RAT meeting this morning in point 6

Please find enclose the minutes of our last RAT meeting, held this morning in SX6.

Main issue: the 24-h heat run scheduled from Wed 01.11 to Thu 02.11.

Regards

PDF RAT_20061031.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x31x16x55/RAT_20061031.pdf

Comments:

Edit, attach file or add comment


Created by Main.AntonioVergara on 2006-10-25 - 18:35

RAT minutes 25-10-06

PDF RAT_061025.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x25x18x32/RAT_061025.pdf

Comments:

Edit, attach file or add comment


Created by Main.BlancaPereaSolano on 2006-10-23 - 18:18

Visit to P6: LSS and UA63

During the visit today to P6, we took a look at the Beam Dumping System (some collimator, kickers and the TDE line and dump) and the situation in UA63, where we found Giges sorting out the problem with the filters and the Elettas !

JPEG TDE-DumpLine-P6.JPG:
TDE-DumpLine-P6.JPG
TDE line tunnel
JPEG Collimators2-P6.JPG:
Collimators2-P6.JPG
Beam Dumping System Collimators
JPEG TDE-P6.JPG:
TDE-P6.JPG
TDE
JPEG Giges-ElettasRegulation-P6.JPG:
Giges-ElettasRegulation-P6.JPG
Giges fine-tuning of the Elettas in UA63
JPEG Kickers-P6.JPG:
Kickers-P6.JPG
Beam Dumping System Kickers

Comments:

Edit, attach file or add comment


Created by Main.RosarioPrincipe on 2006-10-20 - 10:07

RAT minutes Oct 19

Enclose you can find the minutes of our last RAT meeting held in point 6 on Thursday OCt 19.

Main issue: new schedule for the 8-h and 24-h heat runs.

Regards

PDF RAT_20061019.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x20x10x04/RAT_20061019.pdf

Comments:

Edit, attach file or add comment


Created by Main.RosarioPrincipe on 2006-10-18 - 16:34

RAT in point 6 on Tue Oct 17

Please find enclose the minutes of the last RAT meeting held in point 6 on Tuesday Oct 17.

PDF RAT_20061017.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x18x16x32/RAT_20061017.pdf

Comments:

Edit, attach file or add comment


Created by Main.RosarioPrincipe on 2006-10-13 - 11:32

RAT for the UA63

Please find enclose the minutes of the RAT meeting held today in point 6.

NB: TSIC proposes to start the next endurance test (RR53) on Dec 04. Please comment.

PDF RAT_20061013.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x13x11x29/RAT_20061013.pdf

Comments:

Edit, attach file or add comment


Created by Main.RosarioPrincipe on 2006-10-11 - 15:35

RAT of the day: Wed Oct 11.

Please find enclose your RAT minutes of the day...

Main issue: mise en tension of the PCs in UA63.

Regards

PDF RAT_20061011.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x11x15x34/RAT_20061011.pdf

Comments:

Edit, attach file or add comment


Created by Main.RosarioPrincipe on 2006-10-09 - 10:52

Schedule of the SCT in UA63

PDF SCT-planning-UA63-UJ63-v0.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x09x10x51/SCT-planning-UA63-UJ63-v0.pdf

Comments:

Edit, attach file or add comment


Created by Main.RosarioPrincipe on 2006-10-09 - 10:51

SCT in UA63. First RAT meeting in Point 6 this morning.

First RAT meeting in Point 6 this morning for the preparation of the SCT in UA63. Enclose the minutes.

Regards

PDF RAT_20061009.pdf:
https://twiki.cern.ch/twiki/pub/HCC/BlogEntryPoint6x2006x10x09x10x49/RAT_20061009.pdf

Comments:

Edit, attach file or add comment


Created by Main.JacekSzkutnik on 2006-10-06 - 09:32

First visit to point 6: supervision before S/C

First visit to point 6. The reason of the visit was to know the situation of the power converters, the cables in the tunnel side and in the power converter side. Also, the objetive was to make a first inspection of what we'll find in the short circuit test.

JPEG P1000018.JPG:
P1000018.JPG
The air cooled cables was already prepared for the short circuit test
JPEG P1000003.JPG:
P1000003.JPG
The water cooled cables still not conected to power converter
JPEG P1000004.JPG:
P1000004.JPG
The water cooled cables still not conected to power converter
JPEG P1000012.JPG:
P1000012.JPG
The labels of the connection between the power converter and the energy extraction system was made with one single label, the cablotheque id number
JPEG P1000020.JPG:
P1000020.JPG
The air cooled cables was already prepared for the short circuit test
JPEG P1000016.JPG:
P1000016.JPG
In the tunnel side, the blocks of the water cooled cables were put in all the cables, and placed in the DFB situation
JPEG P1000002.JPG:
P1000002.JPG
The water cooled cables still not conected to power converter
JPEG P1000017.JPG:
P1000017.JPG
Example of the identification of the water cooled cables.
JPEG P1000010.JPG:
P1000010.JPG
The air cooled cables was already connected to the power converters
JPEG P1000021.JPG:
P1000021.JPG
The water cooled cables of the DFBMM.4L6 was being hung up in the moment of the visit.

Comments:

Edit, attach file or add comment

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2006-10-03 - JacekSzkutnik
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    HCC All webs login