Created by Main.BorisBellesia on 2007-05-14 - 20:42
9:30 | PCC on 120A correctors of DFBMC/A |
10:30 | Deconsignation of Q5-Q4 PC |
11:00 | Problems with Q5 – Water faults – TS/CV came at 13:30 – they cleaned the filters – Problem recovered. |
14.30 | AB-PO started to tests D2 with a 60A PC connected to the magnet (circuit definition)– DC cable disconnected from PC side. |
14:42 | Logging not working. Need to disactivate and re-activate the SOC from SOC editor to restore it. Monitoring problem RCBCH5 and RCBCV5 stopped transmitting data to the monitoring system. Expects contacted. System restarted. Problem disappeared. Systected 'middleware' problem in the network - problem is known and happens once a week. |
14.50 | Create and activate new SOC named PCC_IPDQ140507 with circuits RQ4.L8 RQ5.L8 and RD2.L8. |
15.30 | Deconsignation of QH for Q5-Q4-D2 |
16.30 | PCC tests for SOC PCC_070510 finished (corrector circuits DFBMA/C) |
---|---|
16:40 | Testing communication between cryo-maintain signal and PIC, DFBMA,DFBMC |
16.45 | End of the RD2.L8 charaterization |
17.30 | RQ4.L8B1 and RQ4.L8B2 ready for PCC |
17.30 | QPS detecting voltages of around ~40-50mV from the magnet protection and trip the PC (not current leads). These trips occur immediately after attempting to ramp the power converters. Note that the QPS trip threshold was reduced from 100mV to 20mV. |
18.30 | Same problem on Q5. |
19:00 | Tests end |
DFBAO | ElQA continuity test |
DFBAN | ElQA continuity test |
DFBMA | RQ4.L8 RD2.L8 |
Balisage with flashing lights | HCC |
RQ4.L8 RD2.L8 |
Warn the QPS team that the main circuit will be powered | HCC | |
RQ4.L8 RD2.L8 |
Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ4.L8 RD2.L8 |
Unlock and switch on the corresponding power converters | AB/PO | |
RQ4.L8 RD2.L8 |
PC configuration UP TO 100 A |
AB/PO |
DFBMC | RQ5.L8 |
Balisage with flashing lights | HCC |
RQ5.L8 | Warn the QPS team that the main circuit will be powered | HCC | |
RQ5.L8 | Unlock the corresponding quench heaters power supplies and charge | AT/MEL | |
RQ5.L8 | Unlock and switch on the corresponding power converters | AB/PO | |
RQ5.L8 | PC configuration UP TO 100 A |
AB/PO |
PC_Config | |
|
|
||
---|---|---|---|---|---|
RCBH11_L8B1 | X | X | X | X | |
RCBV11_L8B2 | X | X | X | X | |
RCBH12_L8B2 | X | X | X | O | |
RCBV12_L8B1 | X | X | X | O | |
RCBH13_L8B1 | X | X | X | O | |
RCBV13_L8B2 | X | X | X | O | |
RCBH14_L8B2 | X | X | X | O | |
RCBV14_L8B1 | X | X | X | O | |
RCBH15_L8B1 | X | X | O | O | |
RCBV15_L8B2 | X | X | O | O | |
RCBH16_L8B2 | X | X | O | O | |
RCBV16_L8B1 | X | X | O | O | |
RCBH17_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBV17_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBH18_L8B2 | - | PC_Config/crowbar tests to be repeated | |||
RCBV18_L8B1 | - | PC_Config/crowbar tests to be repeated | |||
RCBH23_L8B1 | O | ||||
RCBV23_L8B2 | O | ||||
RCBH24_L8B2 | O | ||||
RCBV24_L8B1 | O | ||||
RCBH25_L8B1 | |||||
RCBV25_L8B2 | |||||
RCBH27_L8B1 | |||||
RCBV27_L8B2 | |||||
RCBH28_L8B2 | |||||
RCBV28_L8B1 | |||||
RCBH29_L8B1 | |||||
RCBV29_L8B2 | |||||
RCBH31_L8B1 | |||||
RCBV31_L8B2 | |||||
RCBH32_L8B2 | |||||
RCBV32_L8B1 |
PC_Config | |
|
|
|
|
||
---|---|---|---|---|---|---|---|
RCBCH9_L8B1 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV9_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCH10_L8B2 | - | PC_Config/crowbar tests and TFA missing | |||||
RCBCV10_L8B1 | - | PC_Config/crowbar tests and TFA missing |
Edit, attach file or add comment
Created by Main.MariaPazCasasLino on 2007-05-14 - 10:54