Run II Data Alignment

Automatic update of the constants

The automatic update of the constants was switched on the 23/10/2015 for the VELO and the 3/11/2015 for the Tracker, more information and monitoring plots can be found in the logbook http://lblogbook.cern.ch/Alignment+monitoring/

Versions of 2016 restarting of data taking

Period VeloGlobal VeloModules TTGlobal TTModules ITGlobal ITModules OTGlobalSorted ascending OTModules
First fill v69 v36 (v12) v55 (v37) v55 (v37) v66 (v38) v10 v55 (v37) v55 (v37)
2016-23-04 v71 v36 (v12) v55 (v37) v55 (v37) v66 (v38) v10 v55 (v37) v55 (v37)
2016-24-04 v71 v36 (v12) v56 v56 v67 v10 v56 v56

|We copied the version in parenthesis so that the starting version was the last one at the beginning of the data taking

List of alignment version used in hlt1, hlt2 and offline (consistently the same)

Time Validity Run Range Fill Range Velo Tracker Comments
2015-06-03 09:30 - 2015-06-12 11:50 ??-154624 3590 - 3854 - - 2012 tracker alignment, 2014 Velo alignment
2015-06-12 11:50 - 2015-06-13 12:25 154625-154742 3855 -3855 updated updated First 2015 alignment, 1 IT box misaligned by ~1-2 mm
2015-06-13 12:25 - 2015-07-07 13:01 154791-157174 3857- 3971 - updated First complete 2015 alignment (almost same quality as 2012 alignment)
2015-07-07 13:01 - 2015-08-14 17:20 157180-160155 3974-4207 - updated Adding the IT y alignment and small correlated tracker alignment update
2015-08-14 17:20 - 2015-08-19 18:20 160156-160606 4208-4231 - updated small tracker alignment update after magnet polarity flip
2015-08-19 18:20 - 2015-09-08 09:59 160716-162412 4243-4331 updated - VELO alignment update as constant y misalignment of ~2um seen in previous fills
2015-09-08 09:59 - 162413- 4332- - updated small tracker alignment update after magnet polarity flip
Summary of the version number used

Time Validity Run Range Fill Range VeloGlobal VeloModules TTglobal TTmodules ITglobal ITmodules OTglobal OTmodules
2015-06-03 09:30 - 2015-06-12 11:50 ??-154624 3590 - 3854 v2 v2 v4 v4 v4 v4 v4 v4
2015-06-12 11:50 - 2015-06-13 12:25 154625- 154742 3855 -3855 v5 v5 v7 v7 v7 v7 v7 v7
2015-06-13 12:25 - 2015-07-07 13:01 154791- 157174 3857- 3971 v5 v5 v8 v8 v9 v7 v8 v8
2015-07-07 13:01 - 2015-08-14 17:20 157180-160155 3974-4207 v5 v5 v9 v9 v10 v7 v9 v9
2015-08-14 17:20 - 2015-08-19 18:20 160156-160606 4208-4231 v5 v5 v10 v10 v11 v7 v10 v10
2015-08-19 18:20 - 2015-09-08 09:59 160716-162412 4243-4331 v12 v12 v10 v10 v11 v7 v10 v10
2015-09-08 09:59 - 162413- 4332- v12 v12 v14 v14 v15 v7 v14 v14

List of alignment version in /group/online/alignment

  • VELO Alignment
    • version
      • v1 latest 2012 alignment
      • v2 ted 2014
      • v3 using long tracks affected by IT misalignment (tracker v4) run 153543-153545
      • v4 equal to v2
      • v5 using refitted velo segnment
      • v6 - v16 ... obtained with the automatic procedure on the runs 158517 - 160597 always starting from the previous alignment. The alignment is updated using only the chi2 criterium so there is a new alignment per run. Fore some runs the alignment was run twice as a test
      • v12 obtained during tests automatisation (see previous bullet). It is obtained on the run 160298 starting from v11
      • v36 Modules and v39 Global are a copy of v12 so that when switching on the automatic update the first iteration (first fill after fill 4525) sees the actual conditions used
    • dof and constraint
      • Until fill 4495
        • Module Tx,Ty,Tz,Rz
        • 2 halves Tx,Ty,Tz,Rx,Ry,Rz
        • Constraints: average module position and average position of the 2 half
      • From fill 4496
        • 2 halves Tx,Ty,Tz,Rx,Ry,Rz
        • Constraints: average position of the 2 half

