TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Create new blog entry for Point 5


Created by Main.MirkoPojer on 2006-11-27 - 11:34

RAT at Point 5, Nov 27

PDF RAT_20061127.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x27x11x29/RAT_20061127.pdf

Comments:

Open issues

  • 23.11 Ripples in RQT12R5B1 power converter.
  • 23.11 Cables inversion on rack RYMCA04.
  • 20.11 Problem with water conductivity in DQS: reason known, insulation test still to be performed.
  • 13.11 DC cables high voltage test (RR57 done. Waiting UJ56)
  • 13.11 Test de circulation ED (waiting UJ56)
  • 22.11 Full power ventilation test in RR57 – Friday 8th Dec. 8:30-12:00
  • 22.11 Fire detection – awaiting certification

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2006-12-11 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login