Week of 190909
WLCG Operations Call details
- For remote participation we use the Vidyo system. Instructions can be found here
.
General Information
- The purpose of the meeting is:
- to report significant operational issues (i.e. issues which can or did degrade experiment or site operations) which are ongoing or were resolved after the previous meeting;
- to announce or schedule interventions at Tier-1 sites;
- to inform about recent or upcoming changes in the experiment activities or systems having a visible impact on sites;
- to provide important news about the middleware;
- to communicate any other information considered interesting for WLCG operations.
- The meeting should run from 15:00 Geneva time until 15:20, exceptionally to 15:30.
- The SCOD rota for the next few weeks is at ScodRota
- General information about the WLCG Service can be accessed from the Operations Portal
- Whenever a particular topic needs to be discussed at the operations meeting requiring information from sites or experiments, it is highly recommended to announce it by email to wlcg-scod@cernSPAMNOTNOSPAMPLEASE.ch to allow the SCOD to make sure that the relevant parties have the time to collect the required information, or invite the right people at the meeting.
Best practices for scheduled downtimes
Monday
Attendance:
- local: Miro (DB, Chair), Borja (Monitoring), Vincent (Security), Kate (WLCG), Julia (WLCG), Gavin (Compute), Frank (Atlas)
- remote: Christoph (CMS), Darren (RAL), Xavier (KIT), Marcelo (CNAF), Mike (ASGC), Onno (NL-T1), Di (TRIUMF), Christian (NDGF), Vincenzo (EGI), Xin (BNL)
Experiments round table:
- ATLAS reports ( raw view) -
- Activities:
- tail of ongoing reprocessing campaign (using inputs from tape) ~20K files left at KIT
- CMS reports ( raw view) -
- Nothing major to report
- Minor thing: Lost 10 MC files from Tape at JINR GGUS:143034
- Lost statistics already invalidated in CMS bookkeeping.
- ALICE -
- NTR, at least until this afternoon
- LHCb reports ( raw view) -
- Activity:
- MC, user jobs and data restripping.
- Massive staging at all T1
- Issues:
- RAL:
- GGUS:142350
; Under investigation. User jobs increased, no queue. Issue seems to continue.
Sites / Services round table:
- ASGC:
- Some checksum issue when stage out file yesterday. The bigpanda was in maintenance this morning, and we will keep watching if this issue persists.
- BNL: NTR
- CNAF: NTR
- EGI: NTR
- FNAL: NTR
- IN2P3: NC
- JINR: NTR
- KISTI: NC
- KIT:
- New downtime at-risk for atlassrm-kit.gridka.de tomorrow 10 a.m. CEST ( GOCDB:27713
), where we will restart a couple of services in order to enable HTTP third-party-copy.
- Reminder: Nearline storage outage from Sep 16th till Sep 27th for all VOs!
- Reminder: Online storage outage on Sep 17th for all VOs ( GOCDB:27575
). We will try and keep the batch farm operative, so you still may send us jobs and work with remote storage at other sites.
- NDGF:
- During dcache headnodes update last week: dcache door disappeared when it was single point of failure. Draining was immediately stopped, but the failed headnode could not be resurrected without a restart.
- Pool upgrades at HPC2N tomorrow. Some ATLAS data unavailable for a few minutes.
- Broken tape found at UCPH. Leader pin had broken off. Files reported missing.
- NL-T1:
- Next week (Sept 16), we'll be upgrading dCache from 4.2 to 5.2, to support Xrootd TPC. GOCDB
- NRC-KI: NC
- OSG: NC
- PIC: NC
- RAL: NTR
- TRIUMF: NTR
- CERN computing services:
- OTG:0052156
: Monday 16th September (10.00 - 14.00). ce503, ce504, ce515, ce516 will be deleted (from Wigner) and recreated in Meyrin. They will be drained, but experiments are recommended to stop submitting to these asap.
- CERN storage services: NTR
- CERN databases: NTR
- GGUS: NTR
- Monitoring: NTR
- MW Officer: NTR
- Networks: NTR
- Security: NTR
AOB: