Created by Main.MirkoPojer on 2006-11-23 - 11:53

RAT_20061123.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x23x11x08/RAT_20061123.pdf
Comments:
Next RAT on Monday 27
Open Issues
- 20.11 Problem with water conductivity in DQS
- 13.11 DC cables high voltage test (RR57 done. Waiting UJ56)
- 13.11 Ventilation in UJ56.
- 13.11 Test de circulation ED (waiting UJ56)
- 20.11 Water conductivity in DQS – checked tomorrow (23.11)
- 22.11 DQS acousting shielding and cabling – No news
- 22.11 Full power ventilation test in RR57 – Friday 8th Dec. 8:30-12:00
- 22.11 Fire detection – awaiting certification
- 22.11 Wi-Fi damaged cable has to be repaired – no news
Edit, attach file or add comment