28 jun 2006 (14:57) : Testbed un-upgradable cause of the package : glite-CE (the content has change not the version) so all nodes upgrade between 27 jun 2006 (14:23) to 28 jun 2006 (14:17) when the BUG #17817 was present are not upgradable because the version of the meta pkg has not been change but the content. Apt or yum cannot handle that.
28 jun 2006 (14:17) : Repository ready. Reinstall and upgrade start.
28 jun 2006 (11:36) : Solution provide by the develloper to the integration team.
27 jun 2006 (18:00) : Testbed finish to configure but errors found during the configuration on gliteCE.
27 jun 2006 (14:23) : Repository ready we can restart.
27 jun 2006 (11:00) : Impossible to install UI and WN cause of a dep problem,
27 jun 2006 (10:00) : Start of the update.
26 jun 2006 (17:50) : certification repository ready. System ready to update.
26 jun 2006 (10:46:29) : request for gLite 3.0.1-cert
31 May 2006 (16:52) : End of the reinstallation.
30 May 2006 (9:44am) : Certification new YAIM start. Upgrade / reinstall from scratch of 1 WMS and 1 gliteCE. Few configuration problems found. A new update arrive tommorow.
22 May 2006 (4:40pm) : Upgrade/reinstalltion done.
19 May 2006 (4:40pm) : Repository is now ready. reinstallation from scratch of line 2.
19 May 2006 (2:00pm) : A showstopper problem apear on the integration. Manual fix require for the upgrade of RB.
18 May 2006 (4:00pm) : Start of the upgrade of 1a, 1b.
27 April 2006 (7:10 pm) : Upgrade finish.
SFT runs OK. Testbed is ready to test
2 May 2006 (2:OO pm) : Upgrade DPM / LFCS.
27 April 2006 (7:00 pm) : reinstallation and upgrade finish.
SFT runs OK. Testbed is ready to test
28 April 2006 (2:30 pm) : Started reinstallation from scratch of line 2 and upgrade 1a, 1b.
27 April 2006 (7:30 pm) : reinstallation and upgrade finish.
SFT runs OK. Testbed is ready to test
27 April 2006 (3:00 pm) : Started reinstallation from scratch of line 2 and upgrade 1a, 1b.
25 April 2006 (3:45 pm) : Line 2 reinstalaltion from scratch finish.
SFT runs OK. Testbed is ready to test
24 April 2006 (1:46 pm) : the problem has been solved. End of the upgrade of 1a 1b. Reinstallation from scratch line 2 start.
24 April 2006 (11:30 am) : Update rejected due to dependency problems.
21 April 2006 (5:50 pm) : End of the upgrade of lines 1a and 1b of the Cert Testbed.
One problem found during glite-CE configuration Bug : 16346
SFT runs OK. Testbed is ready to test
21 April 2006 (3:45 pm) : Started upgrade of lines 1a and 1b of the Cert Testbed.
21 April 2006 (03:44 pm) : Received update from integration
11 April 2006 (2:27pm): Reconfiguration of lxb1765 UI, Lponcet.
10 April 2006 (3:00pm): lxb1909 (LFC) used to finalise FTS configuration, Gergely Debreczeni
10 April 2006 (2:00pm): Testing Finshed
Three problems found.
7 April 2006 (2:00 pm) : Full upgrade of the Cert Testbed.
SFT runs OK. Testbed is ready to test
7 April 2006 (07:50 am) : Received update from integration
6 April 2006 (3:00 pm) : Finishing of the Upgrade & reinstalltion from scratch of line 2.
SFT runs OK. Testbed is ready to test.
5 April 2006 (15:10 pm) : Received update from integration.
6 April 2006 (7:15 pm) : Finishing of the Upgrade & reinstalltion from scratch of line 2.