Created by Main.RosarioPrincipe on 2006-10-31 - 16:58
Please find enclose the minutes of our last RAT meeting, held this morning in SX6.
Main issue: the 24-h heat run scheduled from Wed 01.11 to Thu 02.11.
Regards

RAT_20061031.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x31x16x55/RAT_20061031.pdf
Comments:
Edit, attach file or add comment
Created by Main.AntonioVergara on 2006-10-25 - 18:35

RAT_061025.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x25x18x32/RAT_061025.pdf
Comments:
Edit, attach file or add comment
Created by Main.BlancaPereaSolano on 2006-10-23 - 18:18
During the visit today to P6, we took a look at the Beam Dumping System (some collimator, kickers and the TDE line and dump) and the situation in UA63, where we found Giges sorting out the problem with the filters and the Elettas !

TDE-DumpLine-P6.JPG:
TDE line tunnel

Collimators2-P6.JPG:
Beam Dumping System Collimators

TDE-P6.JPG:
TDE

Giges-ElettasRegulation-P6.JPG:
Giges fine-tuning of the Elettas in UA63

Kickers-P6.JPG:
Beam Dumping System Kickers
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-20 - 10:07
Enclose you can find the minutes of our last RAT meeting held in point 6 on Thursday OCt 19.
Main issue: new schedule for the 8-h and 24-h heat runs.
Regards

RAT_20061019.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x20x10x04/RAT_20061019.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-18 - 16:34
Please find enclose the minutes of the last RAT meeting held in point 6 on Tuesday Oct 17.

RAT_20061017.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x18x16x32/RAT_20061017.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-13 - 11:32
Please find enclose the minutes of the RAT meeting held today in point 6.
NB: TSIC proposes to start the next endurance test (RR53) on Dec 04. Please comment.

RAT_20061013.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x13x11x29/RAT_20061013.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-11 - 15:35
Please find enclose your RAT minutes of the day...
Main issue: mise en tension of the PCs in UA63.
Regards

RAT_20061011.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x11x15x34/RAT_20061011.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-09 - 10:52

SCT-planning-UA63-UJ63-v0.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x09x10x51/SCT-planning-UA63-UJ63-v0.pdf
Comments:
Edit, attach file or add comment
Created by Main.RosarioPrincipe on 2006-10-09 - 10:51
First RAT meeting in Point 6 this morning for the preparation of the SCT in UA63.
Enclose the minutes.
Regards

RAT_20061009.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x09x10x49/RAT_20061009.pdf
Comments:
Edit, attach file or add comment
Created by Main.JacekSzkutnik on 2006-10-06 - 09:32
First visit to point 6. The reason of the visit was to know the situation of the power converters, the cables in the tunnel side and in the power converter side. Also, the objetive was to make a first inspection of what we'll find in the short circuit test.

P1000018.JPG:
The air cooled cables was already prepared for the short circuit test

P1000003.JPG:
The water cooled cables still not conected to power converter

P1000004.JPG:
The water cooled cables still not conected to power converter

P1000012.JPG:
The labels of the connection between the power converter and the energy extraction system was made with one single label, the cablotheque id number

P1000020.JPG:
The air cooled cables was already prepared for the short circuit test

P1000016.JPG:
In the tunnel side, the blocks of the water cooled cables were put in all the cables, and placed in the DFB situation

P1000002.JPG:
The water cooled cables still not conected to power converter

P1000017.JPG:
Example of the identification of the water cooled cables.

P1000010.JPG:
The air cooled cables was already connected to the power converters

P1000021.JPG:
The water cooled cables of the DFBMM.4L6 was being hung up in the moment of the visit.
Comments: