TWiki home Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7 Point 8 Minutes

Create new blog entry for Point 5


Created by Main.RosarioPrincipe on 2006-10-06 - 11:48

Last RAT meeting in point 5

Enclose the minutes of our last RAT meeting in point 5.

Main subject: 13kA EE switch test.

Also includea a small status of the works in UA63.

Regards

PDF RAT_20061006.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint5x2006x10x06x11x46/RAT_20061006.pdf

Comments:

Edit, attach file or add comment


Created by Main.JacekSzkutnik on 2006-10-06 - 10:12

Cable and Power Converter Temperatures during the 24-run in RR53 & USC55

Please find Infra Red Analysis of RR53 & USC55 during 24H burnin tests at ultimate current of 2006-10-04. https://edms.cern.ch/file/781901/1/RR53-USC55_IR-Report_2006-10-04_24H-Burnin.pdf

All raw pictures (IR or not) are located in EDMS doc: https://edms.cern.ch/document/781901/1

IR Tunnel Tests EDMS doc should be located in a dedicated place under EDMS Tunnel installation structure to compare results if needed between locations measured. Note that UA83 is at following address: https://edms.cern.ch/document/672600/1.

Jeff Thomsen & Yves Thurel

Comments:

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2006-10-03 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login