LCG Grid Deployment -
gLite Pre Production Services -
Pre Production Coordination -
PPS Current Programs
testing of SRMv2 in PPS
This is a distributed testing activity done in preproduction
The first task is to get the existing "pilot" SRMv2 testbed fully integrated in PPS (end-point visible and connected through FTS channels) - This phase should be completed by the 15th of May - Progresses in the integration are shown in the
SRM 2.2 pilot integration status page
The second task is to extend the test of SRMv2 to other PPS sites
IMPORTANT:
PPS Site Admins willing to configure SRMv2 at their sites within this pre-testing activity should make sure to match the
Requirements form Atlas for SRMv2
LHCB has also delivered a
Plan of use of PPS resources in the SRMv2 testing context.
Results of SAM tests
for SRMv2 nodes in PPS are already available.
"Who is doing What" (a schematic map)
WHAT |
SITE(s) |
NOTES |
Publishing end-points from the "pilot" testbed in the PPS Information System |
CERN_PPS, DESY-PPS, PPS-CNAF |
More details in SRM 2.2 pilot integration status |
Configuring end-points from the "pilot" testbed as "Close SEs" |
CERN_PPS, DESY-PPS, PPS-CNAF, PPS-LIP,PPS-PIC |
PPS-PIC volunteered, but still waiting response from coordination. They support all VOs except Alice Storm SE endpoint added to pps-cnaf site bdii |
Setting-up SRMv2 SEs (with uncertified sofware) |
CERN_PPS, PPS-IFIC,PPS-LIP |
Sites volunteered, but still waiting replies from coordination |
Setting-up FTSv2 channels |
CERN_PPS, PPS-CNAF |
Uncertified fixes to FTS need to be installed for that |
-- Main.aretico - 21 May 2007
Topic revision: r8 - 2007-06-22
- unknown