  • Tracker Alignment
    • version
      • v4 2012 alignment
      • v5 2012 alignment + IT survey
      • v6 between 154182 and 154193 with 10 iterations
      • v7 between 154182 and 154193 with other 10 iteration
      • v8 between 154182 and 154193. Start from v7 and corrected bug (affected IT1 A side box) converged after 7 iterations.
      • v9 IT Global: v8 + y-alignment. v7 IT Modules, v8 others
      • v10 IT Global, v7 IT Modules, v9 others: run 156916. Start from v8 + y-alignment (ITGlobal v9); converged after 2 iterations
      • v11 IT Global, v7 IT Modules, v10 others: run 160059. Start from previous conditions; converged after 3 iterations
      • v15 IT Global, v7 IT Modules, v14 others: run 162257. Start from previous conditions; converged after 2 iterations; magnet polarity flip.
      • v23 ITGlobal and v22 OT/TT Global/Modules are a copy of v15 (ITGlobal) and v14 (the others) so that when switching on the automatic update the first iteration (first fill after fill 4565) sees the actual conditions used
    • dof and constraint
      • TT modules Tx, Rz
      • TT layer Tz
      • IT boxes Tx, Tz, Rz
      • OT C-frame Tx, C-frame layers Tz
      • TT is fixed in its nominal z position and so is OT3-1.

Muon alignment

First alignment during the calibration run (run numbers 154860-154888) required a mechanical movement to get an optimal configuration (good projectively wrt the IP and symmetry wrt the beam pipe): With respect to the ideal projective position:

  • M2-M5 C-side ~3.5 mm closer from the beam,
  • M2-M5 A-side ~1.0 mm away from the beam
  • M1 C-side ~ 1.6 mm away from the beam,
  • M1 A-side ~ 2.2 mm closer to the beam.
Mechanical movement on 18th June to reassure a better projectivity and symmetry.
  • M1 A side: closed 2.45mm
  • M1 C side: opened 1.75 mm
  • M2-5 A side: closed 1.0 mm
  • M2-5 C side: opened 2.5mm

New alignment based on the tracking during EM (run 156916) fills. With respect to the ideal projective position:

  • A-side M2-M5 closer by ~ 1-1.5 mm,
  • C-side is almost as expected (within mm).

Change of look up table using this latest alignment (active from fill 3981). New LHCBCOND with Local tag muon-20150724 and IOV=8 Aug 2015

Prescaling Collisions for VELO alignment

the prescalingcan be changed in the file /group/online/dataflow/cmtuser/OnlineRelease/Online/FarmConfig/options/AlignWriter.opts at row 75:

"EvType=2;TriggerMask=0x0,0x00000020,0x0,0x0;VetoMask=0,0,0,0;MaskType=ANY;UserType=VIP;Frequency=PERC;Perc=0.001"

21/04/2018 changed from 100 to 0.1 for the 300 colliding bunches fill (6593)

12/04/2018 changed from 0.001 to 100 to have enough stats for the beginning of the data taking

The 12/04/2018 there was a change of the routing bit for collisions from 46 to 37 so the line modified was the one below

"EvType=2;TriggerMask=0x0,0x00004000,0x0,0x0;VetoMask=0,0,0,0;MaskType=ANY;UserType=VIP;Frequency=PERC;Perc=0.00001"

12/11/2017 changed from 0.0001 to 0.001 as we are collecting at the same time collisions and beamgas

19/07/2017 changed from 0.0001 to 0.00001 as also after previous change there was only a few percent of beamgas events collected

16/07/2017 changed from 0.001 to 0.0001 to see if it takes more than a few seconds to collect enough events

20/06/2017 changed from 100 to 0.001 as we have now more colliding bunches

27/05/2017 changed from 100 to 0.01 as we have now more colliding bunches

12/05/2017 changed from 1.01 to 100 to collect enough events with 2 colliding bunches

26/11/2016 changed to 100 to collect enough events with PbPb

15/03/2016 changed to 0.001 as was during 2015

22/04/2016 changed to 100 to collect quickly enough statistics with only 3 colliding bunches

14/05/2016 (after fill 4925) changed to 0.01 as now we have more colliding bunches

7/11/2015 changed to 1 to collect enough events with PbPb, let's see if it is enough

14/11/2015 changed back to 0.01 because it seems that would be enough

18/11/2015 changed to 1.01 for the p-Pb with the 8 TeV

-- SilviaBorghi - 2015-06-13


This topic: LHCb > WebHome > LHCbComputing > LHCbDetectorAlignment > 2015alignment
Topic revision: r46 - 2018-04-21 - GiulioDujany
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback