A suggestion for a presentation layout of LCG/gLite tests can be found
here
.
Needs identified so far:
- Have the possibility to go down from a high level view to more detailed results. Tests could be grouped together. E.g. tests affecting the CE, WN,... or tests affecting some functionality (VOMS, RGMA,...). The groups overlap.
- The possibility to access earlier test results (archive).
- Test timing. Also in connection with history, i.e. being able to compare execution times of the same test.
- A graphical presentation of the testbed.
--
AndreasUnterkircher - 04 Apr 2006
Topic revision: r3 - 2006-04-06
- unknown