Port | host(s) | Comment |
---|---|---|
Gi 0/42 | sw-d1d03-c1 | farm uplink |
Type | Name | Serial | MAC |
---|---|---|---|
Control | SW-D1D03-C1 | TW545SD0TX | 00:15:60:15:AF:00 |
Data | SW-D1D03-D1 | SG619TH030 | 00:16:35:b5:1a:c0 |
Name | Serial | base MAC | Data patched to | SW-DAQ-01 port |
---|---|---|---|---|
hlte03 | 7L3122J | 00:14:22:b0:c7:7d |
Install & Cable Control & Data switches | X |
Enter info in hlt_nodes.csv | |
Connect the uplink in D2 to the main control switch | |
Configure the swiches addresses in DNS & DHCP | |
Configure SW-UX-01 | |
Power on the switches | |
Configure the control switch | |
Update the Data switch firmware | |
Configure the Data switch | |
Install the Server | |
Connect data cables in D2 & configure SW-DAQ-01 | |
Connect the storage uplink | |
Install and boot the nodes | |
Test the connectivity | |
Ask for PVSS license | |
Install the pvss_licence on the node and in /var/www/html/pvss/licences on sw-sx-01. |