Current cycle
- PLI2.2 - Energy extraction discharge (quench to a current lead)
- PLI2.2b - SPA from PIC
- PLI2.3 - Quench heater discharge on LBBRA.13L8 (magnet 3002) and LBARA.13R7 (magnet 1054)
- Matching Section: Powered to the same conditions of the triple quench on 31/06 once the quench detection threshold has been increased to operational values.
- 60A closed orbit correctors: PCC and P2N
- RQF.A78 or RQD.A78
- Type tests
- Quench campaign:
- RQF and RQD ramped up together to 6500A. Quench TWO quadrupoles in different cryogenic cells simmultaneously.
- RQF and RQD ramped up together to 6500A. Quench FOUR quadrupoles in different cryogenic cells simmultaneously.
- 600A correctors
- Study and debugging of the quench detectors going on.