Created by Main.MirkoPojer on 2006-11-27 - 11:34

RAT_20061127.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x11x27x11x29/RAT_20061127.pdf
Comments:
Open issues
- 23.11 Ripples in RQT12R5B1 power converter.
- 23.11 Cables inversion on rack RYMCA04.
- 20.11 Problem with water conductivity in DQS: reason known, insulation test still to be performed.
- 13.11 DC cables high voltage test (RR57 done. Waiting UJ56)
- 13.11 Test de circulation ED (waiting UJ56)
- 22.11 Full power ventilation test in RR57 – Friday 8th Dec. 8:30-12:00
- 22.11 Fire detection – awaiting certification
Edit, attach file or add comment