Sub-Farm D1E08 (vlan 908)

Sub-nets:

  • 10.130.152.254 / 24
  • 10.131.152.254 / 24

Ports:

  • Gi 0/46

Ports used:

Port host(s) Comment
Gi 0/46 sw-d1e08-c1 farm uplink

Switches

Type Name Serial MAC
Control sw-d1e08-c1 TW547SD046 00:15:60:19:96:00
Data sw-d1e08-d1 SG652TH01F 00:16:B9:0C:7f:00

Computers

Name SerialSorted ascending base MAC Data patched to SW-DAQ-01 port
hlte0804 DY5ZF2J 00:13:72:fb:08:80 D2D02F20 Gi 0/7
hlte08 13H222J 00:14:22:B0:C7:E9  
hlte0803 3Y5ZF2J 00:13:72:f9:18:5f D2D02F20 Gi 0/7
hlte0801 52K4H2J 00:15:c5:e5:44:54 D2D02F19 Gi 0/6
hlte0802 7ZYXD2J 00:13:72:fa:61:25 D2D02F19 Gi 0/6

Steps

Install & Cable Control & Data switches X
Enter info in hlt_nodes.csv X
Connect the uplink in D2 to the main control switch X
Configure the swiches addresses in DNS & DHCP X
Configure SW-UX-01 X
Power on the switches X
Configure the control switch X
Update the Data switch firmware X
Configure the Data switch X
Install the Server X
Connect data cables in D2 & configure SW-DAQ-01 X
Connect the storage uplink X
Install and boot the nodes X
Test the connectivity X
Ask for PVSS license X
Install the pvss_licence on the node and in /var/www/html/pvss/licences on sw-sx-01. X


This topic: LHCb > WebHome > LHCbOnline > NetworkManagement > PortsUX01 > FarmE08
Topic revision: r3 - 2008-04-08 - LoicBrarda
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback