Port | host(s) | Comment |
---|---|---|
Gi 0/44 | sw-d1e06-c1 | farm uplink |
Type | Name | Serial | MAC |
---|---|---|---|
Control | sw-d1e06-c1 | TW546SD0TQ | 00:15:60:18:69:80 |
Data | sw-d1e06-d1 | SG652TH02A | 00:16:B9:0C:EE:00 |
Name | Serial | base MAC | Data patched to | SW-DAQ-01 port |
---|---|---|---|---|
hlte06 | HK3122J | 00:14:22:B0:C8:8B | ||
hlte0601 | BY5ZF2J | 00:13:72:f9:e7:64 | D2D02F13 | Gi 0/30 |
hlte0602 | 6Y5ZF2J | 00:13:72:fa:a2:e5 | ||
hlte0603 | 9Y5ZF2J | 00:13:72:fa:17:09 | D2D02F14 | Gi 0/31 |
hlte0604 | H1K4H2J | 00:15:c5:e5:3a:3e | ||
hlte0605 | 00:15:C5:E5:45:87 | D2D02F15 | Gi 0/32 | |
hlte0606 | 7Y5ZF2J | 00:13:72:f9:18:b4 | ||
hlte0607 | 5Y5ZF2J | 00:13:72:fa:3a:e9 | ||
hlte0608 | CVXXD2J | 00:13:72:fa:ec:43 | D2D08F13 | Gi 13/30 |
Install & Cable Control & Data switches | X |
Enter info in hlt_nodes.csv | X |
Connect the uplink in D2 to the main control switch | X |
Configure the swiches addresses in DNS & DHCP | X |
Configure SW-UX-01 | X |
Power on the switches | X |
Configure the control switch | X |
Update the Data switch firmware | X |
Configure the Data switch | X |
Install the Server | X |
Connect data cables in D2 & configure SW-DAQ-01 | X |
Connect the storage uplink | X |
Install and boot the nodes | X |
Test the connectivity | X |
Ask for PVSS license | X |
Install the pvss_licence on the node and in /var/www/html/pvss/licences on sw-sx-01. | X |