Sub-Farm D1A08 (vlan 508)
Sub-nets:
- 10.130.108.254 / 24
- 10.131.108.254 / 24
Ports:
Ports used:
Port |
host(s) |
Comment |
Gi 0/06 |
sw-d1a08-c1 |
farm uplink |
Switches
Type |
Name |
Serial |
MAC |
Control |
sw-d1a08-c1 |
TW546SD02K |
00156016DC00 |
Data |
sw-d1a08-d1 |
SG650TH067 |
0016B90D9E80 |
Computers
Steps
Install & Cable Control & Data switches |
X |
Enter info in hlt_nodes.csv |
X |
Connect the uplink in D2 to the main control switch |
X |
Configure the swiches addresses in DNS & DHCP |
X |
Configure SW-UX-01 |
X |
Power on the switches |
X |
Configure the control switch |
X |
Update the Data switch firmware |
X |
Configure the Data switch |
X |
Install the Server |
X |
Connect data cables in D2 & configure SW-DAQ-01 |
X |
Connect the storage uplink |
X |
Install and boot the nodes |
X |
Test the connectivity |
X |
Ask for PVSS license |
X |
Install the pvss_licence on the node and in /var/www/html/pvss/licences on sw-sx-01. |
X |
This topic: LHCb
> WebHome >
LHCbOnline >
NetworkManagement >
PortsUX01 > FarmA08
Topic revision: r2 - 2008-01-29 - LoicBrarda