TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Create new blog entry for Point 8


Created by Main.MatteoSolfaroli on 2007-05-11 - 16:26

Schedule for Monday 14.05.07 in sector 78

Schedule for Monday 14.05.2007 in sector 7-8

WHEN CONDITIONS FOR THE ElQA IN THE DFBAs ARE MET:

DFBAO ElQA continuity test
DFBAN ElQA continuity test

WHEN CONDITIONS FOR POWERING ARE MET (CRYO, MPP, MEL) IN THE POWERING SUBSECTOR ML8:

DFBMA RCBYVS4.L8B1
RCBYVS4.L8B2
RCBYHS4.L8B1
RCBYHS4.L8B2
RCBYV4.L8B1
RCBYH4.L8B2
Balisage with flashing lights HCC
RCBYVS4.L8B1
RCBYVS4.L8B2
RCBYHS4.L8B1
RCBYHS4.L8B2
RCBYV4.L8B1
RCBYH4.L8B2
Unlock and switch on the corresponding power converters AB/PO
RCBYVS4.L8B1
RCBYVS4.L8B2
RCBYHS4.L8B1
RCBYHS4.L8B2
RCBYV4.L8B1
RCBYH4.L8B2
PC Configuration (test of PC and magnet at minimum current)
UP TO 10 A
AB/PO

DFBMC RCBCH5.L8B1
RCBCV5.L8B2
Balisage with flashing lights HCC
RCBCH5.L8B1
RCBCV5.L8B2
Unlock and switch on the corresponding power converters AB/PO
RCBCH5.L8B1
RCBCV5.L8B2
PC Configuration (test of PC and magnet at minimum current)
UP TO 10 A
AB/PO

PC CONFIGURATION IN RQ4, RD2 AND RQ5

DFBMA RQ4.L8
RD2.L8

Balisage with flashing lights HCC
RQ4.L8
RD2.L8
Warn the QPS team that the main circuit will be powered HCC
RQ4.L8
RD2.L8
Unlock the corresponding quench heaters power supplies and charge AT/MEL
RQ4.L8
RD2.L8
Unlock and switch on the corresponding power converters AB/PO
RQ4.L8
RD2.L8
PC configuration
UP TO 100 A
AB/PO

DFBMC RQ5.L8

Balisage with flashing lights HCC
RQ5.L8 Warn the QPS team that the main circuit will be powered HCC
RQ5.L8 Unlock the corresponding quench heaters power supplies and charge AT/MEL
RQ5.L8 Unlock and switch on the corresponding power converters AB/PO
RQ5.L8 PC configuration
UP TO 100 A
AB/PO
WHEN CONDITIONS IN ARC ARE MET GO ON WITH THE PROGRAMME FOR 60A CONVERTERS (ORBIT CORRECTORS) AND 120A (Q7 TO Q10 CORRECTORS) AS WELL AS THE ELQAs IN THE DFBAs X: previous day - X : last day - O : Proposal
  PC_Config PNO.1 PNO.2 PNO.3  
RCBH11_L8B1 X X X X  
RCBV11_L8B2 X X X X  
RCBH12_L8B2 X X X O  
RCBV12_L8B1 X X X O  
RCBH13_L8B1 X X X O  
RCBV13_L8B2 X X X O  
RCBH14_L8B2 X X X O  
RCBV14_L8B1 X X X O  
RCBH15_L8B1 X X O O  
RCBV15_L8B2 X X O O  
RCBH16_L8B2 X X O O  
RCBV16_L8B1 X X O O  
RCBH17_L8B1 -       PC_Config/crowbar tests to be repeated
RCBV17_L8B2 -       PC_Config/crowbar tests to be repeated
RCBH18_L8B2 -       PC_Config/crowbar tests to be repeated
RCBV18_L8B1 -       PC_Config/crowbar tests to be repeated
RCBH23_L8B1 O        
RCBV23_L8B2 O        
RCBH24_L8B2 O        
RCBV24_L8B1 O        
RCBH25_L8B1          
RCBV25_L8B2          
RCBH27_L8B1          
RCBV27_L8B2          
RCBH28_L8B2          
RCBV28_L8B1          
RCBH29_L8B1          
RCBV29_L8B2          
RCBH31_L8B1          
RCBV31_L8B2          
RCBH32_L8B2          
RCBV32_L8B1          

  PC_Config PIC2 PNO.1 PNO.2 PNO.3 PNO.4  
RCBCH9_L8B1 -           PC_Config/crowbar tests and TFA missing
RCBCV9_L8B2 -           PC_Config/crowbar tests and TFA missing
RCBCH10_L8B2 -           PC_Config/crowbar tests and TFA missing
RCBCV10_L8B1 -           PC_Config/crowbar tests and TFA missing

Done on Thursday 10.05.2007

9:30 Swith the Power Converters on: RPMBA.UA83.RQT12.L8B1 and RPMBA.UA83.RQT12.L8B2
Beginning of the validation of the sequencer for the procedure of Q2.
Test on the communication between the PIC and the CRYO signals (CRYO start and CRYO maintain).
10:00 Deconsignation of the PCs of the corrector circuits of Q4 and Q5.
CRYO control in the FCR is not available, except a viewer.
A voltage tap in the circuit RCBYHS4.L8B2 has been detected, the problem will be investigated.
11:30 Waiting for solving the voltage problem.
Consignation of the PCs of the circuits: RPHGA.UA83.RQ9.L8B2 RPHGA.UA83.RQ9.L8B1 RPHGA.UA83.RQ10.L8B2 RPHGA.UA83.RQ10.L8B1 in order to allow AT/MEL to install new heaters.
14:00 Consignation of all the circuits of the converters of the Q4 in order to allow Vincent Chareyre to check the problem of the voltage drop in the circuit RCBYHS4.L8B2.
15:00 Vincent Chareyre has fixed the problem.
15:20 start with the PC configuration of the circuit RCBCH5.L8B1.
16:00 16:10 CRYO-OK lost.
16:20 CRYO-OK found again.
PC configuration of the circuit RCBCH5.L8B1 is ongoing.
17:00 Start with the PC configuration of the RCBCV5.L8B2.
17:10 CRYO-maintain forced LOST and PIC removed all the Power permits. Consequently all the PCs tripped off.
17:30 Cryo Operator reported on the situation: the CRYO OK was lost and the CRYO maintain was going to be lost, consequently they forced the CRYO-MAINTAIN as lost.
18 :00 Switch the Power Converters off: RPMBA.UA83.RQT12.L8B1 and RPMBA.UA83.RQT12.L8B2.

Comments:

Edit, attach file or add comment


Created by Main.MatteoSolfaroli on 2007-05-11 - 11:27

Powering Tests Sector 78 - RAT Minutes - 11/05/2007

PDF RAT_20070511_2.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x05x11x11x24/RAT_20070511_2.pdf

Comments:

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2007-05-02 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login