Procedure to Switch on/off crates of Control and Temperature Boards

The Marathon Controller Cards should be included in PVSS soon, such the the rather tedious procedure below should not be necessary anymore.

  1. Take an Online Notebook which has the WIENER USB Power Supply Control is installed (e.g. portable-04 or portable-05)
  2. Go to the rack D3E04.
  3. Only in case of switching on: Switch on AC/DC power converter of VELO or Pile-Up.
  4. Connect notebook and Marathon Controller (of VELO or Pile-Up as labeled) via a USB cable.
  5. Start the WIENER USB Power Supply Control by double-clicking the corresponding icon on the desktop.
  6. Select "All on/off" from the menu "Switch ..." (for switching on the Pile-Up: "Group1 on")
  7. Only in case of switching off: Switch off AC/DC power converter of VELO or Pile-Up.

-- OlafBehrendt - 28 Jul 2008


This topic: LHCb > WebHome > LHCbVELO > VELOOperatingManuals > VELOPowerOff > CBSwitchOff
Topic revision: r2 - 2008-07-30 - OlafBehrendt
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback