Created by Main.MatteoSolfaroli on 2007-05-29 - 18:52

RAT_20070529b.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x05x29x18x50/RAT_20070529b.pdf
Comments:
Edit, attach file or add comment
Created by Main.MirkoPojer on 2007-05-29 - 17:27
Yesterday was devoted to perform tests on RD2.L8 and RQ4.L8
-
- RD2.L8 has been successfully commissioned up to PNO.8d (Current cycle up to nominal current)
- Missing tests for RD2.L8: Fast Power Abort from PIC (PNO.9). The detection threshold needs to be modified. Possibly done while powering at unison (like PNO.9 for RQ5)
- RQ4.L8:
-
- Unbalanced cycle up to nominal (3610 A) for B1 and 2000 A for B2. While ramping B1 converter tripped. The attempt of PO expert to recover control made the quench detector trip (same problem as last week)
- Second trial of unbalanced cycle up to nominal: with B1 at nominal current and B2 ramping up to nominal, the latter quenched at 3590 A. Test failed.
Proposal for the activity of today (30/05/2007)
- Complete P2N of all the 120-80A correctors of Q4 and Q5.
- Continue P2N of RQ4.L8. Two options: * Unbalanced ramp up and quench with both apertures at nominal current (PNO.7a) or/and * Unbalanced cycle and quench with one aperture at nominal and the other at 50%.
- ElQA activities: Morning: * Full qualification of the 3 circuits selected on DFBAN * TFM on circuits powered via DFBMH * preparation for the HV qualification of the 600A circuits Afternoon * HV qualification on 600 A circuits powered via DFBAO
Comments:
Edit, attach file or add comment
Created by Main.BlancaPereaSolano on 2007-05-29 - 10:57

RAT_20070529.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint8x2007x05x29x10x56/RAT_20070529.pdf
Comments:
Edit, attach file or add comment